USPTO serial 76709604
AICHI
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Nov 6, 2012
- Examiner
- WILKE, JOHN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with AICHI?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Yasuo Muramatsu
YASUO MURAMATSU MURAMATSU & ASSOCIATES114 PACIFICASUITE 310IRVINE, CA 92618Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric motors, not for land vehicles, namely, drives for motors; Pneumatic or hydraulic machines and instruments, namely, power operated blowers; Transmissions for machines, namely, linear actuators; Chemical processing machines and apparatuses, namely, mixing machines, drying machines, crushing machines, apparatuses for supplying crushed materials to mixing machines; DC/AC power generator, namely, solar-powered electricity generators, wind-powered electricity generators, diesel engines for power generation, other than for land vehicles, electric accumulators for power generation, electric generators and related equipment for hybrid power system; Machines for removing waste material, namely, apparatuses for removing polychlorobiphenyl in components, waste disposals for marine product processing industry | SECTION 8 - CANCELLED | Feb 28, 2012 |
| 009 | Power distribution or control machines and apparatuses, namely, electric transformers, electric resistors, electrical reactors, balancers, voltage regulators, power distribution boards, cubicle type high voltage power receiving units, equipment for electric power substations, electric control panels, electrical components in the nature of protection relays, trip unit for circuit breakers, uninterruptible electrical power supplies, circuit breakers, electric converters, DC/AC power converters, inverters, electrical power distribution blocks, circuit closers; Electrical charging apparatuses, namely, charging stations for charging electric vehicles, charging stations for air conditioner and refrigerator on a truck while stopping the engine, apparatuses for supplying electric power outside without making a hole on wall or window; Safety devices, namely, load sensors for use in preventing overloading, power transformers; Electronic machines and apparatuses, namely, transducers for converting between optical signals and electrical signals, electronic printers for printing, transmitting, storing and archiving information related to power system faults, electronic circuit boards for supplying electric power to air cleaning devices, electronic circuit boards for controlling operations of air cleaning devices; Telecommunication devices and apparatuses, namely, wired or wireless repeaters used for communication with wireless base stations, transponders, electronic apparatuses for remote control of electrical distribution; Electronic communication instruments and components, namely, digital transmitters, digital apparatuses for remote control of electrical distribution; Anti-theft warning apparatuses and surveillance products, namely, electronic components of security systems; Electric door openers, namely, electric shutter openers and closers; Magnetic cores, resistance wires and electrodes, namely, solenoid valves, electromagnetic switches | SECTION 8 - CANCELLED | Feb 28, 2012 |
| 037 | Construction, namely, plant construction, maintenance and construction project management services for businesses in energy production and transmission sectors. Page 2 of 5 | SECTION 8 - CANCELLED | Feb 28, 2012 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 7, 2019 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Nov 23, 2016 | CORV | REVIEW OF CORRESPONDENCE COMPLETE - ADDRESS NOT UPDATED | — |
| Nov 23, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 15, 2016 | PAPER RECEIVED | — | |
| Nov 6, 2012 | R.SR | REGISTERED-SUPPLEMENTAL REGISTER | Your mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application. |
| Oct 2, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 2, 2012 | AAUA | NOTICE OF ACCEPTANCE OF AMENDMENT TO ALLEGE USE MAILED | — |
| Oct 1, 2012 | CNTA | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | — |
| Oct 1, 2012 | IUAA | USE AMENDMENT ACCEPTED | — |
| Sep 28, 2012 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Sep 28, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 28, 2012 | AUPC | AMENDMENT TO USE PROCESSING COMPLETE | — |
| Sep 21, 2012 | IUAF | USE AMENDMENT FILED | — |
| Sep 21, 2012 | PAPER RECEIVED | — | |
| Mar 9, 2012 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 9, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 9, 2012 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Feb 21, 2012 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Feb 6, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 3, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jan 20, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 20, 2012 | CNEA | EXAMINER'S AMENDMENT MAILED | — |
| Jan 19, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 19, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 19, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 8, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 2, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |