USPTO serial 77330632
PHASE II+
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 6, 2009
- Examiner
- GAST, PAUL
- Law office
- GENERIC WEB UPDATE
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with PHASE II+?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Upper Saddle River, NJ
Carlstadt, NJ
Carlstadt, NJ
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Julianne Abelman
Julianne Abelman Womble Bond Dickinson (US) LLP950 3rd Avenue, Suite 2400New York, NY 10022UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Metalworking machine tools; machine counters for counting machine changes and parts; machine guards to protect operators from injury; machine tool holders; live centers milling/drilling tables; milling machine arbors and adaptors, namely, spindle tools for milling machines that can hold different types of cutting tools; Computer Numerically Controlled (CNC) fixtures and holders, namely, machine accessories that hold cutting tools in place; collet fixtures; indexers, namely, a mechanical device to allow a part to turn 360 degrees, but stop anywhere in between for machining purposes; power tool parts, namely, collets, collet holders, indexing spacers, lathe chucks, lathe toolposts and toolholders, and rotary tables | ACTIVE | May 17, 1983 |
| 008 | Non-power operated tools, namely, 1-2-3 blocks, angle blocks, carbide tipped boring bars, indexable carbide boring bars, boring heads; clamp kits and accessories, namely, clamps and parts of clamps to affix work to metal working machines; non-power operated Computer Numerically Controlled (CNC) stud wrenches; countersinks; High Speed Steel (HSS) and carbide cutoff blades; diamond files; drill chucks; drill chuck arbors; Electrical Discharge Machine toolholders; end mill holders; end mills; hand tappers; sets of parallel workholders; carbide indexable turning tools, namely, boring bars, cutoff tools, threading tools and profiling tools that are used to bore holes and cut off excess material after machining, thread material and profile material; hand-operated v-blocks; vises | ACTIVE | May 17, 1983 |
| 009 | Demagnetizers for demagnetizing ferrous metal objects, depth gauges, angle gauges, radius gauge sets comprised of small metal gauges to check radius, telescoping gauge sets comprised of small gauges to check the diameter of a hole, ultrasonic thickness gauges, coating thickness gauges, surface roughness testers, hardness testers, vibration testers, height gages, force gauges, magnetic bases used to hold dial indicators to check for runout concentricity, micrometers, borescopes, microscopes, protractors, refractometers, mechanical and electric digital durometers; laboratory equipment and supplies, namely, calipers; gauge blocks; runout concentricity indicators; bore gauges | ACTIVE | May 17, 1983 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Phase II Machine & Tool, Inc.
- Other trademarks owned by Phase II Machine & Tool, Inc.
- Other trademarks owned by Phase II Machine & Tool, Inc.
- Other trademarks in Class 007
- Other trademarks in Class 008
- Other trademarks in Class 009
- Similar marks named PHASE II+
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 22, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 22, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 22, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 31, 2020 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Jan 31, 2020 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Jan 31, 2020 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Jan 23, 2020 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Aug 22, 2019 | PR89 | POST REGISTRATION ACTION MAILED - SEC. 8 & 9 | — |
| Aug 22, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 20, 2019 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Oct 6, 2018 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Nov 17, 2015 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Nov 17, 2015 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Nov 17, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 28, 2015 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Oct 6, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 21, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 1, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 16, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 10, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 10, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 10, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 10, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 10, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 8, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| May 31, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| May 21, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 21, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 30, 2008 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Dec 30, 2008 | ALIE | ASSIGNED TO LIE | — |
| Jun 30, 2008 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jun 30, 2008 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jun 30, 2008 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 25, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 25, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 25, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 20, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 20, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 20, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 29, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 20, 2007 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Nov 19, 2007 | NWAP | NEW APPLICATION ENTERED | — |