USPTO serial 76718199
REMITITE
Reviewed by CopyMark Law Group
Reg. 5282994Status 711
- Filing date
- Status date
- Registration date
- Sep 12, 2017
- Examiner
- JACKSON, STEVEN W
- Law office
- TMEG LAW OFFICE 107
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with REMITITE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
AALTEN, NL
Worcestershire, GB
Worcestershire, GB
Worcestershire, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Eleanor M. Yost
Eleanor M. Yost Carlton Fields, PAPO Box 3239Attn: IP Dept.Tampa, FL 33601-3239Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 017 | Silicone and EVA rubber, gutta-percha, raw or semi-worked gum, asbestos, mica and goods made from these materials and not included in other classes, namely, fire seals for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution machines, power generators, industrial furnaces and chemical plants, smoke seals for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution machines, power generators, industrial furnaces and chemical plants, acoustic seals for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution machines, power generators, industrial furnaces and chemical plants, thermal seals for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution machines, power generators, industrial furnaces and chemical plants, fire-retardant cable seals for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution machines, power generators, industrial furnaces and chemical plants, fire-retardant pipe seals for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution machines, power generators, industrial furnaces and chemical plants, packing foams in sheet form, non-permanent adhesive putties, fire-retardant foams for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution machines, power generators, industrial furnaces and chemical plants, fire-retardant sealants, thermally-expandable sealants, and thermally-expandable polymers; plastics in extruded form of bars, blocks, rods, sheets and tubes for use in manufacturing; moldable plastic and rubber joint caulking compounds; container packing for transportation; intumescent firestop putty; flexible pipes, not of metal; sealing pipe gaskets and sheets of graphite-based material for use as gaskets and insulating sleeves for machinery, cables, pipes and wiring; unvulcanized rubberlike sleeves for use in conduits through which pipes, tubes or cables extend; unvulcanized rubberlike sealant for sealing conduits through which pipes, tubes or cables extend; silicon based sealant; rubber or rubberlike sleeves that are fire-resistant and/or intumescent; non-metal gaskets | SECTION 7(e) - CANCELLED | — |
| 019 | NON-METAL BUILDING MATERIALS, namely, FLOOR, CEILING AND WALL PANELS, WALLS AND FASCIA; NON-METALLIC RIGID PIPES FOR BUILDING; ASPHALT, PITCH AND BITUMEN; NON-METALLIC TRANS-PORTABLE BUILDINGS, namely, OF WOOD, PLASTICS AND PRECAST CONCRETE; MONUMENTS, NOT OF METAL | SECTION 7(e) - CANCELLED | — |
| 037 | BUILDING CONSTRUCTION; BUILDING REPAIR; INSTALLATION OF ELECTRICAL SYSTEMS, PIPE WORK, INTUMESCENT MATERIALS, FIRE RESISTANT MATERIALS AND FITTINGS, ANTI-VIBRATION MACHINE FITTINGS AND SEALING MATERIALS | SECTION 7(e) - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BEELE ENGINEERING B.V.
- Other trademarks owned by Jackson, Derek
- Other trademarks owned by Jackson, Derek
- Other trademarks owned by Jackson, Derek
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 037
- Similar marks named REMITITE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 15, 2022 | NCS7 | NOTICE OF CANCELLATION SEC. 7 SURRENDER EMAILED | — |
| Jun 14, 2022 | C7.. | CANCELLED SECTION 7-TOTAL | — |
| Jun 14, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 1, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 19, 2022 | C7RF | REQUEST FOR SECT 7 TOTAL SURRENDER FILED | — |
| Jan 19, 2022 | ES7S | TEAS SECTION 7 SURRENDER RECEIVED | — |
| Jan 23, 2019 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 12, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 27, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 27, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 7, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 22, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 4, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 10, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 10, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 10, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 10, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 17, 2016 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 17, 2016 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 17, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 28, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 28, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 22, 2016 | ALIE | ASSIGNED TO LIE | — |
| Sep 16, 2016 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 16, 2016 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 16, 2016 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 6, 2016 | PAPER RECEIVED | — | |
| Mar 16, 2016 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 16, 2016 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 25, 2016 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Feb 25, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 18, 2016 | ALIE | ASSIGNED TO LIE | — |
| Feb 11, 2016 | PAPER RECEIVED | — | |
| Oct 9, 2015 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 9, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 6, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 3, 2015 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 29, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |