Drawing for TETRA DAMROW

USPTO serial 77377008

TETRA DAMROW

Reviewed by CopyMark Law Group

Reg. 3829988Status 710
Filing date
Status date
Registration date
Aug 10, 2010
Examiner
GARDNER, DAWNA BERYL
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with TETRA DAMROW?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Stainless steel doors, windows and frames; metal floor drain traps; vats of metal for storing cheeseSECTION 8 - CANCELLED
007Cheese making machines, namely, machines for treating cheese curd, recovering cheese and draining cheese curd; draining conveyors and matting conveyors for draining; mechanical block formers and towers for forming and pressing cheese; salting and mellowing conveyors all for milling and salting cheese; electric starter motors for starter vats, tanks and flow converters, all for use in the food and dairy industry; cheese processing apparatus, namely, mechanical bulk cheese former to automatically process and form blocks and/or barrels of cheese from salted, milled or stirred curd; electric cheese grinder and extruder for commercial use for converting blocks and/or barrels of cheeses into cheese etrudate; centrifugal separator for separating whey and fines into separate streams; cheese elevator with cylinder mill and mechanical cheese press all for milling and pressing curd in a cheese mold; mechanical drainer for draining whey from a whey/curd mixture; machines, namely, cheese presses for pressing and cutting semi-hard cheese; cheese making machines, namely, open cheese finishing vats for curd conditioning, whey drainage and curd salting/mellowing of milled cheddar and stirred curd type cheeses; cheese making machines, namely, open cottage cheese vat with cheese agitator and cutter; cheese making machines, namely, enclosed cottage cheese vat with cheese agitator and cutter; cheese making machines, namely, enclosed stirred-curd cheese finishing vats incorporating whey drainer, curd stirrer and salt distributor, angle unloader, and pneumatic conveyor; cheese making machines, namely, enclosed cottage cheese drainer and creamer all incorporating washing water drainer, cream feeder and curd/cream mixer; draining conveyor belt and matting conveyor belt all for drainage of whey from whey/curd mixture, from curd matting, from leveling, from cutting and from curd saltingSECTION 8 - CANCELLED
011Stainless steel cabinets used to control temperature and humidity for proofing food and cheese; shell and tube heat exchangers not being parts of machines for use in the food and dairy industry; cheese processing apparatus, namely, electromagnetic induction cookers for cooking and mixing ground cheese for industrial purposesSECTION 8 - CANCELLED
020Stainless steel kitchen cabinets; vats not of metal for storing cheeseSECTION 8 - CANCELLED
037Installation, repair and maintenance of industrial cheese making equipment, namely, installation, repair and maintenance of stainless steel cabinets for controlling temperature and humidity of foods and mechanical bulk cheese formers and towers for forming blocks of cheese; installation, repair and maintenance of cheese grinders, cheese extruders, mechanical separators for separating whey and fines into separate streams, cheese curd elevators with cylinders mills for pressing and milling curd and mechanical whey drainers; installation, repair and maintenance of mechanical presses for pressing and cutting semi-hard cheese, cheese making machines with open finishing vats for curd conditioning, whey drainage and curd salting; installation, repair and maintenance of cheese making machines with open cottage cheese vat with cheese agitator and cutter; installation, repair and maintenance of cheese making machines with enclosed cottage cheese vat, cheese agitator and cutter; installation, repair and maintenance of cheese making machines with enclosed stirred-curd cheese finishing vats incorporating whey drainer, curd stirrer, salt distributor, angle unloader, and pneumatic conveyor; installation, repair and maintenance of cheese making machines with enclosed cottage cheese drainer and creamer all incorporating washing water drainer, cream feeder and curd/cream mixerSECTION 8 - CANCELLED
040Custom fabrication to the order and specification of others, namely, custom manufacturing of stainless steel cabinets for controlling temperature and humidity of foods and mechanical bulk cheese formers and towers for forming blocks of cheese, cheese grinders, cheese extruders, mechanical separators for separating whey and fines into separate streams, cheese curd elevators with cylinders mills for pressing and milling curd and mechanical whey drainers; Custom fabrication to the order and specification of others, namely, custom manufacturing of mechanical presses for pressing and cutting semi-hard cheese, cheese making machines with open finishing vats for curd conditioning, whey drainage and curd salting; Custom fabrication to the order and specification of others, namely, custom manufacturing of cheese making machines with open cottage cheese vat with cheese agitator and cutter; Custom fabrication to the order and specification of others, namely, custom manufacturing of cheese making machines with enclosed cottage cheese vat, cheese agitator and cutter; Custom fabrication to the order and specification of others, namely, custom manufacturing of cheese making machines with enclosed stirred-curd cheese finishing vats incorporating whey drainer, curd stirrer, salt distributor, angle unloader, and pneumatic conveyor; Custom fabrication to the order and specification of others, namely, custom manufacturing of cheese making machines with enclosed cottage cheese drainer and creamer all incorporating washing water drainer, cream feeder and curd/cream mixerSECTION 8 - CANCELLED
042Custom design and engineering of stainless steel cabinets for controlling temperature and humidity of foods and mechanical bulk cheese formers and towers for forming blocks of cheese, cheese grinders, cheese extruders, mechanical separators for separating whey and fines into separate streams, cheese curd elevators with cylinders mills for pressing and milling curd and mechanical whey drainers; Custom design and engineering of mechanical presses for pressing and cutting semi-hard cheese, cheese making machines with open finishing vats for curd conditioning, whey drainage and curd salting; Custom design and engineering of cheese making machines with open cottage cheese vat with cheese agitator and cutter; Custom design and engineering of cheese making machines with enclosed cottage cheese vat, cheese agitator and cutter; Custom design and engineering of cheese making machines with enclosed stirred-curd cheese finishing vats incorporating whey drainer, curd stirrer, salt distributor, angle unloader, and pneumatic conveyor; Custom design and engineering of cheese making machines with enclosed cottage cheese drainer and creamer all incorporating washing water drainer, cream feeder and curd/cream mixerSECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 7, 2017C8..CANCELLED SEC. 8 (6-YR)
Aug 10, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 25, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 25, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 13, 2010ATRVATTORNEY REVIEW COMPLETED
Apr 15, 2010ATRQATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED
Apr 15, 2010PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED
Apr 15, 2010APETASSIGNED TO PETITION STAFF
Apr 13, 2010TPADTEAS PETITION TO AMEND BASIS RECEIVED
Mar 18, 2010EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Mar 16, 2010EX2GSOU EXTENSION 2 GRANTED
Mar 16, 2010EXT2SOU EXTENSION 2 FILED
Mar 16, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 1, 2009EX1GSOU EXTENSION 1 GRANTED
Oct 1, 2009AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Sep 29, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Sep 17, 2009EXT1SOU EXTENSION 1 FILED
Sep 17, 2009EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 17, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 23, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 3, 2008NPUBNOTICE OF PUBLICATION
Nov 19, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Nov 17, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 17, 2008XAECEXAMINER'S AMENDMENT ENTERED
Nov 17, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Nov 17, 2008GNEAEXAMINERS AMENDMENT E-MAILED
Nov 17, 2008CNEAEXAMINERS AMENDMENT -WRITTEN
Nov 3, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 3, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 29, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 2, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 2, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 2, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 29, 2008DOCKASSIGNED TO EXAMINER
Mar 26, 2008AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Mar 26, 2008ALIEASSIGNED TO LIE
Mar 17, 2008PARITEAS VOLUNTARY AMENDMENT RECEIVED
Jan 25, 2008NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance