Drawing for SOLID BLUE

USPTO serial 77328129

SOLID BLUE

Reviewed by CopyMark Law Group

Reg. 3700710Status 710
Filing date
Status date
Registration date
Oct 27, 2009
Examiner
KAUFMAN, LAURIE R
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SOLID BLUE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stewart L. Gitler

Stewart Gitler WELSH FLAXMAN & GITLER LLCSuite 1002000 Duke StreetAlexandria, VA 22314

Goods and services

ClassDescriptionStatusFirst use
001Chemicals used in industry, science and photography; chemicals for agriculture, horticulture and forestry, except fungicides, herbicides, insecticides and parasiticides; Urea, urea granulates, urea solutions and other chemical products in the nature of urea powder and chemical additives for fuel treatment for emission control in chemical processes, as additives to fuels in order to improve the combustion and the exhaust emission characteristics in combustion engines; Urea, urea granulates, urea solutions and other chemical products in the nature of urea powder and chemical additives for dissipation of nitrogen oxide compounds into nitrogen gas and water, available in exhausts of combustion engines; Unprocessed artificial resins; unprocessed plastics; Manures; Fire extinguishing compositions; Metal tempering and soldering chemicals; Chemical products for preserving foodstuffs; Tanning substances, namely, tanning agents for use in the manufacture of leather; Adhesives used in industrySECTION 8 - CANCELLED—
004Fuels; all purpose lubricants; Fuels, lubricants for combustion engines in vehicles by land, air and water; Non-chemical fuel additives; Industrial grease and oil; All purpose lubricants; Dust absorption, dust wetting and dust laying compositions for use on unpaved roads; Motor fuel and lighting fuelSECTION 8 - CANCELLED—
007Motors, other than for land vehicles; Motor parts, namely, motor starters, machine cylinders, machine cylinder heads, machine pumps, camshafts, pistons, fly wheels, bearings, valves, exhausts for engines, injectors for motors of all kind; Electric motors, not for land vehicles; Parts for electric motors, namely, motor starters, machine cylinders, machine cylinder heads, machine pumps, camshafts, pistons, fly wheels, bearings, valves, exhausts for engines, injectors of all kind; Filters for cleaning cooling air for engines; Glow plugs for Diesel engines; Exhaust systems featuring headers, silencers, catalytic exhaust-gas converter, exhaust filter, exhaust muffler, sound absorbers, and exhaust-emission treatment facilities for vehicles; Machine couplings and transmissions, except for land vehicles; Clutches, other than for land vehicles; power-operated jacksSECTION 8 - CANCELLED—
012Motorized land vehicles, namely, automobiles, trucks, vans, sport utility vehicles, lorries, trailers, busses, trains, locomotives, bicycles, tricycles, motorcycles, snowmobiles, camping trailers, folding and hard side truck camping trailers, motor homes, conversion vans, travel trailers, camper coaches and structural parts for all aforesaid goods; Trailers for vehicles and their structural parts; Engines for land vehicles; Tires; wheel rims; complete vehicle wheels and their parts, namely, inner tubesSECTION 8 - CANCELLED—
037Reconstruction in the nature of custom rebuilding, repair, servicing, dismantling, cleaning, maintenance and varnishing of vehicles and their structural parts and of motors and their structural parts, including vehicle repair in the course of vehicle breakdown service; automobile maintenance and repair services, namely, refinement and tuning of automobilesSECTION 8 - CANCELLED—
042Scientific, industrial and technological services and research and design relating thereto, namely, scientific research in the field of motor vehicles emission control of vehicles, fuels, chemicals used in industry, design and testing for new product development; inspection and testing services, namely, emission control of motor vehicles, fuels and chemical fuel additives; Industrial analysis services and industrial research services in the field of motor vehicles, emission control of vehicles, fuels and chemicals used in industry; Industrial analysis services and industrial research services in the field of motor vehicles, motor vehicle engines, parts of motor vehicles, emissions of motor vehicles, emission control of motor vehicles, fuels and chemical fuel additives; Design and development of computer hardware and softwareSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 3, 2016C8..CANCELLED SEC. 8 (6-YR)—
May 23, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 14, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 27, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 11, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 22, 2009NPUBNOTICE OF PUBLICATION—
Jul 9, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 7, 2009ALIEASSIGNED TO LIE—
Jul 1, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 3, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 3, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 3, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 28, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 28, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 28, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 22, 2009ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 6, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 23, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 17, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 16, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 16, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 16, 2009ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Sep 30, 2008GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Sep 30, 2008GNSIINQUIRY TO SUSPENSION E-MAILED—
Sep 30, 2008CNSISUSPENSION INQUIRY WRITTEN—
Sep 27, 2008RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Sep 27, 2008ALIEASSIGNED TO LIE—
Mar 27, 2008GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Mar 27, 2008GNSLLETTER OF SUSPENSION E-MAILED—
Mar 27, 2008CNSLSUSPENSION LETTER WRITTEN—
Feb 26, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 26, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 26, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 20, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 20, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 20, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2007DOCKASSIGNED TO EXAMINER—
Nov 16, 2007NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance