Drawing for JGC

USPTO serial 77331273

JGC

Reviewed by CopyMark Law Group

Reg. 3735639Status 800Registered
Filing date
Status date
Registration date
Jan 12, 2010
Examiner
COOPER, CHRISTINE H
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with JGC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven D. Lustig

Steven D. Lustig Panitch Schwarze Belisario & Nadel LLP2001 Market StreetTwo Commerce Square, Suite 2800Philadelphia, PA 19103

Goods and services

ClassDescriptionStatusFirst use
037Building construction and repair services; Steel structure construction work; [ Tile laying, brick laying, or block laying; ] Laying and construction of pipelines; Machinery installation; Electrical repairs and installation of electrical systems and appliances; Installation of telecommunication equipment; Repair of telecommunication equipment; Installation of insulating materials; Furnace installation; Construction work of power plants, telecommunication plants, chemical plants, [ food processing plants, ] machinery manufacturing plants, iron and steel manufacturing plants, non-ferrous smelting plants, [ fiber or textile producing plants, ] petrochemical plants, pharmaceutical manufacturing plants and nuclear plants; Installation of environmental health equipment systems; Installation of storage/transportation facilities; Installation of environmental conservation equipment; Installation of mining equipment; Repair or maintenance of power plants; Repair or maintenance of telecommunication plants; Repair or maintenance of chemical plants; [ Repair or maintenance of food processing plants; ] Repair or maintenance of iron and steel manufacturing plants; Repair or maintenance of machinery manufacturing plants; Repair or maintenance of non-ferrous smelting plants; [ Repair or maintenance of fiber or textile producing plants; ] Repair or maintenance of petrochemical plants; Repair or maintenance of pharmaceutical manufacturing plants; Repair or maintenance of nuclear plants; Repair or maintenance of environmental health equipment systems; Repair or maintenance of storage/transportation facilities; Repair or maintenance of environmental conservation equipment; Repair or maintenance of mining equipment; Repair or maintenance of pipelines; Repair or maintenance of pumps; Repair or maintenance of construction equipment and machinery; Repair or maintenance of chemical equipment and machinery; Repair or maintenance of laboratory equipment and apparatus; Repair or maintenance of measuring equipment and apparatus; Repair or maintenance of electronic equipment and apparatus; Repair or maintenance of telecommunication equipment and apparatus; Repair or maintenance of metal working equipment and machinery; Repair or maintenance of medical equipment and apparatus; Construction management relating to buildings; Advice regarding construction work; Consultation and information services regarding construction work; [ Painting services; ] Information on a complete range of building repairs and construction provided via a global computer networkACTIVE—
042Engineering services regarding buildings; Engineering services regarding power plants; Engineering services regarding telecommunication plants; Engineering services regarding chemical plants; [ Engineering services regarding food processing plants; ] Engineering services regarding machinery manufacturing plants; Engineering services regarding iron and steel manufacturing plants; Engineering services regarding non-ferrous smelting plants; [ Engineering services regarding fiber or textile producing plants; ] Engineering services regarding petrochemical plants; Engineering services regarding pharmaceutical manufacturing plants; Engineering services regarding nuclear plants; Engineering services regarding environmental health equipment systems; Engineering services regarding storage/transportation facilities; Engineering services regarding environmental conservation equipment; Engineering services regarding mining equipment; Civil engineering services; Information on civil engineering provided via a global computer network; Architectural design; Consultation and information services regarding architectural design; Power plant design; Consultation and information services regarding power plant design; Telecommunication plant design; Consultation and information services regarding telecommunication plant design; Chemical plant design; Consultation and information services regarding chemical plant design; [ Food processing plant design; Consultation and information services regarding food processing plant design; ] Machinery manufacturing plant design; Consultation and information services regarding machinery manufacturing plant design; Iron and steel manufacturing plant design; Consultation and information services regarding iron and steel manufacturing plant design; Non-ferrous smelting plant design; Consultation and information services regarding non-ferrous smelting plant design; [ Fiber or textile producing plant design; Consultation and information services regarding fiber or textile producing plant design; ] Petrochemical plant design; Consultation and information services regarding petrochemical plant design; Pharmaceutical manufacturing plant design; Consultation and information services regarding pharmaceutical manufacturing plant design; Nuclear plant design; Consultation and information services regarding nuclear plant design; Environmental health equipment system design; Consultation and information services regarding environmental health equipment system design; Storage/transportation facility system design; Consultation and information services regarding storage/transportation facility system design; Environmental conservation equipment design; Consultation and information services regarding environmental conservation equipment design; Mining equipment design; Consultation and information services regarding mining equipment design; Computer program design, composition, or maintenance; Material testing and analyzing in the field of plant constructions; Tests or research on pharmaceuticals [ or food ] items; Tests or research on organic chemicals excluding pharmaceuticals and food; Tests or research on inorganic chemicals excluding pharmaceuticals and food; Tests or research on organic materials excluding pharmaceuticals and food; Tests or research on inorganic materials excluding pharmaceuticals and food; Tests or research on industrial waste treatment; Tests or research on radioactive waste treatment; Tests or research on pollution control; Tests or research on transportation systems; Tests or research on telecommunication systems; Tests or research on storage/transportation systems; Tests or research on robots; Tests or research on the environment including pollution control; Scientific investigations in the area of environmental protection; Tests or research on global warming control technologies; Tests or research on greenhouse gas decomposition and reduction technologies; Environmental assessment services, namely, preparing environmental compliance reports and environmental testing and inspection; Tests or research on energy equipment technologies; Tests or research on energy-saving technologies; Tests or research on petroleum; Tests or research on petrochemistry; Tests or research on coals; Tests or research on gases; Tests or research on wind power; Tests or research on nuclear power; Tests or research on biotechnology; Tests or research on pharmaceutical manufacturing technology; Tests or research on electricity; Tests or research on civil engineering; Tests or research on agriculture; Scientific investigations and research on environmental risks and safety; Scientific investigations, analyses, consultation, and guidance regarding environmental conservation and information services in this connection; Environmental services, namely, technical consultation and information in the field of environmental science, engineering services, design for others in the field of energy-saving technologies, namely, energy engineering, designing and testing of energy products for others; Information services regarding scientific investigations and research on environmental risks and safety; Geological surveying; Advice regarding computer program design, composition, and maintenance; Industrial design services; [ Website design and maintenance for others; Rental of laboratory apparatus and instruments; Rental of measuring apparatus; Rental of computer software computer hardware and computer peripheral devices ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 23, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 23, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jul 23, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 2, 2025EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Apr 2, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 2, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 2, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 2, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 2, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 12, 2020NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Feb 12, 2020RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 12, 202089AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 12, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 8, 2020ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jan 2, 2020E89RTEAS SECTION 8 & 9 RECEIVED—
Jan 12, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Nov 13, 2017CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 13, 2017COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 2, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Feb 2, 2016C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 22, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 11, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 4, 2015E815TEAS SECTION 8 & 15 RECEIVED—
Apr 6, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 12, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 27, 2009NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 27, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 22, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 17, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 17, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Sep 15, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 15, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 15, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 8, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 8, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 2, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 24, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 24, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 24, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 2, 2009RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Mar 23, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 23, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 23, 2009ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 2, 2008GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 2, 2008GNSLLETTER OF SUSPENSION E-MAILED—
Oct 2, 2008CNSLSUSPENSION LETTER WRITTEN—
Sep 9, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 9, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 9, 2008ALIEASSIGNED TO LIE—
Sep 2, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 10, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 10, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 10, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 2, 2008DOCKASSIGNED TO EXAMINER—
Nov 21, 2007MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Nov 20, 2007NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance