Drawing for DEFENCELL

USPTO serial 77069732

DEFENCELL

Reviewed by CopyMark Law Group

Reg. 3756420Status 800Registered
Filing date
Status date
Registration date
Mar 9, 2010
Examiner
MEYERS, MORGAN LAURA
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with DEFENCELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

April L. Besl

April L. Besl Dinsmore & Shohl LLP255 East Fifth StreetSuite 1900Cincinnati, OH 45202

Goods and services

ClassDescriptionStatusFirst use
006Metallic building materials, NAMELY, METAL BUILDING PANELS, METAL ROOFING, Metal decking boards, METAL CEILING PANELS, METAL DOOR AND WINDOW FRAMES AND CASINGS, METAL BOARDS FOR FLOORING, METAL BEAMS, GIRDERS AND JOISTS, METAL SHEETS AND PLATES; metallic materials for civil engineering, drainage, erosion, soil control and landscaping purposes, NAMELY, METAL PANELS, METAL BEAMS, GIRDERS AND JOISTS, METAL SHEETS AND PLATES; structural materials made from metal, NAMELY, FRAMEWORKS OF METAL FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, REINFORCING MATERIALS OF METAL FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, METAL CEILING SUPPORTS, METAL FLOORING SUPPORTS, METAL ROOFING SUPPORTS, BUILDING LININGS OF METAL, BUILDING WALL CLADDING OF METAL; metallic cages STRUCTURES and METALLIC MULTI-COMPARTMENTAL STRUCTURES for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; metallic multi-compartmental structures for forming bastions and gabionsACTIVE—
017Plastics in extruded form FOR GENERAL INDUSTRIAL USE; plastics IN EXTRUDED FORM for agricultural, horticultural, and/or civil engineering use, NAMELY, CELLULAR PLASTIC SHEETS FOR SLOPE STABILIZATION AND/OR SOIL RETENTION; plastic sheets; plastic films; packing and stopping materials FOR FORMING SEALS; INSULATING MATERIALS, NAMELY, SHEETS OF PLASTIC FABRIC AND POLYURETHANE FOAM FOR USE IN BUILDING; fibers of plastic materials FOR USE IN BUILDINGACTIVE—
019Non-metallic building materials, NAMELY, NON-METALLIC BUILDING PANELS, NON-METALLIC ROOFING, NON-METALLIC decking boards, NON-METALLIC CEILING PANELS, NON-METALLIC DOOR AND WINDOW FRAMES AND CASINGS, NON-METALLIC BOARDS FOR FLOORING, NON-METALLIC BEAMS, GIRDERS AND JOISTS, NON-METALLIC SHEETS AND PLATES; geotextile materials, NAMELY, GEOTEXTILE FABRIC AND SHEETING FOR BUILDING, CONSTRUCTION, CIVIL ENGINEERING, DRAINAGE, EROSION, SOIL CONTROL AND LANDSCAPING; non-metallic materials, NAMELY, NON-METALLIC PANELS, NON-METALLIC BEAMS, GIRDERS AND JOISTS, NON-METALLIC SHEETS AND PLATES; non-metallic structural materials, NAMELY, NON-METALLIC FRAMEWORKS FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, NON-METALLIC REINFORCING MATERIALS FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, NON-METALLIC CEILING SUPPORTS, NON-METALLIC FLOORING SUPPORTS, NON-METALLIC ROOFING SUPPORTS, NON-METALLIC BUILDING LININGS, NON-METALLIC BUILDING WALL CLADDING; non-metallic structures and NON-METALLIC MULTI-COMPARTMENTAL STRUCTURES for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; geotextile structures for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; non-metallic cage structures and non-metallic multi-compartmental structures for forming bastions and gabions; plastic structures for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; GEOTEXTILES FOR USE IN CONNECTION WITH PUBLIC WORKS CONSTRUCTION, MILITARY DEFENSE CONSTRUCTION, SOIL STABILIZATION AND FLOOD DEFENSE CONSTRUCTIONACTIVE—
022Synthetic textile fibers; fibers of plastics materials, NAMELY, NATURAL PLANT FIBERS FOR USE AS FILLER FOR PLASTIC COMPOUNDS THAT ARE USED IN THE FURTHER MANUFACTURE OF PLASTIC BUILDING MATERIALSACTIVE—
024NON-WOVEN MATERIALS, FABRICS AND SHEETS MADE FROM POLYPROPYLENE AND/OR POLYETHYLENE; NON-WOVEN MATERIALS, FABRICS AND SHEETS MADE FROM POLYPROPYLENE AND/OR POLYETHYLENE FOR USE AS COVERINGS OR LININGS FOR BASTION DEFENSE WALLS, GABIONS AND OTHER PROTECTIVE STRUCTURESACTIVE—
037building construction services; BUILDING maintenance and repair services; CONSTRUCTION project management; construction management; LAND DEVELOPMENT SERVICES, NAMELY, PLANNING AND LAYOUT OF RESIDENTIAL AND/OR COMMERCIAL COMMUNITIES, AND INSTALLATION OF IRRIGATION SYSTEMS; BUILDING CONSTRUCTION CONSULTANCY; CONSTRUCTION LANDSCAPING CONSULTANCY; new construction site development AND EARTHWORKS CONSULTANCYACTIVE—
042ENGINEERING; CIVIL ENGINEERING; STRUCTURAL ENGINEERING; GEO-TECHNICAL AND/OR ENVIRONMENT ENGINEERINGACTIVE—
045[ Security guard services for the protection of property and individuals ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 14, 2025ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jun 28, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Feb 3, 2021ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 20, 2021ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Sep 9, 2020ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Aug 12, 2020ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 21, 2020NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
May 21, 2020RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
May 21, 202089AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
May 21, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 9, 2020E89RTEAS SECTION 8 & 9 RECEIVED—
Jan 15, 2020ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 9, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Apr 5, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 5, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 17, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 17, 2016C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 16, 2016EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jul 13, 2016PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Jul 13, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 8, 2016EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Mar 30, 2016PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Mar 30, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 9, 2016E815TEAS SECTION 8 & 15 RECEIVED—
Dec 16, 2015ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 22, 2014ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Mar 9, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 28, 2010DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Jan 4, 2010AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 30, 2009IUCNNOTICE OF ALLOWANCE CANCELLED—
Dec 30, 2009D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jul 14, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 21, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 1, 2009NPUBNOTICE OF PUBLICATION—
Mar 19, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 19, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 19, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Mar 19, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 19, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 19, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 19, 2009ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 9, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 25, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 23, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 10, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 9, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 9, 2009ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 14, 2008RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Apr 14, 2008RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Apr 10, 2008RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Apr 10, 2008ALIEASSIGNED TO LIE—
Oct 10, 2007GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 10, 2007GNSLLETTER OF SUSPENSION E-MAILED—
Oct 10, 2007CNSLSUSPENSION LETTER WRITTEN—
Oct 9, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 9, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 9, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 13, 2007GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Aug 13, 2007GNSLLETTER OF SUSPENSION E-MAILED—
Aug 13, 2007CNSLSUSPENSION LETTER WRITTEN—
Jul 27, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 27, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 27, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 16, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 16, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 16, 2007DOCKASSIGNED TO EXAMINER—
Feb 23, 2007ALIEASSIGNED TO LIE—
Jan 26, 2007AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Jan 26, 2007PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Dec 27, 2006NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance