Drawing for CREATING A BETTER LIFE BY DESIGN

USPTO serial 77220104

CREATING A BETTER LIFE BY DESIGN

Reviewed by CopyMark Law Group

Reg. 3491313Status 710
Filing date
Status date
Registration date
Aug 26, 2008
Examiner
CARLYLE, SHAUNIA P
Law office
TMO LAW OFFICE 110

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with CREATING A BETTER LIFE BY DESIGN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kenneth M. Bush

Kenneth M. Bush Bush Intellectual Property LawPO Box 381146Birmingham, AL 35238UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction planning in the areas of airports, railroads, traffic systems, water drainage systems, water treatment systems, distribution and storage systems, wastewater collection and treatment systems, industrial waste treatment systems, solid waste facilities, decontamination and decommissioning systems, hazardous and toxic waste management systems, brown field reclamation and development, HVAC systems, plumbing and process piping systems, boiler systems, fire protection systems, energy management control systems, material handling systems, power distribution systems, lighting systems, fire alarm systems, communication wiring systems, instrumentation and process control systems, foundations, bridges, retaining structures, seismic designs, and special structures, municipal, commercial, institutional, industrial, educational, and residential buildings, sites and landscapes; Construction phase services, namely, construction oversight, construction progress reviews, and construction progress inspections; and Land developmentSECTION 8 - CANCELLEDJun 1, 2005
042Civil engineering services, namely, design of airports, railroads, traffic systems, and water drainage systems; Environmental engineering services, namely, design of water treatment systems, distribution and storage systems, wastewater collection and treatment systems, industrial waste treatment systems, solid waste facilities, decontamination and decommissioning systems, and hazardous and toxic waste management systems, environmental assessments, and brown field reclamation and development; Mechanical engineering services, namely, design of HVAC systems, plumbing and process piping systems, boiler systems, fire protection systems, energy management control systems, and material handling systems; Electrical engineering services, namely, design of power distribution systems, lighting systems, fire alarm systems, communication wiring systems, and instrumentation and process control systems; Structural engineering services, namely, design of foundations, bridges, retaining structures, seismic designs, and special structures; Geographical information system (GIS) services, namely, design of airport management systems and brown field reclamation; Architectural services, namely, design of municipal, commercial, institutional, industrial, educational, and residential buildings, facilities evaluations, and historic preservation; Survey services, namely, topographic, property line, construction, and GPS surveys, photogrammetric and mapping services, and aerial survey ground control; Urban planning services, namely, planning in the area of land use, zoning comprehensive and neighborhood plans, industrial development and transportation infrastructure; Consulting in the fields of engineering and architecture, namely, construction plan reviews, and physical plant and facilities analyses for assessing building and property condition and usesSECTION 8 - CANCELLEDJun 1, 2005
044Landscape architectural services, namely, landscape gardening design for sites and landscapes, and recreation master plansSECTION 8 - CANCELLEDJun 1, 2005

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 29, 2019CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Aug 26, 2017REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Apr 14, 2015NA15SEC. 15 ACKNOWLEDGEMENT - E-MAILED—
Apr 14, 201515AKREGISTERED - SEC. 15 ACKNOWLEDGED—
Apr 3, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 2, 2015E15RTEAS SECTION 15 RECEIVED—
Apr 23, 2014NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Apr 23, 20148.OKREGISTERED - SEC. 8 (6-YR) ACCEPTEDThe USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline.
Apr 23, 2014APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 9, 20148.AFREGISTERED - SEC. 8 (6-YR) FILED—
Apr 9, 2014ES8RTEAS SECTION 8 RECEIVED—
Apr 9, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 26, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 10, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 21, 2008NPUBNOTICE OF PUBLICATION—
May 8, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 8, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 29, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 29, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 29, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 28, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 28, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 28, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 18, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 4, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Mar 27, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 26, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 10, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 10, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 10, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 24, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 24, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 24, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2007ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Dec 14, 2007PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Nov 30, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 30, 2007ALIEASSIGNED TO LIE—
Oct 26, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 9, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 8, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 8, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 3, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 3, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 3, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 2, 2007DOCKASSIGNED TO EXAMINER—
Jul 5, 2007NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance