Drawing for EDP RENOVÁVEIS POWERED BY NATURE

USPTO serial 77447757

EDP RENOVÁVEIS POWERED BY NATURE

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
MICHOS, JOHN E
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with EDP RENOVÁVEIS POWERED BY NATURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Julia Anne Matheson

JULIA ANNE MATHESON FINNEGAN HENDERSON ET AL, LLP901 NEW YORK AVE NWWASHINGTON, DC 20001-4432UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines and machine tools for the generation of electricity; motors and engines for the generation of electricity; generators, namely, electric generators, apparatus and machines for power generation; turbines; windmills; wind-powered electricity generators and machines for converting wave power to electric energy; apparatus for generating electricity and/or heat from geo-thermal power, namely, geo-thermal electricity generators; parts and fittings for the aforesaid goods; decentralized power production stations consisting of electric generators; power conversion apparatus and equipment for alternate and renewable energy applications, namely, wind turbines, hydro turbines, steam turbines, alternators, generators, and rectifiersACTIVE—
009Apparatus, instruments, equipment, accessories, and components for the generation, accumulation, conversion, transformation, transmission, conduction, supply, distribution, control, regulation, and use of electricity, namely, power lines and cables, superconductive and ordinary; electrical ducts; transformers; storage devices for electrical power, namely, batteries, capacitors, accumulators, condensers, electrical cells, battery chargers; circuit breakers and electric circuit closers; circuits and circuit boards; electric resistors; solar batteries; silicon wafers; electric switches; fuses, voltage surge protectors; reactive power compensators; electric coils, superconductive and ordinary; electric converters and inverters; electron tubes; fuel cells; electrical conduits; prefabricated electrical substations, LCD boards and panels for monitoring and controlling energy production; electrical components in the nature of electric contactors, lightning conductors, electrical plugs; electrical sockets; junction boxes; voltage dividers; magnets; electromagnets; conductors and semiconductors made of all types of metal; scales; thermostats; acoustic membranes; relays, namely, remote control electric relays and electric relays; electrical power supplies; power supply connectors and adaptors for use with electronic devices; voltage stabilizing power supply; electrical power connectors; electrical power distribution unit; high frequency switching power supplies; power line conditioners; power controllers; radio transmitters and receivers for remote controls or radio controls; electrical controlling devices; power conversion apparatus and equipment for alternate and renewable energy applications, namely, silicon and non-silicon solar cells; uninterrupted power supply and energy storage systems for industrial, commercial, municipal, military and residential electrical power supply use, namely, voltage converters, voltage regulators, batteries, capacitors, inverters and active filters for electric signal processing; data processors and computers; computer software and hardware for managing energy and power needs; computer software and hardware for monitoring and controlling, locally or remotely, electricity distributing equipment, appliances and devices; electronic energy usage meters and related computer hardware and software for real-time monitoring of customer energy usage, outage detection and providing customers with information regarding energy pricing and energy cost management; downloadable electronic publications, namely, downloadable computer magazines regarding energy production, alternate and renewable energy applications, energy efficiency, home comfort, and home improvement; prerecorded video tapes and DVD's featuring topics relating to energy production, energy efficiency, alternative and renewable energies, home comfort and home improvement; fire extinguishing equipment, namely, fire extinguishers, fire blankets; fire-resistant clothing, namely, protective clothing; equipment for welding, namely, welding torches, helmets and masksACTIVE—
011Energy storage plants; tidal power plants; pumped storage power plants; biogas and biomass power plants; hydroelectric power plants; equipment for water treatment, namely, brackish water installations; hydrogen generators; hydrogen purifiers, hydrogen purification membranes, fuel processors, and steam reformers; water desalination plants; regulating accessories for water supply, namely, metered valves; solar collectors; photovoltaic and solar energy storage plantsACTIVE—
035Business management; consultancy services in the field of energy and power use, conservation, energy efficiency and management; distributorship services in the field of energy; on-line retail store services featuring energy saving goods and devices, namely, household appliances, lighting fixtures, household electronics, light bulbsACTIVE—
037Building construction; repair, installation, and maintenance of building facilities and computer networks for energy generation, conversion, conservation and management; construction planning and consultation in connection with renewable energy systems and electricityACTIVE—
039Transport, distribution, and supply of energy, electricity, and water; public utility services, namely, transmission and distribution of electricity to commercial, residential, industrial, municipal, and military premises; utility services, namely, the transmission and distribution of electricity and wholesale distribution of electricity to other utilities and energy service providers; advice, information, and consultancy services in relation to the aforesaid servicesACTIVE—
040Generation of power, electricity and renewable energy; energy recycling services, namely, the capture and conversion of industrial and urban waste for production of electric power; advice, information and consultancy services in relation to the production of energy and the aforesaid servicesACTIVE—
042Scientific and technological services, namely, scientific research and development related to the generation, production, accumulation, conversion, transformation, transmission, conduction, supply, distribution, control, regulation, and use of electricity and renewable energy; design and development of energy and renewable energy service-related computer hardware and software for others; database development services; database maintenance services; design of energy and power systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Feb 13, 2012MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Feb 13, 2012ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jul 21, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 20, 2011EX4GSOU EXTENSION 4 GRANTED—
Jul 13, 2011EXT4SOU EXTENSION 4 FILED—
Jul 13, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 21, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 20, 2011EX3GSOU EXTENSION 3 GRANTED—
Jan 14, 2011EXT3SOU EXTENSION 3 FILED—
Jan 14, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 20, 2010EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 19, 2010EX2GSOU EXTENSION 2 GRANTED—
Jul 14, 2010EXT2SOU EXTENSION 2 FILED—
Jul 14, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 14, 2010EX1GSOU EXTENSION 1 GRANTED—
Jan 14, 2010EXT1SOU EXTENSION 1 FILED—
Jan 14, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 13, 2010AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Nov 18, 2009MAILPAPER RECEIVED—
Jul 14, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 21, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 1, 2009NPUBNOTICE OF PUBLICATION—
Feb 20, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 10, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 10, 2009ALIEASSIGNED TO LIE—
Jan 30, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 30, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Jan 30, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 30, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 30, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 29, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 28, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 28, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 29, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 29, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 29, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 28, 2008DOCKASSIGNED TO EXAMINER—
Apr 18, 2008MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Apr 17, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance