USPTO serial 77469567
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
NATIONAL GRID ELECTRICITY TRANSMISSION PLC
LONDON WC2N 5EH, GB
Other trademarks owned by NATIONAL GRID ELECTRICITY TRANSMISSION PLC
NATIONAL GRID ELECTRICITY TRANSMISSION PLC
LONDON WC2N 5EH, GB
Other trademarks owned by NATIONAL GRID ELECTRICITY TRANSMISSION PLC
NATIONAL GRID ELECTRICITY TRANSMISSION PLC
LONDON WC2N 5EH, GB
Other trademarks owned by NATIONAL GRID ELECTRICITY TRANSMISSION PLC
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
BREWSTER TAYLOR
BREWSTER TAYLOR STITES & HARBISON PLLC1800 DIAGONAL ROADSUITE325ALEXANDRIA, VA 22314-1445| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and apparatus for energy technology, electrical engineering building technology, environmental technology, namely, engines and motors for the generation of electricity and stationary engines for co-generation units, namely, AC generators, DC generators, electric generators and electrostatic generators; apparatus and machines for power generation, namely, electric generators, gas turbine driven generators, internal combustion engine driven generators, water power driven generators, geo-thermal electric generators, wind power driven generators and mechanical flywheels; turbines; apparatus for generating electricity from wave power or wind power; devices for input of biomass combustibles for energy generation purposes, namely, internal combustion engines for power generation; blowing machines for the compression, exhaustion and transport of gases; pumps for compressed gas; gas compressors; parts and fittings for all of the aforesaid goods | SECTION 8 - CANCELLED | — |
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric switches, electric transformers, electric accumulators, voltage regulators, and electrical controlling devices; apparatus and instruments for checking and measuring electricity and energy consumption; remote controls for measuring energy and electricity in power stations; electric cables for use in generating or distributing electricity; electric connections for use in generating or distributing electricity; transformers for use in generating or distributing electricity; photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic solar modules, photovoltaic cladding panels, solar cells; scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signaling, checking, supervision, life-saving and teaching apparatus and instruments, namely, conductivity meters, surveying instruments for use in the production and distribution of gases in the production and supply of electricity; apparatus and instruments, namely, gas meters, gas sensors for measuring gas concentration, gas testing instruments for use in the production and distribution of gases; parts and fittings for all of the aforesaid goods | SECTION 8 - CANCELLED | — |
| 011 | Machines for generation of gas, namely, electrochemical gas generators, gas generating furnaces for industrial purposes, heat accumulators, gas burners for industrial use, gas regulators; geothermal heat pumps; hydrogen generators; solar electric installations for use in providing power to commercial, residential and industrial premises, namely, solar heat collection panels | SECTION 8 - CANCELLED | — |
| 016 | Printed matter, namely, newspapers, brochures, magazines and books, all in the field of energy; periodical publications in the field of energy; manuals in the field of energy, namely, gas meter manuals, electricity meter manuals and water meter manuals | SECTION 8 - CANCELLED | — |
| 035 | Business management for others to ensure they are meeting energy requirements; market research relating to the generation, production and supply of electricity; marketing studies relating to the generation, production and supply of electricity; public relations in the field of electricity production and supply; procurement, namely, purchasing electricity and gas for others via the Internet; organization and conducting of promotional campaigns in the field of generation, production and supply of electricity; organization of trade fairs for commercial or advertising purposes in the field of generation, production and supply of electricity; promoting public awareness of the need for energy conservation and providing information in the field of energy efficiency and energy auditing services; business management in the field of power plants; advice and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
| 037 | Construction of buildings for use in connection with energy and power generation; maintenance and repair of power stations and other energy and power generating apparatus and installations; installation of electrical and electricity generating equipment; installation, maintenance, repair and servicing of gas supply and distribution apparatus and instruments; installation, maintenance and repair of installations, plants, apparatus, instruments and pipelines for utilization of geo-thermal power; advice and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
| 039 | Distribution and supply of electricity and other forms of energy or sources of power; distribution, supply, transportation and storage of fuel and gas in connection with the distribution and supply of electricity and other forms of energy or sources of power; transmission, supply and distribution of electricity to and from commercial, residential and industrial premises; advice and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
| 040 | GENERATION OF POWER AND ELECTRICITY; PRODUCTION OF GAS; PRODUCTION OF ENERGY FROM HEAT FROM GEO-THERMAL POWER SOURCES; CONSULTANCY SERVICES RELATING TO THE GENERATION OF ELECTRICITY AND GAS; ADVICE AND CONSULTANCY SERVICES RELATING TO ALL OF THE AFORESAID SERVICES | SECTION 8 - CANCELLED | — |
| 041 | Education, teaching and training services for individuals and groups, namely, providing classes, seminars, conferences and workshops in the fields of human resources, engineering, construction, maintenance, manufacturing, workplace health and safety and operations; conducting seminars, workshops, conferences, symposiums in the fields of human resources, engineering, construction, maintenance, workplace health and safety and operations | SECTION 8 - CANCELLED | — |
| 042 | Scientific and technological services and research and design services in the field of energy; scientific and technological consultancy services relating to energy and power; scientific and technological consultancy services relating to water infrastructure networks relating to the field of energy; industrial analysis and research services in the field of energy; design of energy and power systems; data analysis of energy systems relating to energy and power needs of others; development of energy and power management systems; scientific research relating to the environmental impact of energy and power systems; design services for power plants; research and development services for gas; technical design and technical planning of photovoltaic installations; research in the field of energy usage; computer software consultancy in the field of the generation, supply, distribution and transmission of electricity; development of environmentally-friendly forms of energy power; metering of gas and electricity; water meter reading services; measuring of gas, namely, data collection in relation to measuring of gas consumption; advice and consultancy services relating to all of the aforesaid services | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 28, 2019 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Nov 27, 2017 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jun 23, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 27, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 11, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 11, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 22, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 31, 2012 | ATRQ | ATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED | — |
| Jul 31, 2012 | 44EG | 44(e) PETITION - GRANTED | — |
| Jul 31, 2012 | APET | ASSIGNED TO PETITION STAFF | — |
| Jul 13, 2012 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jun 22, 2012 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jun 20, 2012 | FAXX | FAX RECEIVED | — |
| Jun 20, 2012 | TPAD | TEAS PETITION TO AMEND BASIS RECEIVED | — |
| Jun 19, 2012 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 20, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 16, 2011 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Dec 16, 2011 | EXT4 | SOU EXTENSION 4 FILED | — |
| Dec 16, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 24, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 22, 2011 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jun 22, 2011 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jun 22, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 24, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 22, 2010 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Dec 22, 2010 | EXT2 | SOU EXTENSION 2 FILED | — |
| Dec 22, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 22, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 18, 2010 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 18, 2010 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 18, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 22, 2009 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 29, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 9, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Aug 26, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 26, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 26, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 26, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 26, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 26, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 26, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Aug 14, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 31, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 31, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 31, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 31, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 31, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 31, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 22, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 17, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 6, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 6, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 6, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 6, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 6, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 6, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 16, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 15, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 15, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 13, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 13, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 13, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 25, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 25, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 25, 2008 | ALIE | ASSIGNED TO LIE | — |
| Nov 14, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 19, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 19, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 19, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 17, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| May 14, 2008 | MDSM | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| May 13, 2008 | NWAP | NEW APPLICATION ENTERED | — |