Drawing for WHERE BEING FIRST IS EXPECTED

USPTO serial 77007002

WHERE BEING FIRST IS EXPECTED

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
RINKER, ANTHONY MICHAEL
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with WHERE BEING FIRST IS EXPECTED?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael F. Krieger

MICHAEL F KRIEGER KIRTON & MCCONKIE60 E S TEMPLE1800 EAGLE GATE TWRSALT LAKE CITY, UT 84111

Goods and services

ClassDescriptionStatusFirst use
006High performance manually operated butterfly valves; slide valves; metal transfer lines; metal oil well production risers; all for use in the petroleum processing, nuclear power, and defense industries; concrete anchors, metal threaded fasteners, metal bolts, hydra-nets, namely, wire nets, metal doors, snubbers and equipment hatches, metal gates for spent nuclear fuel pools, undercut concrete anchors all for use in nuclear power plants and the defense industriesACTIVE—
007Hydro-treaters, namely, free- water knockouts for use in the petroleum industry; air suction machines; cyclones, comprising air blast gates for separating agricultural and mineral products according to size; cutting tools for machine tools, namely, replacement drill heads; pneumatic components, namely, leak-less smart valves all for use in the petroleum processing, nuclear power, and defense industries; integral permanent magnetic water pumps; seal-less centrifugal axial-filled water pumps used in motors; sub-sea pumping and hazardous waste pump systems comprised of submerged canned electric motor and multi-phase pumps for deep sea oil recovery; integrated marine propulsion motors; advanced high speed electric generators incorporating high power electric control and conditioning equipment; remotely operated diamond pointed wire cutting tools for use in nuclear power plants and the defense industriesACTIVE—
009Spring- loaded and pilot-operated pressure release valves, high performance automatically operated butterfly valves, severe service high temperature electronic control valves, electro-hydraulic valve actuators, portable pressure vessels; electronic power recovery control valves for regulating the flow of gas and liquids; solenoid operated isolation and control valves, electronic pilot-operated pressurizer and main steam safety release valves, inverted cone safety release valves for gas and liquid, severe service electronic motor operated valves; all for use in the petroleum processing, nuclear power, and defense industries; delayed coking and heading systems comprised of instruments for measuring the coking index of fuels; electromagnetic aircraft watch systems, namely, radar; plastic protective covers for electrical distribution phase conductors and associated hardware, namely, arrestors for use in aircraft carriers; pulsed power supplies for fully fieldable electro-magnetic guns all for the nuclear and defense industries; electrical controls for use in nuclear power plants and the defense industries; Diagnostic tools, namely, on-board diagnostic serial interfaces for troubleshooting nuclear reactor systems for use in nuclear power plants and the defense industries; electronic steam generator controls; Analytical calorimetric instrumentation not for medical use, for monitoring nuclear reactors in the defense industry; digital signaling processing cards, electric digital signal read out meters, electronic reactor plant controls, computer software support automation programs for use in monitoring electronic safety valve networks for nuclear reactors in the defense industryACTIVE—
011Pressure vessels, namely, hot water heaters and industrial boilers, nuclear reactors, Regenerator unit internal components, namely ceramic substrates all for use in the petroleum processing, nuclear power, and defense industries; nuclear reactor components, namely, boiler circulation pumps and motors, reactor coolant pumps, seals and motors, control rod drive mechanisms, primary loop valves, specialty airlocks for use in nuclear power plants and the defense industryACTIVE—
037Installation, repair and maintenance services, namely, onsite cutting, seismic testing with a tri-axial table of pressure release devicesACTIVE—
040Custom modification of commercial off-the-shelf computer, testing, and diagnostic equipment, namely, ruggedizing equipment to fulfill military requirements for specialized applicationsACTIVE—
042Quality control for others, namely, acceptance testing for the nuclear energy, petroleum processing and defense industries; integration of computer network and system services for the nuclear energy, petroleum processing and defense industriesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Apr 15, 2008MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Apr 15, 2008ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Aug 14, 2007NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 22, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 2, 2007NPUBNOTICE OF PUBLICATION—
Mar 27, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 26, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 23, 2007XAECEXAMINER'S AMENDMENT ENTERED—
Mar 23, 2007GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 23, 2007CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 22, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 22, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 22, 2007ALIEASSIGNED TO LIE—
Feb 16, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 22, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 22, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 8, 2007DOCKASSIGNED TO EXAMINER—
Sep 29, 2006NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance