Drawing for CANAM

USPTO serial 77372960

CANAM

Reviewed by CopyMark Law Group

Reg. 3645559Status 800Registered
Filing date
Status date
Registration date
Jun 30, 2009
Examiner
SHANAHAN, PATRICK
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with CANAM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey L. Van Hoosear

Jeffrey L. Van Hoosear KNOBBE MARTENS OLSON & BEAR LLP2040 Main Street, 14th FloorIrvine, CA 92614UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Composite steel and concrete floor system used as a forming system for residential, multi-unit residential and non-residential construction consisting primarily of cold rolled and fabricated steel, top chord, steel joists, and reusable roll bars; pre-engineered metal non residential buildings and prefabricated design-build steel frames for non-residential buildings; prefabricated bearing and nonbearing insulated steel frame walls sold as unit; cold-storage metal building system designed and fabricated with insulated load-bearing walls for the agri-food, technological and pharmaceutical markets; prefabricated metal bridges; prefabricated metal bridge decks; metal structural bearings and expansion joints for bridge and highway infrastructure; steel frames for sidewalks; metal fasteners, namely, nuts and bolts; metal anchor bolts fasteners; steel products for construction industry and metal construction components, namely, open-web steel joists, roof trusses, beams, columns, girts, steel decks, metal claddings, edge sheets, cover plates, metal closures, angle closures, purlins and cantrusses, namely, joist girdersACTIVE—
035outsourcing of technical resources in the engineering, industrial and detailing sectorsACTIVE—
037installation, construction and repair of buildings and their components, bridges and bridge decks; construction and maintenance of bridge decks; management of steel construction projectsACTIVE—
040Custom fabrication of metal construction products for the residential and non-residential construction industry; custom fabrication of structural steel products and solutions for the residential and non-residential construction industry; custom steel fabrication; partial custom fabrication and transformation of steel products; custom fabrication of railway components; custom fabrication of rigid frames for pre-engineered and/or design-build steel frame buildings; custom fabrication of welded wide-flanges girders; manufacturing of steel products for others in the construction industry and metal construction components industryACTIVE—
042bridge design for others in the pedestrian, railway and highway markets; product and building design for others in the residential and non residential construction markets; design of structural steel products in the residential and non residential construction markets, civil engineering for the design of projects of structural steel in the residential and non residential construction markets; engineering and quality control for others in the field of metal construction components; design for others and engineering in regard of steel products for construction industry and metal construction components industry; design new metal buildings and their components for others; design for others of energy-efficient buildings for the non residential market, by integrating technical, engineering, operational and management services and equipment; design and development of bridge deck technology for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 21, 2019NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Apr 20, 2019RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Apr 20, 201989AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Apr 20, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 19, 2019E89RTEAS SECTION 8 & 9 RECEIVED—
Jun 30, 2018REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 19, 2017ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jul 12, 2017ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Apr 29, 2015NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Apr 29, 2015C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Apr 29, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 16, 2015E815TEAS SECTION 8 & 15 RECEIVED—
Feb 2, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 15, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 30, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 14, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 25, 2009NPUBNOTICE OF PUBLICATION—
Mar 12, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 11, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 11, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Mar 11, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 11, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 11, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 19, 2009ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Dec 19, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Dec 9, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 8, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 8, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Dec 8, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 8, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 8, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 4, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Nov 4, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 4, 2008ALIEASSIGNED TO LIE—
Oct 22, 2008MAILPAPER RECEIVED—
Apr 22, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 22, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 22, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 15, 2008DOCKASSIGNED TO EXAMINER—
Jan 22, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance