USPTO serial 77410963
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
DORTMUND, DE
Dortmund, DE
Dortmund, DE
Dortmund, DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Myers
JONATHAN MYERS LUCAS & MERCANTI, LLP30 Broad Street21st FloorNew York, NY 10004| Class | Description | Status | First use |
|---|---|---|---|
| 007 | PUMPS EXCEPT FOR PUMPS FOR MEDICAL PURPOSES, NAMELY, PUMPS FOR HEATING UNITS, AGRICULTURAL PUMPS, SUBMERSIBLE PUMPS, BOREHOLE PUMPS, HIGH PRESSURE CENTRIFUGAL PUMPS, PUMPS FOR BOOSTING WATER PRESSURE, HEATING INSTALLATION PUMPS, COOLING INSTALLATION PUMPS, PUMPS FOR MACHINES EXCEPT PUMPS FOR MEDICAL PURPOSES, HIGH PRESSURE PUMPS FOR WASHING APPLIANCES, AND INSTALLATIONS; BUILDING INSTALLATION PUMPS, NAMELY, PUMPS FOR HEATING INSTALLATIONS, COOLING INSTALLATIONS, FRESH WATER SUPPLY INSTALLATIONS, WASTEWATER INSTALLATIONS, SEWAGE AND FECES TREATMENT INSTALLATIONS; ELECTRICAL WATER PUMPS EXCEPT FOR PUMPS FOR MEDICAL PURPOSES, NAMELY, WATER SUPPLY PUMPS, SEWAGE TREATMENT PUMPS, PUMPS FOR SWIMMING POOLS, WHIRLPOOLS, BATHS, PONDS, WATER FILTERING UNITS; INDUSTRIAL ELECTRIC MOTORS OTHER THAN FOR LAND VEHICLES, NAMELY, ELECTRIC MOTORS FOR MACHINES AND PUMPS; SPARE PARTS FOR ELECTRIC PUMPS, NAMELY, FILTERS | SECTION 8 - CANCELLED | — |
| 009 | REGULATING AND CONTROLLING APPARATUS, NAMELY, SWITCHING DEVICES FOR THE OPERATION OF ONE OR MORE PUMPS WITH A DRIVE MOTOR, CONTROL UNITS IN THE NATURE OF SWITCH BOXES AND OPERATING UNITS FOR THE ELECTRICAL CONNECTION OF AC AND THREE PHASE PUMPS, FLOW REGULATORS FOR COMMERCIAL AND DOMESTIC USE, ELECTRONIC FLOW AND PRESSURE CONTROLLERS; ELECTRO-TECHNICAL APPARATUS AND INSTRUMENTS, NAMELY, DRY-RUNNING PROTECTION SWITCHES, ELECTRIC PRESSURE SWITCHES, ELECTRIC FLOAT SWITCHES, IMMERSION PROBES FOR CONTROLLING AND MONITORING THE LEVEL OF LIQUID IN A VESSEL, ELECTRIC COILS, ELECTRIC TIME SWITCHES, PRESSURE SENSORS, ELECTRIC CONTROL PANELS, SWITCHGEARS FOR APPLICATION AS CONTACTOR FOR AC AND THREE-PHASE CURRENT PUMPS; REGULATING AND CONTROLLING APPARATUS, NAMELY, OPERATIONAL MONITORING SYSTEMS COMPRISED OF ELECTRONIC CONTROLS FOR PUMPS AND MOTORS, NAMELY, TEMPERATURE, CURRENT, PRESSURE, AND WATER LEVEL SENSORS FOR MONITORING AND INDICATING OPERATING STATUS OF THE PUMP OR MOTOR, AND FOR PROVIDING A WARNING SIGNAL IN CASE OF REACHING A CERTAIN MEASURED VALUE; ELECTRONIC OPERATIONAL MONITORING UNITS FOR CONTROL AND CHECK OF OPERATING STATUS OF ELECTRIC PUMPS; ELECTRICAL CONNECTION PARTS, NAMELY, INSULATED ELECTRICAL CONNECTORS | SECTION 8 - CANCELLED | — |
| 011 | HEATING INSTALLATIONS, NAMELY, HOT WATER HEATING INSTALLATIONS, RADIATORS, ELECTRIC HEATING CABLES, HEATING BOILERS, HEAT PUMPS, HEAT AND STEAM ACCUMULATORS, HEAT EXCHANGERS NOT BEING PARTS OF MACHINES, SOLAR COLLECTORS FOR HEATING INSTALLATIONS, HOT-WATER SPACE HEATING APPARATUS; HEATING APPARATUS, NAMELY, HEAT PUMPS FOR DOMESTIC HOT WATER CIRCULATORS, HEAT PUMPS FOR SECONDARY CIRCULATORS FOR MECHANICAL BUILDING AND INDUSTRIAL SERVICES, SOLAR THERMIC HEAT PUMPS AND PARTS THEREFOR; HOT-WATER HEATERS, NAMELY, CENTRAL HOT WATER HEATERS, HOT WATER CIRCULATING PUMPS FOR HOT WATER CIRCULATORS, SECONDARY AND SERVICE WATER HEATERS AND OPEN CONDENSATION WATER HEATERS, GLANDLESS PUMPS FOR HOT WATER HEATERS OF ALL KINDS, AIR CONDITIONING PLANTS, CLOSED CHILLED WATER CIRCULATORS, INDUSTRIAL CIRCULATORS AND PARTS THEREFOR; HOT WATER APPARATUS, NAMELY, HOT WATER TANKS, HEATING BOILERS, NAMELY, ELECTRICAL BOILERS, FURNACE BOILERS, INDUSTRIAL BOILERS; HEATING ELEMENTS, NAMELY, ELECTRICAL HEATING CABLES; AIR CONDITIONING INSTALLATIONS, NAMELY, GLANDLESS PUMPS; HEAT PUMPS; HEAT ACCUMULATORS; PRESSURE ACCUMULATORS AS PART OF HEATING AND WATER CONDUIT INSTALLATION, NAMELY, HEAT ACCUMULATORS AND STEAM ACCUMULATORS | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 25, 2015 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Apr 25, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 29, 2010 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Apr 27, 2009 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Apr 23, 2009 | PLGL | ASSIGNED TO PARALEGAL | — |
| Mar 27, 2009 | AMD7 | SEC 7 REQUEST FILED | — |
| Mar 27, 2009 | PAPER RECEIVED | — | |
| Feb 24, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 9, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 19, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 4, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 4, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 29, 2008 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Oct 29, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 29, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 20, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Oct 20, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 20, 2008 | ALIE | ASSIGNED TO LIE | — |
| Oct 3, 2008 | PAPER RECEIVED | — | |
| Jun 20, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 20, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 6, 2008 | NWAP | NEW APPLICATION ENTERED | — |