USPTO serial 77001768
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
CALGARY, ALBERTA, CA
Calgary, Alberta, CA
Calgary, Alberta, CA
Calgary, Alberta, CA
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
James R. Gourley
James R. Gourley CARSTENS, ALLEN & GOURLEY, LLP7500 Dallas PkwySuite 300Plano, TX 75024| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Oil and natural gas production and processing equipment, namely, compressors for compressing natural gas, crude oil separators, satellite inlet headers, well gatherers, electrostatic treaters, sour gas amine sweetening towers for use in gas processing, hydrocarbon dew point recovery refrigeration compressors, gas to gas exchangers and low temperature separators, acid gas injection compressors, oil well pumping machines, compressors for compressing natural gas; generators and generation systems, namely, electric generators and pumps; manufactured oil field equipment, namely, separators | ACTIVE | Aug 1, 2001 |
| 009 | Electrical transmission apparatus, namely, transformers, switches and controllers; manufactured oil field equipment, namely, level gauges; flare stack igniter systems composed of fire igniters for waste gases and oils and parts therefor; and electronic control systems for electric ignition devices; electrical transmission apparatus, namely, conductors and regulators; manufactured oil field equipment, namely, oil and natural gas samplers and meter skids, namely, a portable structural skid base fitted with pipe, pipe fittings, valves, process sensors, flow meters, and metering electronics intended for the volumetric measurement of gas or liquids through a pipeline | ACTIVE | Aug 1, 2001 |
| 011 | manufactured oil field equipment, namely, line heaters, dehydrators, heaters; air pollution control systems and equipment, namely, retractable and stationary electronic flare igniters designed for any size of flare stack both on shore and off shore, ground flares and enclosed ground flares, and electronic flare igniters designed for any size of flare stack both on shore and off shore, ground flares and enclosed ground flares to optimize the management of flare gas releases; oil and natural gas production and processing equipment, namely, line heater skids and desalters, heaters; sulphur recovery plants, namely, process vessels and heaters employed in a sulphur recovery plant; gas sweetening facilities, namely, glycol dehydration towers | ACTIVE | Aug 1, 2001 |
| 035 | distributorship in the field of oil field machinery and parts | ACTIVE | Jan 8, 2001 |
| 037 | construction, installation and repair services relating to gas compression and gas powered systems including repair of compression systems and gas powered systems, including systems for use in the production and processing of natural gas; refurbishing services, namely, revamping, reengineering and reapplication of gas compression equipment and components; rebuilding and servicing of electrical plants, gas compressor units, pump units, power equipment, engines and parts therefor; servicing and rebuilding of electrical plants, compressor units, pumping units, power transmission equipment and engines; construction, installation, maintenance relating to gas pipe line compressor stations and gas plant facilities; installation of air pollution control systems and equipment | ACTIVE | Jan 8, 2001 |
| 040 | Custom fabrication of oil and natural gas production and processing equipment; custom fabricating of electrical plants, compressor units, pumping units, power transmission equipment and engines; custom fabricating of electric plants, gas compressor units, pump units, power equipment and engines and parts therefor; custom manufacturing and fabricating services relating to gas compression and gas powered systems; custom assembly of compression systems and gas powered systems, including systems for use in the production and processing of natural gas; custom manufacturing of electrical and instrumentation equipment, namely, process controls and control panels for the construction sector of the energy, mining, power and pulp and paper industries; custom manufacturing and fabrication services relating to gas pipe line compressor stations and gas plant facilities; custom fabrication of air pollution control systems and equipment; leasing of oil and natural gas production and processing equipment, namely, compression systems and gas powered systems | ACTIVE | Jan 8, 2001 |
| 041 | on-site training for the operation and maintenance of compression and gas power systems | ACTIVE | Aug 1, 2001 |
| 042 | design of electrical and instrumentation equipment, namely, process controls and control panels for the construction sector of the energy, mining, power and pulp and paper industries; consulting services, namely, providing technology expertise to the construction sector of the energy, mining, power and pulp and paper industries; engineering services relating to gas pipe line compressor stations and gas plant facilities; custom design and drafting plans for air pollution control systems and equipment; design of gas compression and gas powered systems; engineering of compression systems and gas powered systems; design of oil and natural gas production and processing equipment | ACTIVE | Aug 1, 2001 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 14, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 14, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 14, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 29, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 29, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 12, 2018 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Oct 12, 2018 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Oct 12, 2018 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Oct 12, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 3, 2018 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Oct 1, 2014 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - MAILED | — |
| Oct 1, 2014 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 1, 2014 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 24, 2014 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 21, 2010 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jun 18, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 7, 2008 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 22, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 2, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 17, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 16, 2008 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 16, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 16, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 16, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 13, 2008 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| May 23, 2008 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| May 9, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 8, 2008 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| May 8, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 8, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 8, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 22, 2008 | RECD | ACTION DENYING REQ FOR RECON MAILED | — |
| Apr 22, 2008 | CNCF | ACTION CONTINUING FINAL - COMPLETED | — |
| Apr 17, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Apr 17, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2008 | PAPER RECEIVED | — | |
| Oct 9, 2007 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 9, 2007 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 18, 2007 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Sep 18, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 17, 2007 | ALIE | ASSIGNED TO LIE | — |
| Aug 13, 2007 | PAPER RECEIVED | — | |
| Feb 9, 2007 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 8, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 7, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 22, 2006 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Sep 21, 2006 | NWAP | NEW APPLICATION ENTERED | — |