Drawing for PFB

USPTO serial 77234082

PFB

Reviewed by CopyMark Law Group

Reg. 3720503Status 800Registered
Filing date
Status date
Registration date
Dec 8, 2009
Examiner
CROSS, TRACY L
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with PFB?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jordan LaVine

Jordan LaVine Flaster Greenberg P.C.Suite 100, 100 Front StreetConshohocken, PA 19428United States

Goods and services

ClassDescriptionStatusFirst use
017Foam insulation for use in building and construction; structural insulated panels for buildings; expanded polystyrene (EPS) insulating building products for commercial, residential and geotechnical applications in the construction industry, namely, EPS insulation for roofs, walls, floors and foundations of buildings, recreational vehicles, trucks, vessels, boats, railway cars, hot tubs, ice rinks, refrigerators, utility lines, and pipes; structural insulated panels for building walls and floors; expanded polystyrene (EPS) in block form for use in foam props, custom signage, and movie or stage sets; packaging material made of expanded polystyrene (EPS), namely, sheets; lightweight fill material, namely, expanded polystyrene (EPS) foam blocks for soil stabilization, landscaping, road embankments and a compressible inclusion against foundation walls; compressible fill material, namely, expanded polystyrene (EPS) foam blocks for reducing potential forces on structures in the event of soil expansion, used under concrete grade beams, under structural floor slabs and against foundation walls, and used to support expected construction live loads and the weight of the structural slabACTIVE—
019Prefabricated non-metal energy-efficient commercial and residential buildings; energy-efficient building envelope systems comprised of foam insulation, structural insulated panels for building walls and roofs, insulating concrete forms used to build foundations and walls, all of the aforementioned sold as a unit; structural timber frames for buildings; building construction material, namely, insulating concrete forms; lightweight fill material, namely, geotextiles for soil stabilization, landscaping, road embankments and a compressible inclusion against foundation walls; compressible fill material, namely, geotextiles for reducing potential forces on structures in the event of soil expansion, used under concrete grade beams, under structural floor slabs and against foundation walls, and used to support expected construction live loads and the weight of the structural slab; non-metal flotation billets used in building floating foundation platforms, docks, marinas and floating homes; expanded polystyrene (EPS) for use in architectural designs, namely, decorative details and mouldingsACTIVE—
037Construction of energy-efficient commercial and residential buildings; providing consulting services in the field of energy-efficient commercial and residential buildings; installation of expanded polystyrene (EPS) insulating building products, structural insulated panels and building panels, insulating concrete forms and timber frames for buildingsACTIVE—
040Custom manufacture of structural insulated panels and building panels, insulating concrete forms and building systems or structures made from combinations of structural insulated panels, building panels and insulating concrete formsACTIVE—
041Educational services, namely, conducting educational workshops and seminars on energy-efficient commercial and residential buildings, expanded polystyrene (EPS) insulating building products, structural insulated panels and building panels, insulating concrete forms, timber frame building construction, and buildings made using the aforementioned componentsACTIVE—
042Architectural design of energy-efficient commercial and residential buildings, and related consultation; design of expanded polystyrene (EPS) insulating building products, structural insulated panels and building panels, insulating concrete forms, and timber frames for buildings for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 8, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 8, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 8, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 30, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 26, 2020NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jan 25, 2020RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jan 25, 202089AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jan 24, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 9, 2019E89RTEAS SECTION 8 & 9 RECEIVED—
Dec 8, 2018REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 5, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 5, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 25, 2018CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 25, 2018COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 23, 2015NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Dec 22, 20158.OKREGISTERED - SEC. 8 (6-YR) ACCEPTEDThe USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline.
Dec 22, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 8, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 30, 2015ES8RTEAS SECTION 8 RECEIVED—
Dec 8, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 29, 2009DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Oct 29, 2009AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Oct 22, 2009IUCNNOTICE OF ALLOWANCE CANCELLED—
Oct 22, 2009D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Oct 8, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 29, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 7, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 17, 2009NPUBNOTICE OF PUBLICATION—
Jun 1, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 31, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 4, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 4, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 16, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 16, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 16, 2009ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Dec 2, 2008GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Dec 2, 2008GNSIINQUIRY TO SUSPENSION E-MAILED—
Dec 2, 2008CNSISUSPENSION INQUIRY WRITTEN—
Nov 29, 2008RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Nov 29, 2008ALIEASSIGNED TO LIE—
Sep 19, 2008ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2008REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 28, 2008GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
May 28, 2008GNSLLETTER OF SUSPENSION E-MAILED—
May 28, 2008CNSLSUSPENSION LETTER WRITTEN—
Apr 30, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 30, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 30, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 14, 2008CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 14, 2008COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Nov 1, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 1, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 1, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 23, 2007DOCKASSIGNED TO EXAMINER—
Jul 25, 2007NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance