USPTO serial 77538035
ACHIEVE MORE TOGETHER
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Apr 26, 2011
- Examiner
- PINO, BRIAN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with ACHIEVE MORE TOGETHER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Otkritoye Aktsionernoye Obshchestvo "Severstal"
Mira, RU
Other trademarks owned by Otkritoye Aktsionernoye Obshchestvo "Severstal"
Otkritoye Aktsionernoye Obshchestvo "Severstal"
Mira, RU
Other trademarks owned by Otkritoye Aktsionernoye Obshchestvo "Severstal"
Otkritoye Aktsionernoye Obshchestvo "Severstal"
Mira, RU
Other trademarks owned by Otkritoye Aktsionernoye Obshchestvo "Severstal"
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John Zaccaria
JOHN ZACCARIA Notaro, Michalos & Zaccaria P.C.100 Dutch Hill RoadOrangeburg, NY 10962UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | (Based on Section 44(e)) Fissionable material for nuclear energy; foundry binding substances, namely, ferroniobium; chemical preparations for the manufacture of paints; chemical additives for oils; rare earths; lime chloride; alum; ammonia alum; aluminum alum; chrome alum; carbonic acid; copper sulphate; methane; methyl benzene; naphthalene; uranium oxide; lead oxide; chromium oxide; cobalt oxide for industrial purposes; foundry sand; plutonium; metal annealing preparations; galvanizing preparations; chemical preparations for facilitating the alloying of metals; ammonium salts; salts of precious metals for industrial purposes; iron salts; gold salts; salts from rare earth metals; salts of alkaline metals; fuel for atomic piles; uranium; slag in the nature of by-product used in the cement factory; alkalies; caustic alkali; radioactive elements for scientific purposes | SECTION 8 - CANCELLED | — |
| 004 | (Based on Section 44(e)) Anthracite; benzene fuel; combustible briquettes; fuel gas; producer gas in the nature of blast furnace gas; carburants, namely, fuels; coke; industrial oil; coal tar oil; coal naphtha; coal dust; lignite; charcoal; coal; coal briquettes | SECTION 8 - CANCELLED | — |
| 006 | (Based on Section 44(e)) Aluminium; anchors; fittings of metal for compressed air ducts; fittings of metal for building, namely, reinforcement rods, reinforcement coils; girders of metal; joists of metal; metal bottles for compressed gas or liquid air; ingots of common metal; bolts of metal; eye bolts; screws of metal; tungsten; nuts of metal; galena; nails; metal tacks; vice claws of metal; iron, unwrought or semi-wrought; tinplate; bungs of metal; metal bolts, flat; window fasteners of metal; crampons of metal; binding screws of metal for cables; metal wheel clamps; rivets of metal; locks of metal, other than electric; locks of metal for bags; machine belt fasteners of metal; metal door bolts; bottle closures of metal; closures of metal for containers; metal bolts; wall plugs of metal; metal tension links; ropes of metal; metal telpher cables; greenhouse frames of metal; framework of metal for building; metal keys; knobs of metal; cobalt, raw; elbows of metal for pipes; bed casters of metal; furniture casters of metal; manifolds of metal for pipelines; tent pegs of metal; rings of common metal for keys; ferrules of metal; ferrules of metal for handles; hardware, namely, stop collars of metal; portable buildings of metal; casings of metal for oilwells; brackets of metal for building; metal turntables for railtracks; manhole covers of metal; pitons of metal; metal hooks; pot hooks of metal; metal hooks for slate; hooks of metal for clothes rails; clothes hooks of metal; chicken-houses, of metal; steel sheets; cast steel; magnesium; manganese; reinforcing materials, of metal, for concrete, namely, wire BP-1, wire BP-2, wire for reinforcing iron concrete cross tie, strands, bar mat, string, reinforcement rods, reinforcement coils; reinforcing materials of metal for building, namely, wire BP-1, wire BP-2, strands, bar mat, string, reinforcement rods, reinforcement coils; materials of metal for funicular railway permanent ways, namely, ropes of metal; railway material of metal, namely, rail fittings, namely, pintles, nuts, rail fast clips, gaskets, bolt screws, railtrack; refractory construction materials of metal; steel masts; copper, unwrought or semi-wrought; sheets and plates of metal; common metals, unwrought or semi-wrought; molybdenum; pipe muffs of metal; roof flashing of metal; metal fish plates; flashing of metal, for building; anvils; anvils; beak-irons; ferrules of metal for walking sticks; rope thimbles of metal; handcuffs; nickel; grease nipples; binding thread of metal for agricultural purposes; construction elements, namely, braces of metal for handling loads; barrel hoops of metal; fences of metal; tree protectors of metal; crash barriers of metal for roads; latticework of metal; tin; props of metal, namely, metal supports; branching pipes of metal; lintels of metal; strap-hinges of metal; metal shims; platforms, prefabricated, of metal; transport pallets of metal; tiles of metal for building; iron slabs; lead seals; firedogs; roof coverings of metal; metal door openers, non-electric; valves of metal, other than parts of machines; collars of metal for fastening pipes; floating docks of metal for mooring boats; iron wire; aluminium wire; wire for aerials; soldering wire of metal; wire of common metal; wire of common metal alloys, except fuse wire; barbed wire; copper wire, not insulated; steel wire; hardware, namely, washers of metal; metal hardware, namely, springs; rods of metal for welding; rods of metal for brazing; rods of metal for brazing and welding; frames of metal for building; rails of metal for railways; belts of metal for handling loads; gratings of metal; pulleys of metal, other than for machines; runners of metal for sliding doors; metal sash pulleys; iron ores, namely, iron-ore concentrate, fluxed iron-ore pellets, non-fluxed iron-ore pellets; ores of metal, namely, iron ore pellet fines; chrome ores; lead, unwrought or semi-wrought; buckles of common metal; metal door scrapers; cable joints of metal, non-electric; junctions of metal for pipes; silver plated tin alloy; alloys of common metal; nickel-silver; sheaf binders of metal; window shutters of metal; outdoor blinds of metal; steel alloys; hoop iron; hoop steel; steel, unwrought or semi-wrought; pegs of metal; bars for metal railings; telegraph posts of metal; slings of metal for handling loads; tantalum; titanium; wire cloth; boarding stairs of metal, mobile, for passengers; cables of metal, non-electric; wire rope; pipework of metal; pipes of metal; steel pipes; angle irons; tinplate packings for guard rail, wire rod, hot rolled bars, bright bars; door stops of metal; sash fasteners of metal for windows; tungsten iron; molybdenum iron; silicon iron; ferrotitanium; chrome iron; flanges of metal; weather vanes of metal; aluminium foil; foundry molds of metal; chromium; chains of metal; zinc; cast iron, unwrought or semi-wrought; balls of steel; hinges of metal; poles of metal; metal ice nails; belt stretchers of metal; railroad ties of metal; metal window casement bolts; cotter pins; spurs; exterior roller blinds of steel; metal furnace fire screens; metal lock bolts; metals, namely, vanadium, celtium, germanium, cadmium, niobium, zirconium; (Based on Use in Commerce) coated and uncoated flat rolled carbon steel coils | SECTION 8 - CANCELLED | Dec 23, 2010 |
| 014 | (Based on Section 44(e)) Diamonds; gold, unwrought or beaten; iridium; precious stones; semi-precious stones; precious metals, unwrought or semi-wrought; platinum; silver, unwrought or beaten; ingots of precious metals; alloys of precious metal | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Otkritoye Aktsionernoye Obshchestvo "Severstal"
- Other trademarks owned by Otkritoye Aktsionernoye Obshchestvo "Severstal"
- Other trademarks owned by Otkritoye Aktsionernoye Obshchestvo "Severstal"
- Other trademarks in Class 001
- Other trademarks in Class 004
- Other trademarks in Class 006
- Other trademarks in Class 014
- Similar marks named ACHIEVE MORE TOGETHER
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 1, 2017 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Apr 26, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 23, 2011 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Mar 22, 2011 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Mar 22, 2011 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Mar 18, 2011 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Mar 18, 2011 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 3, 2011 | IUAF | USE AMENDMENT FILED | — |
| Mar 3, 2011 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Mar 3, 2011 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 11, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 9, 2010 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Dec 9, 2010 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 9, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 6, 2010 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 11, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 11, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 2, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 1, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 24, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 11, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Mar 1, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Feb 12, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 9, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 9, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 9, 2010 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 9, 2010 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 9, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 5, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jan 29, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jan 21, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 21, 2010 | ALIE | ASSIGNED TO LIE | — |
| Dec 30, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 24, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 24, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 24, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 17, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 17, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 17, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 27, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 27, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 27, 2009 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Sep 3, 2009 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Sep 3, 2009 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Sep 3, 2009 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Aug 13, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 13, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 13, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 7, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 7, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 7, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 17, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 17, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 21, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 21, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 21, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 13, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 7, 2008 | NWAP | NEW APPLICATION ENTERED | — |