Drawing for APD ENGINEERING AND ARCHITECTURE

USPTO serial 77541197

APD ENGINEERING AND ARCHITECTURE

Reviewed by CopyMark Law Group

Reg. 3825730Status 800Registered
Filing date
Status date
Registration date
Jul 27, 2010
Examiner
THOMAS, JANICE
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with APD ENGINEERING AND ARCHITECTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Neal L. Slifkin

Neal L. Slifkin, Esq. Harris Beach PLLC99 Garnsey RoadPittsford, NY 14564UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Value engineering, namely, cost analysisACTIVEMar 18, 2008
042Architectural and engineering services; Civil engineering; Civil engineering for the planning, design, management, approvals, construction support, operation support, repair design and planning and maintenance plans of roads, streets, highways, parking areas, pavement, snow and ice management, geothermal, traffic control, signage, striping, grading, drainage, storm detention, retention, infiltration, wetlands, environmental mitigation, landscaping, utilities, sanitary collection, distribution, sanitary treatment and disposal, water, wells, water treatment, water storage, water distribution, retaining walls, slope stabilization, ground cover, pedestrian walkways, lighting, buildings and site layout, sustainability, erosion control, water quality, dams, building and structure design; engineering relating to water irrigation; Computer-aided engineering services for others; Conducting engineering surveys; Consulting in the fields of engineering and architecture; Custom design and engineering of telephony systems, cable television systems and fiber optics; Drawing up of plans and engineering drawings; Engineering; Engineering and hydrological design of restoration of stream channels, marshes, estuaries, and wetlands; Engineering services for building and property condition assessment, facility management, repair and restoration, building instrumentation and monitoring, and environmental consulting; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Engineering services in the field of reduction of operating costs, waste handling; Engineering services, namely, engineering for the planning, design, management, approvals, construction support, operation support, repair design and planning and maintenance plans for roads, streets, highways, parking areas, pavement, snow and ice management, geothermal, traffic control, signage, striping, grading, drainage, storm detention, retention, infiltration, wetlands, environmental mitigation, landscaping, utilities, sanitary collection, distribution, sanitary treatment and disposal, water, wells, water treatment, water storage, water distribution, retaining walls, slope stabilization, ground cover, pedestrian walkways, lighting, buildings and site layout, sustainability, erosion control, water quality, dams, building and structure design; Environmental services, namely, technical consultation in the field of environmental science, engineering services, design for others in the field of environmental engineering, designing and testing of new environmentally friendly products for others; Hydraulic engineering and design; Hydrologic and engineering modeling and design of measures to protect areas likely to be inundated by storm-water and flood-waters; Technology consultation and research in the field of Building, traffic, geotechnical, environmental, site/development, highway, traffic, transportation, and survey; Technology consultation and research in the fields of Building engineering, highway engineering, traffic engineering, transportation engineering, geotechnical engineering, communications systems engineering, water treatment engineering, environmental engineering, civil engineering, and site/development, and surveying; Testing or research on civil engineeringACTIVEMar 18, 2008

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 12, 2020NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Feb 12, 2020RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 12, 202089AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 12, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 2, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 2, 2020E89RTEAS SECTION 8 & 9 RECEIVED—
Jul 27, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 6, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 6, 2016C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 6, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 3, 2016E815TEAS SECTION 8 & 15 RECEIVED—
Jul 27, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 23, 2010SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jun 22, 2010REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Jun 22, 2010ALIEASSIGNED TO LIE—
Jun 8, 2010CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jun 4, 2010SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jun 3, 2010AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 17, 2010IUAFUSE AMENDMENT FILED—
May 17, 2010EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Nov 17, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 25, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 5, 2009NPUBNOTICE OF PUBLICATION—
Jul 21, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 15, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 14, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 14, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 14, 2009ALIEASSIGNED TO LIE—
Jun 30, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 7, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 7, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 7, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 10, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 9, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 9, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 19, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 19, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 19, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 17, 2008DOCKASSIGNED TO EXAMINER—
Aug 11, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance