Drawing for ARCHANGEL ENGINEERING & CONSTRUCTION

USPTO serial 77366254

ARCHANGEL ENGINEERING & CONSTRUCTION

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
HODGES, KOURTNEE
Law office
TMEG LAW OFFICE 108 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with ARCHANGEL ENGINEERING & CONSTRUCTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Building construction and repair; Building construction services; Building construction supervision; Building inspection; Constructing decks; Constructing porches; Constructing sunrooms; Construction and construction management of tunnels and underground structures; Construction and renovation of buildings; Construction and repair of buildings; Construction and repair of movie and theatrical sets and scenery; Construction consultancy; Construction consultation; Construction grading services; Construction management; Construction of airports; Construction of aquatics facilities; Construction of buildings; Construction of medical establishments; Construction of roads, underground utilities, and housing pads; Construction of telecommunication towers; Construction planning; Construction services, namely, planning, laying out and construction of a planned residential community; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction supervision; Construction, maintenance and renovation of property; Consultation in building construction supervision; Consulting in the field of building construction; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Custom construction and building renovation; Custom construction of homes; Housing services, namely, development of real property, namely, repair, improvement, and new construction; Housing services, namely, repair, improvement, and construction of residential real property; Information concerning rental of equipment for constructions and buildings; Information with relation to aircraft construction, repair and maintenance; Laying and construction of pipelines; Leasing of construction equipment; Marine construction; Pier construction; Pipeline construction and maintenance; Rental of construction and building equipment; Rental of construction equipment; Rental of construction machines and apparatus; Repair or maintenance of construction machines and apparatus; Residential and building construction consulting; Residential and commercial building construction; Road construction; Scaffolding, earthworks or concrete construction; Steel structure construction works; Street construction; Underwater building and construction; Warehouse construction and repairACTIVE—
042Construction drafting; Development of computer programs recorded on data media (software) designed for use in construction and automated manufacturing (cad/cam); Drafting of construction plans for recreation premises; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Research on building construction or city planningACTIVE—
045Safety inspection audits to improve safety of construction workers on residential construction sitesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Nov 13, 2008MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 13, 2008ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 15, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 15, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 15, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2008DOCKASSIGNED TO EXAMINER—
Jan 12, 2008MPMKNOTICE OF PSEUDO MARK MAILED—
Jan 11, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance