USPTO serial 77165289
CURRENT+
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- PERRY, KIMBERLY B
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with CURRENT+?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
James D. Petruzzi
James D. Petruzzi MASON & PETRUZZI4900 WOODWAY DR STE 745HOUSTON, TX 77056-1835UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Water driven electrical power systems consisting of an individual cell or array of cells with a horizontal or vertical axis turbine, a step up transmission, a generator, a duct, shroud, ejector, eductor, or streamline or turbulence creating device to enhance power production, water driven electrical-hydraulic power systems consisting of an individual cell or array of cells with a horizontal or vertical axis turbine, a step up transmission, an individual or series of interconnected hydraulic pumps, high pressure and low pressure hydraulic lines, a hydraulic filter, a hydraulic accumulator, a hydraulic motor connected to a generator, a generator, a duct, shroud, ejector, eductor, or streamline or turbulence creating device to enhance power production and hydroelectric analogue to co-generation in such that thermal co-generation systems use existing infrastructure of a chemical plant or refinery to efficiently generate electricity from the existing infrastructure | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 23, 2009 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Nov 23, 2009 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Apr 29, 2009 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 29, 2009 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 14, 2009 | EXT2 | SOU EXTENSION 2 FILED | — |
| Apr 14, 2009 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 22, 2008 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 22, 2008 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 22, 2008 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 22, 2008 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 7, 2008 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Nov 8, 2007 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Oct 23, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 3, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 18, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 18, 2007 | ALIE | ASSIGNED TO LIE | — |
| Aug 10, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 10, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 10, 2007 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 10, 2007 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 10, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 8, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| May 1, 2007 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Apr 30, 2007 | NWAP | NEW APPLICATION ENTERED | — |