USPTO serial 77127827
DELTARAIL
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 13, 2011
- Examiner
- RAPPAPORT, SETH
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with DELTARAIL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Derby, Derbyshire, GB
Derby, Derbyshire, GB
Derby, Derbyshire, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
William H. Holt
William H. Holt Law Offices of William H. Holt14584 West Dartmouth AvenueLakewood, CO 80228UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | SAFETY EQUIPMENT, NAMELY, ELECTRICALLY OPERATED SANDERS FOR USE ON RAILWAY VEHICLES TO ADDRESS WHEEL/RAIL LOW ADHESION CONDITIONS | SECTION 8 - CANCELLED | — |
| 009 | ELECTRONIC AND ELECTRICAL APPARATUS FOR TRACKING TRAINS, CHECKING RAIL TRACKS, POINTS AND SIGNALING IN THE RAILWAY INDUSTRY; MEASUREMENT AND COMMUNICATION APPARATUS AND DEVICES FOR USE IN TRACKING TRAINS AND PROVIDING REAL-TIME INFORMATION ON TRAIN MOVEMENT, NAMELY ODOMETERS, ELECTRIC GPS SENSORS AND ELECTRONIC INERTIAL SENSORS; COMPUTER SOFTWARE FOR MANAGEMENT OF TRAINS, ROLLING STOCK, RAIL TRACK VEHICLES, RAIL TRACK, POINTS AND SIGNALING SYSTEMS IN THE RAILWAY INDUSTRY; COMPUTER SOFTWARE FOR MANAGEMENT OF RAILWAY NETWORKS; COMPUTER SOFTWARE FOR PROCESSING AND MANAGING SUPPLIES USED IN THE OPERATION AND MAINTENANCE OF THE RAILWAYS AND ROAD TRANSPORT FLEETS; COMPUTER SOFTWARE FOR TRANSACTION PROCESSING AND MANAGEMENT IN RELATION TO OPERATIONAL AND MAINTENANCE ACTIVITIES OF THE RAILWAYS AND ROAD TRANSPORT FLEETS; COMPUTER SOFTWARE FOR ARCHIVING DATA; COMPUTER SOFTWARE FOR SETTING UP, MANAGEMENT AND ADMINISTRATION OF A WEBSITE; COMPUTER SOFTWARE FOR MAIL PROCESSING PURPOSES; RESOURCE MANAGEMENT SOFTWARE FOR MANAGING OPERATIONS STAFF AND MAINTENANCE STAFF IN THE RAILWAY INDUSTRY; COMPUTER SOFTWARE FOR MODELING PERFORMANCE OF RAILWAY VEHICLES AND RAILWAY INFRASTRUCTURE; COMPUTER SOFTWARE FOR MODELING THE COMMAND AND CONTROL OF SIGNALING SYSTEMS, AND FOR SIMULATING RAILWAY OPERATION; COMPUTER HARDWARE AND SOFTWARE FOR DATA ACQUISITION AND MONITORING OF DATA RELATING TO THE CONDITION OF RAILWAY VEHICLES; OPTICAL INSPECTION EQUIPMENT FOR MONITORING COMPONENTS OF RAILWAY VEHICLES, NAMELY CAMERAS AND LASER SCANNERS; ELECTRICAL AND OPTICAL INSTRUMENTS FOR USE ON RAILWAY VEHICLES TO MONITOR RAILWAY LINES, TO MONITOR VEHICLES OR VEHICLE COMPONENTS, INCLUDING AXLES, BEARINGS, WHEELS, DOORS, ENGINES AND BRAKES, TO MONITOR VEHICLE LOADS OR PASSENGERS, AND TO MONITOR INTERACTIONS BETWEEN RAILWAY VEHICLES AND RAILWAY LINES, NAMELY TEMPERATURE SENSORS, VIBRATION SENSORS, NOISE SENSORS, WEIGHT SENSORS AND STRESS SENSORS; MEASURING AND MONITORING SYSTEMS PRIMARILY CONSISTING OF ELECTRIC SENSORS, NAMELY, FRICTION SENSORS, ENGINE POWER SENSORS, SPEED SENSORS, NOISE SENSORS, ACCELEROMETERS, DISPLACEMENT SENSORS AND STRESS SENSORS FOR RAILWAY INFRASTRUCTURE, FOR MONITORING LOW ADHESION AT THE WHEEL/RAIL INTERFACE, FOR MONITORING ENGINE PERFORMANCE, FOR MONITORING PASSENGER COMFORT, FOR MONITORING TRACK GEOMETRY, FOR MONITORING WHEEL-RAIL FORCES, AND FOR MONITORING PANTOGRAPH/OVERHEAD LINE FORCES; ELECTRONIC INSPECTION AND TESTING EQUIPMENT, NAMELY, ACCELEROMETERS, ANEMOMETERS, ANTENNAS, COMPUTER HARDWARE, DATA LOGGERS, DIGITAL CAMERAS, DISPLACEMENT TRANSDUCERS, ELECTRONIC TAGS FOR GOODS, FLOW METERS, HANDHELD COMPUTERS, LASER GENERATORS, POTENTIOMETERS, PRESSURE SENSORS, SOUND LEVEL METERS, TELEMETERS, THERMOCOUPLES, AND WIND VANES, AND COMPUTER HARDWARE AND APPLICATION SOFTWARE FOR MEASURING THE PERFORMANCE OF ENGINES, WHEELS, BRAKES AND ELECTROMAGNETIC EQUIPMENT ON RAILWAY VEHICLES; ELECTRONIC AND ELECTRICAL EQUIPMENT, NAMELY, ACTUATORS, PRESSURE SENSORS, MICRO-SWITCHES, DISPLACEMENT TRANSDUCERS, DATA LOGGERS AND COMPUTER HARDWARE FOR OPERATING RAILWAY VEHICLE DOORS | SECTION 8 - CANCELLED | — |
| 012 | FITTINGS FOR THE INTERIOR AND EXTERIOR OF RAILWAY CARRIAGES AND OTHER RAILWAY VEHICLES, NAMELY, VEHICLE STRUCTURAL BODY PARTS, VEHICLE DOORS, VEHICLE WINDOWS, LUGGAGE RACKS, AND VEHICLE SEATS | SECTION 8 - CANCELLED | — |
| 035 | CONSULTANCY SERVICES IN THE FIELD OF BUSINESS MANAGEMENT AND BUSINESS STRATEGY; PROFESSIONAL BUSINESS CONSULTANCY SERVICES IN THE FIELD OF MONITORING OF RAILWAY VEHICLE AND RAILWAY INFRASTRUCTURE OPERATIONS; BUSINESS CONSULTANCY SERVICES IN THE FIELD OF THE BUSINESS ASSESSMENT AND MANAGEMENT OF TECHNICAL, OPERATIONAL, AND BUSINESS RISKS IN THE RAILWAY INDUSTRY | SECTION 8 - CANCELLED | — |
| 037 | PROFESSIONAL CONSULTANCY SERVICES IN THE FIELD OF SUPERVISING OF CONSTRUCTION OF RAILWAY PLANT; CONSULTANCY SERVICES IN THE FIELD OF REPAIR OF RAILWAY PLANT AND RAILWAY VEHICLES; CONSTRUCTION PROJECT MANAGEMENT SERVICES; CONSTRUCTION PROJECT MANAGEMENT RELATED TO THE MAINTENANCE, REPAIR, REFURBISHMENT AND OVERHAUL OF RAILWAY VEHICLES; CONSTRUCTION PROJECT MANAGEMENT RELATED TO THE CONSTRUCTION, MAINTENANCE, REPAIR, REFURBISHMENT AND OVERHAUL OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY VEHICLE REFURBISHMENT; MAINTENANCE AND CONSTRUCTION OF RAILWAY INFRASTRUCTURE, NAMELY, BRIDGES, BALLAST, RAIL AND TRACK COMPONENTS; CONSULTANCY SERVICES CONCERNING INSTALLATION AND MAINTENANCE IN THE FIELD OF VENTILATION OF RAILWAY VEHICLES TO ENSURE PASSENGER COMFORT; RAILWAY REPAIR CONSULTANCY SERVICES, NAMELY, CONSULTANCY SERVICES AND ADVICE TO EVALUATE THE NEED FOR REPAIR OF RAILWAY VEHICLES | SECTION 8 - CANCELLED | — |
| 040 | PROFESSIONAL CONSULTANCY SERVICES IN THE FIELD OF THE CONSTRUCTION OF RAILWAY VEHICLES; RAILWAY VEHICLE MANUFACTURING PROJECT MANAGEMENT SERVICES; CONSULTANCY SERVICES IN THE FIELD OF MANUFACTURE OF EQUIPMENT FOR USE AS PART OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF THE MANUFACTURE OF TRACTION AND ROLLING STOCK FOR RAILWAYS | SECTION 8 - CANCELLED | — |
| 041 | TRAINING SERVICES FOR RAILWAY STAFF BY WAY OF COURSES AND SEMINARS IN THE FIELDS OF RAILWAY OPERATIONS, SIGNALING AND TIMETABLING, IN THE FIELD OF MANAGEMENT AND MAINTENANCE OF RAIL VEHICLES, AND IN THE FIELD OF RAIL VEHICLE DYNAMICS; TRAIN DRIVER TRAINING COURSES ON HOW TO RESPOND TO LOW ADHESION CONDITIONS ON THE RAILWAY | SECTION 8 - CANCELLED | — |
| 042 | ENGINEERING AND SURVEYING OF RAILWAY VEHICLES AND OF RAILWAY TRACK INFRASTRUCTURE; RAILWAY SIGNAL COMMISSIONING, NAMELY TESTING FOR CORRECT SIGNAL OPERATION AFTER INSTALLATION BUT PRIOR TO USE, AND RAILWAY SIGNAL DIAGNOSTIC TESTING SERVICES; CONSULTANCY SERVICES IN THE FIELD OF THE DIAGNOSTICS OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY INFRASTRUCTURE DESIGN; CONSULTANCY SERVICES IN THE FIELD OF THE DESIGN OF RAILWAY TRACTION AND ROLLING STOCK; TECHNICAL CONSULTANCY SERVICES IN THE FIELD OF ADVISING TRAIN OPERATORS ON MITIGATING LOW ADHESION AT THE WHEEL-RAIL INTERFACE FOR RAILWAY VEHICLES; CONSULTANCY SERVICES IN THE FIELD OF THE DESIGN OF EQUIPMENT FOR USE AS PART OF RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY EQUIPMENT QUALITY ASSURANCE SERVICES, AND RAILWAY EQUIPMENT SAFETY TESTING; CONSULTANCY SERVICES IN THE FIELD OF DEVELOPMENT OF TRACTION AND ROLLING STOCK FOR RAILWAYS; EXPERT SCIENTIFIC RESEARCH IN THE FIELD OF RAILWAY ACCIDENT INVESTIGATION, INCLUDING THE COLLECTION OF EVIDENCE AND IDENTIFICATION OF CAUSES; DRAWING UP SCIENTIFIC EXPERT TECHNICAL OPINIONS IN THE FIELD OF RAILWAY ACCIDENTS; CONFORMITY ASSESSMENT AND CERTIFICATION OF RAILWAY SUBSYSTEMS AND CONSTITUENTS, NAMELY, THE TESTING, ANALYSIS AND EVALUATION OF RAILWAY SUBSYSTEMS AND CONSTITUENTS OF OTHERS FOR THE PURPOSE OF CERTIFICATION; SCIENTIFIC SERVICES, NAMELY, MATERIALS TESTING; CONSULTANCY SERVICES IN THE DEVELOPMENT OF VOLUNTARY STANDARDS IN THE FIELD OF THE OPERATION, MAINTENANCE AND REPAIR OF RAILWAY INFRASTRUCTURE, PLANT AND RAILWAY TRACTION AND ROLLING STOCK; CONSULTANCY SERVICES IN THE FIELD OF TESTING AND DEVELOPMENT OF RAILWAY INFRASTRUCTURE, NAMELY, BRIDGES, BALLAST, RAILS AND TRACK COMPONENTS; DESIGN AND DEVELOPMENT OF TRACTION AND ROLLING STOCK FOR RAILWAYS; SCIENTIFIC RESEARCH SERVICES TO PROVIDE AERODYNAMICS EXPERTISE RELATING TO THE DESIGN OF ROLLING STOCK FOR RAILWAYS; CONSULTANCY SERVICES AND ADVICE IN THE FIELD OF TESTING THE CONDITION OF RAILWAY VEHICLES TO SEE WHETHER THEY CONTINUE TO COMPLY WITH STANDARDS SET BY RAILWAY AUTHORITIES; DESIGN SERVICES IN THE FIELD OF ELECTRICAL BUILDING SERVICES ASSOCIATED WITH RAILWAYS, AND RELATING TO ELECTRICAL ENGINEERING FOR RAILWAY INFRASTRUCTURE, NAMELY ELECTRIC POWER SUPPLIES; TESTING SERVICES AND CONSULTANCY SERVICES ON THE ELECTROMAGNETIC COMPATIBILITY OF PRODUCTS INTENDED FOR USE IN THE RAILWAY ENVIRONMENT; CONSULTANCY SERVICES IN THE FIELD OF ERGONOMICS AND HUMAN FACTORS, NAMELY DESIGN OF EQUIPMENT AND SYSTEMS TO OPTIMIZE OPERATIONAL SAFETY, EFFICIENCY AND COMFORT IN THE CONTEXT OF RAILWAYS; CONSULTANCY SERVICES IN THE FIELD OF INFORMATION TECHNOLOGY FOR USE IN THE RAILWAY INDUSTRY; DATABASE DEVELOPMENT; SOFTWARE SERVICES, NAMELY THE DESIGN, SPECIFICATION, DEVELOPMENT, TESTING AND IMPLEMENTATION OF SOFTWARE FOR USE IN RAILWAY OPERATIONS, RAILWAY TIME TABLING, RAILWAY MAINTENANCE AND RAILWAY STAFF ROSTERING; CONFORMITY ASSESSMENT AND CERTIFICATION OF RAILWAY SUBSYSTEMS AND CONSTITUENTS, NAMELY EVALUATION AND CERTIFICATION OF THE GOODS OF OTHERS FOR THE PURPOSE OF CERTIFYING CONFORMITY TO STANDARDS SET BY RAILWAY AUTHORITIES; CONSULTANCY SERVICES IN THE FIELD OF MECHANICAL BUILDING ENGINEERING SERVICES, AND IN THE FIELD OF MECHANICAL ENGINEERING RELATING TO OPERATION OF RAILWAY VEHICLES AND RAILWAY INFRASTRUCTURE AND TO RAILWAY EQUIPMENT AND STRUCTURES, AND TO LUBRICATION AND WEAR OF COMPONENTS; DESIGN SERVICES IN THE FIELD OF RAILWAY INFRASTRUCTURE AND RAILWAY EQUIPMENT AND STRUCTURES; CONSULTANCY SERVICES IN THE FIELD OF THE DESIGN, INSPECTION AND TESTING OF PLANT AND EQUIPMENT, NAMELY COMPONENTS, SUBSYSTEMS AND SYSTEMS FOR USE ON RAILWAY VEHICLES AND RAILWAY INFRASTRUCTURE; CONSULTANCY SERVICES IN THE FIELD OF TESTING AND EVALUATION OF RAILWAY CAR PLANTS AND EQUIPMENT FOR USE ON RAILWAYS, AND IN THE FIELD OF FAILURE INVESTIGATION OF PLANT AND EQUIPMENT USED ON RAILWAYS; CONSULTANCY SERVICES FOR SCIENTIFIC PURPOSES IN THE FIELD OF NOISE AND VIBRATION IN THE RAILWAY ENVIRONMENT; CONSULTANCY SERVICES AND DESIGN SERVICES IN THE FIELD OF THE DESIGN OF RAILWAY INFRASTRUCTURE, THE DESIGN OF TRAIN CONTROL SYSTEMS, THE DESIGN OF SIGNALING SYSTEMS AND THE DESIGN OF ELECTRIFICATION OF RAILWAYS; CONSULTANCY SERVICES AND DESIGN SERVICES IN THE FIELD OF THE DESIGN OF RAILWAY INFRASTRUCTURE, NAMELY LEVEL CROSSINGS, STATIONS, BRIDGES, BALLAST, RAILS AND TRACK COMPONENTS; ACCREDITATION SERVICES, NAMELY, INDEPENDENT ASSESSMENT OF CONFORMITY OF RAILWAY SUBSYSTEMS AND CONSTITUENTS TO STANDARDS SET BY RAILWAY AUTHORITIES FOR PURPOSES OF ACCREDITATION; SCIENTIFIC SERVICES RELATING TO ENVIRONMENTAL IMPROVEMENTS, NAMELY TESTING AND MONITORING OF NOISE IN THE VICINITY OF RAILWAYS, AND TESTING AND MONITORING OF ELECTROMAGNETIC RADIATION GENERATED BY RAILWAYS; SCIENTIFIC SERVICES RELATING TO RAILWAY INFRASTRUCTURE, NAMELY TESTING OF TRACK GEOMETRY AND TESTING OF OVERHEAD LINES; SCIENTIFIC SERVICES NAMELY MATERIALS TESTING; SCIENTIFIC TESTING AND RESEARCH SERVICES TO EVALUATE THE CONDITION AND BEHAVIOR OF RAILWAY INFRASTRUCTURE IN THEORETICAL AND ACTUAL SITUATIONS; CONSULTANCY SERVICES IN THE FIELD OF RAILWAY VEHICLES, NAMELY, TESTING, EVALUATION AND ANALYSIS OF THE EFFECTS OF CRASHES AND IMPACTS ON VEHICLES | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by DeltaRail Group Limited
- Other trademarks owned by DeltaRail Group Limited
- Other trademarks owned by DeltaRail Group Limited
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 012
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named DELTARAIL
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 20, 2018 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Sep 13, 2016 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Oct 11, 2011 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 13, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 28, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 28, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 26, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 26, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 20, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 19, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 19, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 17, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 7, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 6, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 6, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 20, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 20, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 20, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 1, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 1, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 1, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 8, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| May 12, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 12, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 12, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 5, 2010 | DMCC | DATA MODIFICATION COMPLETED | — |
| May 5, 2010 | ALIE | ASSIGNED TO LIE | — |
| Apr 15, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 14, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 14, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 14, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 14, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 14, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 17, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 16, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 16, 2009 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Sep 1, 2009 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Aug 10, 2009 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Feb 10, 2009 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Feb 5, 2009 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Aug 4, 2008 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jul 25, 2008 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jul 25, 2008 | ALIE | ASSIGNED TO LIE | — |
| Jan 25, 2008 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jan 25, 2008 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jan 25, 2008 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jan 22, 2008 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 22, 2008 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jan 7, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 5, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 5, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 7, 2007 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 7, 2007 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 7, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 22, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 15, 2007 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Mar 14, 2007 | NWAP | NEW APPLICATION ENTERED | — |