Drawing for WHAT WE BUILD BEST ARE RELATIONSHIPS. WE ARE HARGROVE AND ASSOCIATES.

USPTO serial 77288983

WHAT WE BUILD BEST ARE RELATIONSHIPS. WE ARE HARGROVE AND ASSOCIATES.

Reviewed by CopyMark Law Group

Reg. 3597201Status 800Registered
Filing date
Status date
Registration date
Mar 31, 2009
Examiner
ORTIGA PALMER, RAMONA
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with WHAT WE BUILD BEST ARE RELATIONSHIPS. WE ARE HARGROVE AND ASSOCIATES.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michele Kane

20 South Royal StreetMOBILE, AL 36602UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Procurement, namely, purchasing engineered items in the nature of rotating process equipment, in the nature of pumps, compressors, agitators, vacuum systems, chillers, HVAC equipment, rolling mills, conveyors, tables, specialized metal processing equipment, evaporators, fans, blowers, separators, dryers, powered filters, generators, and turbines, fired equipment, in the nature of boilers, thermal oxidizers, flares and other fired heaters, fabricated equipment, in the nature of tanks, vessels, heat exchangers, columns, column internals, crystallizers, filters, separators, dryers, pots, bins, stacks, instruments, control valves, on and off valves, in the nature of temperature, pressure, level, gauges, and transmitters, flow measurement devices and transmitters, density, conductivity, salinity, and all manner of physical property measurement, analyzers, gas chromatography units, computer control systems, including DCS systems and components, programmable logic controllers, relays, and repeaters, barriers, and all components required for safe process and environmental control, electrical equipment, in the nature of motors, transformers, motor control centers, switchgears, switches, capacitors, photovoltaic cells, generators, and turbines, and bulk construction and landscaping elements in the nature of fill, soil, geofabric, ties, rail, guard rails, sod, seed, erosion control devices, underground piping, culverts, concrete, reinforcing steel, embedded steel, anchor bolts and nuts, epoxies, sealants, paint, coatings, structural steel and fasteners, grating, metal deck, metal siding, metal roofing, insulation, roofing materials of all types, asphalt paving, masonry, precast and prestressed concrete elements, wood framing and fasteners, studs, wood and metal, piping and plumbing, in the nature of valves, plugs, flanges, fittings, blinds, electrical wire and cable, raceway, conduit, cable tray and fittings, and all required fasteners, seals, stands, mounts, and hardware for others in the manufacturing and energy industrial sectors; procurement services, namely, purchasing construction equipment and construction materials for othersACTIVE—
037Construction planning in the manufacturing and energy industrial sectors, namely, planning and laying out of production and factory facilities; construction services, namely, heavy industrial construction of Power Generating Facilities, Pulp and Paper Mills, Steel Mills, Steel Processing Mills, Chemical Production Facilities, Oil and Gas Processing and Transmission Facilities, Pipelines, Refineries, Pharmaceutical Manufacturing Plants, Docks, Wharves, Warehouse Facilities, Wood Chip Processing Facilities, Coal Handling Facilities, Automotive Production Facilities, Foundries, Computer Control System Facilities, Chip Manufacturing Facilities, Appliance Manufacturing Facilities, Textile Manufacturing Facilities, and all other Industrial and Energy Manufacturing Facilities, planning, and construction management in the manufacturing and industrial sectorsACTIVE—
042Engineering and design for others in the fields of chemical engineering and design, mechanical engineering and design, process engineering and design, piping engineering and design, electrical engineering and design, instrumentation engineering and design, control systems engineering and design, civil engineering and design, structural engineering and design, and foundation engineering and design; technical support services and consultation, namely, providing technical advice and troubleshooting in chemical engineering and design, mechanical engineering and design, process engineering and design, piping engineering and design, electrical engineering and design, instrumentation engineering and design, control systems engineering and design, civil engineering and design, structural engineering and design, and foundation engineering and designACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 15, 2019NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Apr 15, 2019RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Apr 15, 201989AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Apr 15, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 14, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 14, 2019E89RTEAS SECTION 8 & 9 RECEIVED—
Mar 31, 2018REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Feb 5, 2015NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Feb 5, 2015C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Feb 5, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 21, 2015E815TEAS SECTION 8 & 15 RECEIVED—
Mar 31, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 13, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 24, 2008NPUBNOTICE OF PUBLICATION—
Dec 5, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 4, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 5, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 4, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 4, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 4, 2008TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 2, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 2, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 2, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 11, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 11, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 11, 2008ALIEASSIGNED TO LIE—
Jun 11, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 10, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 10, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 10, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 30, 2007DOCKASSIGNED TO EXAMINER—
Oct 1, 2007NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance