USPTO serial 77414859
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
NGRID INTELLECTUAL PROPERTY LIMITED
LONDON, GB
Other trademarks owned by NGRID INTELLECTUAL PROPERTY LIMITED
NGRID INTELLECTUAL PROPERTY LIMITED
LONDON, GB
Other trademarks owned by NGRID INTELLECTUAL PROPERTY LIMITED
NGRID INTELLECTUAL PROPERTY LIMITED
LONDON WC2N 5EH, GB
Other trademarks owned by NGRID INTELLECTUAL PROPERTY LIMITED
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
BREWSTER TAYLOR
BREWSTER TAYLOR STITES & HARBISON PLLC1800 Diagonal RoadSuite 325Alexandria, VA 22314| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and apparatus for energy technology, electrical engineering building technology, environmental technology, namely, engines and motors for the generation of electricity and stationary engines for co-generation units, namely, AC generators, DC generators, electric generators and electrostatic generators; apparatus and machines for power generation, namely, electric generators, gas turbine driven generators, internal combustion engine driven generators, water power driven generators, geo-thermal electric generators, wind power driven generators and mechanical flywheels; turbines; apparatus for generating electricity from wave power or wind power; devices for input of biomass combustibles for energy generation purposes, namely, internal combustion engines for power generation; blowing machines for the compression, exhaustion and transport of gases; pumps for compressed gas; gas compressors; parts and fittings for all of the aforesaid goods | SECTION 8 - CANCELLED | — |
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric switches, electric transformers, electric accumulators, voltage regulators, and electrical controlling devices; apparatus and instruments for checking and measuring electricity and energy consumption; remote controls for measuring energy and electricity in power stations; electric cables for use in generating or distributing electricity; electric connections for use in generating or distributing electricity; transformers for use in generating or distributing electricity; photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic solar modules, photovoltaic cladding panels, solar cells; scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signaling, checking, supervision, life-saving and teaching apparatus and instruments, namely, conductivity meters, surveying instruments for use in the production and distribution of gases; apparatus and instruments, namely, gas meters, gas sensors for measuring gas concentration, gas testing instruments for use in the production and distribution of gases; parts and fittings for all of the aforesaid goods | SECTION 8 - CANCELLED | — |
| 011 | Machines for generation of gas, namely, electrochemical gas generators, gas generating furnaces for industrial purposes, heat accumulators, gas burners for industrial use, gas regulators; geothermal heat pumps; hydrogen generators; solar electric installations for use in providing power to commercial, residential and industrial premises, namely, solar heat collection panels | SECTION 8 - CANCELLED | — |
| 016 | Printed matter, namely, newspapers, brochures, magazines and books, all in the field of energy; periodical publications in the field of energy; manuals in the field of energy, namely, gas meter manuals, electricity meter manuals and water meter manuals | SECTION 8 - CANCELLED | — |
| 035 | Business management; business consultancy services relating to the energy and power industries; business consultancy services relating to water infrastructure networks; business management for others to ensure that they are meeting energy requirements; market research; marketing studies; public relations; procurement, namely, purchasing electricity and gas for others via the Internet; organization and conducting of promotional campaigns; organization of trade fairs for commercial or advertising purposes; promoting public awareness of the need for energy conservation and providing information in the field of energy efficiency and energy auditing services; business management in the field of power plants; advice, information and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
| 037 | Building construction; construction, maintenance and repair of power stations and power plants; maintenance and repair of energy and power generating apparatus and installations; installation of electrical and electricity generating equipment; installation, maintenance, repair and servicing of gas supply and distribution apparatus and instruments; installation, maintenance and repair of installations, apparatus, instruments and pipelines for utilization of geo-thermal power; advice, information and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
| 039 | Distribution and supply of electricity and other forms of energy or sources of power; distribution, supply, transportation and storage of fuel and gas; transmission, supply and distribution of electricity to and from commercial, residential and industrial premises; advice, information and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
| 040 | Generation of power and electricity; production of gas; waste processing and treatment; industrial toxic waste disposal; chemical treatment of biomass; production of energy from heat from geo-thermal power sources; custom manufacture of energy and power generating apparatus and installations; custom manufacture of installations, apparatus, instruments and pipelines for utilization of geo-thermal power; consultancy services relating to the generation of electricity, gas and water treatment; advice, information and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
| 042 | Scientific and technological services and research and design services in the field of energy; scientific and technological consultancy services relating to energy and power; industrial analysis and research services in the field of energy; design of energy and power systems; analysis relating to energy and power needs of others, namely, data analysis of energy systems; development of energy and power management systems; scientific research relating to the environmental impact of energy and power systems; design services for power plants; research and development services for gas; technical design and technical planning of photovoltaic installations; research in the field of energy usage; computer software consultancy; development of environmentally-friendly forms of energy and power; advice, information and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 23, 2018 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Jul 27, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 19, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 3, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 3, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 24, 2011 | DMCC | DATA MODIFICATION COMPLETED | — |
| Feb 24, 2011 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Feb 11, 2011 | ATRQ | ATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED | — |
| Feb 10, 2011 | 44EG | 44(e) PETITION - GRANTED | — |
| Feb 1, 2011 | APET | ASSIGNED TO PETITION STAFF | — |
| Jan 8, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 6, 2011 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jan 6, 2011 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jan 6, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 6, 2011 | TPDR | TEAS PETITION TO DIRECTOR RECEIVED | — |
| Jun 15, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 11, 2010 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jun 11, 2010 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jun 11, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 7, 2009 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Dec 7, 2009 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 7, 2009 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 7, 2009 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Apr 14, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 25, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 11, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 11, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 11, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 11, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 11, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 11, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 4, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Feb 13, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Feb 2, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 29, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 29, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 29, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 29, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 29, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 29, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jan 16, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jan 4, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 31, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 26, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 26, 2008 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 26, 2008 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 26, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 26, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 26, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 26, 2008 | ALIE | ASSIGNED TO LIE | — |
| Nov 17, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 19, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 19, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 19, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 16, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 12, 2008 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Mar 11, 2008 | NWAP | NEW APPLICATION ENTERED | — |