Drawing for CONCRETE MENU

USPTO serial 77471655

CONCRETE MENU

Reviewed by CopyMark Law Group

Reg. 3772383Status 710
Filing date
Status date
Registration date
Apr 6, 2010
Examiner
KING, LINDA M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with CONCRETE MENU?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
019Concrete, concrete beams, concrete blocks, concrete drainage structures, namely, trench drains, concrete drainage structures, namely, storm manholes, concrete floors, concrete panels, concrete patching made of tar base, concrete pipes, concrete retaining walls, concrete vaults, concrete walls, concrete walls for buildings, crash barriers of concrete for roads, drain pipes made of concrete, figures of concrete, figurines of concrete, floor patching materials, namely, concrete sealers, industrial concrete for use in civil engineering works, monuments of concrete, refractory concrete, slabs of concrete, non agricultural lime for use in construction, construction elements not made metal, namely, braces, erosion control fabric, geo textiles for use in connection with construction, non metallic reinforcements for concrete and wood building construction, namely, plates, rods and bars, sealer coatings sold as an integral component of non metal tiles, natural stone and molded, resins for construction purposes, stone for building and construction, asphalt composition paving, paving blocks, epoxy grout, grout, mortar, mortar mix, mortars, cement mortar pipes, aggregate material, brick, building materials, namely, manufactured brick veneer for exterior walls, floors and surfaces, patios, pool sides and driveways, concrete building materials, namely, blocks, bricks, posts, slabs and panels, glass bricks, fired bricks, pavers, paver tiles, portland cement, portland blast furnace slag, ash, cement mixes, hydraulic cement, silica cement, decorative foam core architectural elements that are coated to resemble stone, asphalt based coatings and sealants for use on roofs, walls, pavements, industrial concrete for use in civil engineering works, non-metal building flashing, non-metal casting forms for concrete, paving stones, and asphalt-based mastics for foundations and buildingsSECTION 8 - CANCELLEDJul 23, 2009
037Masonry services, grout recoloring, brick paving services, application of epoxy coatings to floors, concrete polishing, scaffolding, earthworks or concrete construction, building construction and repair, building construction services, building construction supervision, building inspection, construction renovation of buildings, construction management (supervision), construction grading services, construction consultancy, construction consultation, construction and repair of building, water well drilling, crane rental and leasing for construction purposes, building demolition, rental of hand and power tools, excavation services, construction services, namely, planning, laying out and custom construction of residential and commercial communities, consulting services for the construction of water treatment and purification plants solid waste treatment plants and other municipal infrastructure projects, housing services, namely, repair, improvement, and construction of residential real property, housing services, namely, development of real property, namely, repair, improvement, and new construction, brick paving services, paving contractor services, road paving, foundation contractor services, charitable services, namely, providing building materials to rebuild home and business, building, sealing and caulking services, soil erosion control services, cleaning of building exterior surfaces, cleaning of external surfaces of buildings, and rental of hand and power toolsSECTION 8 - CANCELLEDJul 23, 2009

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 11, 2016C8..CANCELLED SEC. 8 (6-YR)—
Apr 6, 2015REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 6, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 31, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 1, 2010REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Feb 26, 2010CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jan 29, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 29, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 27, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 9, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 9, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 9, 2009CNRTSU - NON-FINAL ACTION - WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 15, 2009SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Sep 15, 2009AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Aug 19, 2009MAILPAPER RECEIVED—
Aug 17, 2009IUAFUSE AMENDMENT FILED—
Feb 17, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 25, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 5, 2008NPUBNOTICE OF PUBLICATION—
Oct 22, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 22, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 22, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Oct 22, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 22, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 22, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 20, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 22, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Sep 9, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 9, 2008ALIEASSIGNED TO LIE—
Aug 29, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 29, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Aug 29, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 29, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 29, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 27, 2008DOCKASSIGNED TO EXAMINER—
May 15, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance