Drawing for H HFG ENGINEERING

USPTO serial 77245383

H HFG ENGINEERING

Reviewed by CopyMark Law Group

Reg. 3466090Status 710
Filing date
Status date
Registration date
Jul 15, 2008
Examiner
CROSS, TRACY L
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with H HFG ENGINEERING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jess M. Collen

Jess M. Collen COLLEN IP, Intellectual Property Law, P.C.80 South Highland AvenueThe Holyoke-Manhattan BuildingOssining, NY 10562

Goods and services

ClassDescriptionStatusFirst use
037Building, repair, installation, dismantling and maintenance services of apparatus and installations at offshore locations on and under water, ships and other vessels, dry docks and dry dock facilities, dockyards, wharfs, paneling, dams, piers, bridges, drainage systems, oil and gas producing facilities, floating offshore equipment, pipelines, steel constructions and other civil engineering constructions and industrial installations and machines; constructions of pilings on land and at sea; mining extraction; pumping and extraction of oil, gas and other energy products; well drilling and boring aimed at extracting energy products; rental of machinery and tools for the extraction of oil, gas and other energy products; construction planning and consultation; consultancy in the field of technologies and techniques for mining extraction of raw materials, related consultation and information in the field of all aforementioned servicesSECTION 8 - CANCELLEDApr 30, 2007
042Engineering; architectural design and consultation for construction purposes; design for others, of apparatus and installations for offshore locations on and under water, ships and other vessels, dry docks and dry dock facilities, dockyards, wharfs, paneling, dams, piers, bridges, drainage systems, oil and gas production facilities, floating offshore equipment, pipelines, steel constructions and other civil engineering constructions and industrial installations and machinery; scientific and industrial research in the field of construction, repair, maintenance, transport, storage, research, exploitation and extraction of oil, gas and other energy products; technical research in the field of construction, repair, maintenance, transport, storage, research, exploitation and extraction of oil, gas and other energy products; technical design for others in the offshore industry; technology supervision, research and inspection in the field of geological and oceanographic mining; exploration and research of natural gas and oil wells, bitumen, minerals and other energy products; consultancy in the field of technologies and techniques for exploration of raw materials; technical research and related consultation for companies and participants in the field of construction, repair, maintenance, transport, storage, research, exploitation and extraction of oil, gas and other energy products; design and development of computers and software; related consultation and information services in the field of all aforementioned servicesSECTION 8 - CANCELLEDApr 30, 2007

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 20, 2015C8..CANCELLED SEC. 8 (6-YR)—
Sep 27, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 27, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 12, 2011ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Aug 4, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 15, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 29, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 9, 2008NPUBNOTICE OF PUBLICATION—
Mar 25, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 25, 2008ALIEASSIGNED TO LIE—
Mar 11, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 11, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 11, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 29, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 29, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 29, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 29, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 16, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 7, 2007DOCKASSIGNED TO EXAMINER—
Aug 8, 2007MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Aug 7, 2007NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance