USPTO serial 77469621
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
NATIONAL GRID ELECTRICITY TRANSMISSION PLC
LONDON, GB
Other trademarks owned by NATIONAL GRID ELECTRICITY TRANSMISSION PLC
NATIONAL GRID ELECTRICITY TRANSMISSION PLC
LONDON WC2N 5EH, GB
Other trademarks owned by NATIONAL GRID ELECTRICITY TRANSMISSION PLC
NATIONAL GRID ELECTRICITY TRANSMISSION PLC
LONDON WC2N 5EH, GB
Other trademarks owned by NATIONAL GRID ELECTRICITY TRANSMISSION PLC
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeremy D. Spier
Jeremy D. Spier Eversheds Sutherland (US) LLP999 Peachtree Street, NE, Suite 2300Atlanta, GA 30309-3996UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 004 | GAS, FUELS, [ OILS, ] NAMELY, NATURAL GAS, LIQUEFIED NATURAL GAS; [ OILS PRODUCED BY REFINING MINERAL OILS, NAMELY, GASOLINE, DIESEL FUEL, AND ] LIQUEFIED PETROLEUM GAS ALL IN RELATION TO THE GENERATION, SUPPLY, DISTRIBUTION AND TRANSMISSION OF ELECTRICITY | ACTIVE | Jul 26, 2005 |
| 009 | HIGH VOLTAGE TRANSFORMERS; POWER TRANSFORMERS; ELECTRONIC AND SCIENTIFIC APPARATUS AND INSTRUMENTS, NAMELY, ELECTRIC CONDUCTORS, ELECTRIC SWITCHES, ELECTRIC TRANSFORMERS, ELECTRIC ACCUMULATORS, VOLTAGE REGULATORS, ELECTRICAL CONTROLLING DEVICES, ALL FOR TRANSMISSION AND DISTRIBUTION OF ELECTRICITY; COMPUTER PROGRAMS RELATING TO THE GENERATION, SUPPLY, DISTRIBUTION AND TRANSMISSION OF ELECTRICITY, GAS AND WATER FOR USE IN DATABASE MANAGEMENT; COMPUTER SOFTWARE FOR SIMULATION, MODELING AND ANALYSIS OF NETWORKS AND PIPELINES; COMPUTER SOFTWARE FOR USE IN FORECASTING ENERGY CONSUMPTION AND DEMAND; GAS METERS, ELECTRIC METERS; MEASURING AND SIGNALING APPARATUS AND INSTRUMENTS, NAMELY, GAS GAUGES, ELECTRIC GAUGES; [ FUEL DISPENSING, ] METERING AND STORAGE APPARATUS AND INSTRUMENTS AND SYSTEMS, NAMELY, [ METERED FUEL PUMPS FOR SERVICE STATIONS AND ] NATURAL GAS METERS; MONITORING AND SUPERVISION APPARATUS AND INSTRUMENTS, NAMELY, PROBES FOR TESTING INTEGRATED CIRCUITS, AND DIGITAL TRANSMITTERS; MAGNETICALLY ENCODED CREDIT [, CHARGE AND DEBIT ] CARDS; [ BLANK SMART CARDS; ENCODED MAGNETIC CARDS; ] PARTS AND FITTINGS FOR ALL OF THE AFORESAID GOODS | ACTIVE | Jul 26, 2005 |
| 016 | Printed matter, namely, brochures and pamphlets regarding [ the telecommunications, ] gas, electricity [, water and oil ] industries; periodical publications, namely, printed periodicals featuring information about the telecommunications, gas, electricity, [ water and oil ] industries; printed manuals featuring information about the telecommunications, gas, electricity [, water and oil ] industries | ACTIVE | Jul 26, 2005 |
| 035 | [ CREDIT CARD REGISTRATION SERVICES; ] BUSINESS CONSULTANCY SERVICES; INDUSTRIAL CONSULTANCY SERVICES, NAMELY, ADVICE IN THE FIELD OF BUSINESS MANAGEMENT OF UTILITY, ELECTRICITY, GAS [, WATER ] AND CONSTRUCTION INDUSTRIES; MARKETING, NAMELY, BUSINESS MARKETING AND DIRECT MARKETING FOR OTHERS; PROMOTING PUBLIC AWARENESS OF THE NEED FOR ENERGY CONSERVATION AND PROVIDING INFORMATION IN THE FIELD OF ENERGY EFFICIENCY AND ENERGY AUDITING SERVICES; POWER PLANT MANAGEMENT STUDIES, NAMELY, MARKET REPORTS AND RESEARCH STUDIES; BUSINESS MANAGEMENT OF PROJECTS RELATING TO ELECTRICITY, [ OIL, TELECOMMUNICATIONS ] AND GAS, AND CONSULTANCY SERVICES RELATED THERETO; ADVICE AND CONSULTANCY SERVICES RELATING TO ALL OF THE AFORESAID SERVICES | ACTIVE | Jul 26, 2005 |
| 036 | [ BROKERAGE OF ELECTRIC AND GAS COMMODITIES; PROVISION OF LOAN AND CREDIT FACILITIES, NAMELY, CREDIT AND LOAN SERVICES; DIRECT DEBITING, NAMELY, ACCOUNTS PAYABLE DEBITING SERVICES; LEASING OF REAL PROPERTY; FINANCING OF PROJECTS; REAL ESTATE MANAGEMENT; REAL ESTATE PROCUREMENT FOR OTHERS; ADVICE AND CONSULTANCY SERVICES RELATING TO ALL OF THE AFORESAID SERVICES ] | SECTION 8 - CANCELLED | Jul 26, 2005 |
| 037 | INSTALLATION, MAINTENANCE AND REPAIR OF APPARATUS AND INSTRUMENTS, NETWORKS AND SYSTEMS FOR USE IN THE SUPPLY AND DISTRIBUTION OF ELECTRICITY, GAS [, WATER AND TELECOMMUNICATIONS ] ; INSTALLATION, REPAIR, EMERGENCY SERVICING AND MAINTENANCE OF GAS, ELECTRICITY [ AND WATER APPLIANCES, ] APPARATUS AND INSTRUMENTS; LAYING, REPAIR, MAINTENANCE, REPLACEMENT AND REFURBISHMENT OF PIPELINES; PLANNING AND LAYING OUT OF POWER PLANT FACILITIES; INSTALLATION OF INDUSTRIAL DUCTWORK AND PIPING; [ WASTE DISPOSAL FOR OTHERS; ] ADVICE AND CONSULTANCY SERVICES RELATING TO ALL OF THE AFORESAID SERVICES | ACTIVE | Jul 26, 2005 |
| 038 | [ NETWORK PROVIDER SERVICES, NAMELY, PROVIDING ACCESS TO TELECOMMUNICATION NETWORKS, GLOBAL COMPUTER INFORMATION NETWORKS, DIGITAL NETWORKS, WIDE AREA NETWORKS, BROAD BAND NETWORKS, OPTICAL NETWORKS, WIRELESS NETWORKS, SATELLITE NETWORKS, ELECTRONIC COMMUNICATIONS NETWORKS; PROVIDING SHARED WIRELESS AND FIBER COMMUNICATIONS TRANSMISSIONS SITES AND INFRASTRUCTURE FOR USE BY MULTIPLE BROADCASTERS AND TELECOMMUNICATIONS OPERATORS; PROVIDING ACCESS TO A DATABASE PERTAINING TO ENERGY PRODUCTION AND DISTRIBUTION, NAMELY, FUEL SOURCES, STORAGE, DISTRIBUTION, TRANSMISSION AND SUPPLY; ADVICE AND CONSULTANCY SERVICES RELATING TO ALL OF THE AFORESAID SERVICES ] | SECTION 8 - CANCELLED | Jul 26, 2005 |
| 039 | Transmission of gas through pipelines; electricity distribution; storage, distribution and transportation of liquefied petroleum gas; distribution and supply of electricity and other forms of energy or sources of power; distribution, supply, transportation and storage of fuel and gas; transmission, supply and distribution of electricity to and from commercial residential and industrial premises; providing information in the field of transmission and distribution of oil, gas, [ water ] and electricity; advice and consultancy services relating to all of the aforesaid services | ACTIVE | Jul 26, 2005 |
| 040 | GAS TREATMENT SERVICES; POWER GENERATION SERVICES; PRODUCTION OF GAS; CONSULTANCY SERVICES RELATING TO THE GENERATION OF ELECTRICITY, GAS [ AND WATER ] ; ADVICE AND CONSULTANCY SERVICES RELATING TO ALL OF THE AFORESAID SERVICES | ACTIVE | Jul 26, 2005 |
| 042 | ELECTRICITY AND NATURAL GAS SERVICES, NAMELY, METERING; MEASURING GAS CONSUMPTION; SAFETY CHECKING OF DOMESTIC APPLIANCES AND PIPEWORK; SCIENTIFIC RESEARCH, DEVELOPMENT AND ENGINEERING IN THE FIELD OF ENERGY AND THE ENVIRONMENTAL IMPACT OF ENERGY AND POWER SYSTEMS; DEVELOPMENT OF ENVIRONMENTALLY-FRIENDLY FORMS OF ENERGY AND POWER; AERIAL LASER SURVEYS; [ COMPUTER PROGRAMMING SERVICES; MAINTENANCE AND UPDATING OF COMPUTER SOFTWARE; ] DESIGN OF COMPUTER SOFTWARE AND PROGRAMMING; INSPECTION OF PIPELINES; ENGINEERING SERVICES FOR GENERATION, SUPPLY, DISTRIBUTION AND TRANSMISSION OF ELECTRICITY AND GAS; ENGINEERING SERVICES, NAMELY, ENVIRONMENTAL, GEOTECHNICAL, BIOTECHNICAL, STRUCTURAL, CIVIL AND ARCHITECTURAL; ENERGY-RELATED ENGINEERING CONSULTING SERVICES, NAMELY, EVALUATION OF ENERGY REQUIREMENTS AND PROVIDING HEATING AND POWER ENGINEERING DESIGN; ENGINEERING DESIGN; DESIGN OF GAS AND ELECTRICITY TRANSMISSION AND DISTRIBUTION NETWORKS; ADVICE AND CONSULTANCY SERVICES RELATING TO ALL OF THE AFORESAID SERVICES | ACTIVE | Jul 26, 2005 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 6, 2023 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Jan 6, 2023 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Jan 6, 2023 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Jan 6, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 18, 2022 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Feb 14, 2021 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Aug 20, 2018 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Aug 20, 2018 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Aug 20, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 14, 2018 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jun 23, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 14, 2017 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Feb 14, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 11, 2012 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jan 10, 2012 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Jan 5, 2012 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jan 5, 2012 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Dec 20, 2011 | IUAF | USE AMENDMENT FILED | — |
| Dec 20, 2011 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jun 28, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 27, 2011 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jun 26, 2011 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jun 22, 2011 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jun 22, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 24, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 22, 2010 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Dec 22, 2010 | EXT2 | SOU EXTENSION 2 FILED | — |
| Dec 22, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 22, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 18, 2010 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 18, 2010 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 18, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 29, 2009 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 6, 2009 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 6, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 29, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 28, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 28, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 28, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 28, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 28, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 17, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 27, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 15, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 8, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 8, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 8, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 8, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 8, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 15, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 15, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 15, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 13, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 13, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 13, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 25, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 25, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 25, 2008 | ALIE | ASSIGNED TO LIE | — |
| Nov 13, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 24, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 24, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 24, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 17, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| May 14, 2008 | MDSM | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| May 13, 2008 | NWAP | NEW APPLICATION ENTERED | — |