USPTO serial 77541197
APD ENGINEERING AND ARCHITECTURE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 27, 2010
- Examiner
- THOMAS, JANICE
- Law office
- GENERIC WEB UPDATE
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with APD ENGINEERING AND ARCHITECTURE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
APD Engineering & Architecture, PLLC
Victor, NY
Other trademarks owned by APD Engineering & Architecture, PLLC
APD Engineering & Architecture, PLLC
Victor, NY
Other trademarks owned by APD Engineering & Architecture, PLLC
APD Engineering & Architecture, PLLC
Victor, NY
Other trademarks owned by APD Engineering & Architecture, PLLC
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Neal L. Slifkin
Neal L. Slifkin, Esq. Harris Beach PLLC99 Garnsey RoadPittsford, NY 14564UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Value engineering, namely, cost analysis | ACTIVE | Mar 18, 2008 |
| 042 | Architectural and engineering services; Civil engineering; Civil engineering for the planning, design, management, approvals, construction support, operation support, repair design and planning and maintenance plans of roads, streets, highways, parking areas, pavement, snow and ice management, geothermal, traffic control, signage, striping, grading, drainage, storm detention, retention, infiltration, wetlands, environmental mitigation, landscaping, utilities, sanitary collection, distribution, sanitary treatment and disposal, water, wells, water treatment, water storage, water distribution, retaining walls, slope stabilization, ground cover, pedestrian walkways, lighting, buildings and site layout, sustainability, erosion control, water quality, dams, building and structure design; engineering relating to water irrigation; Computer-aided engineering services for others; Conducting engineering surveys; Consulting in the fields of engineering and architecture; Custom design and engineering of telephony systems, cable television systems and fiber optics; Drawing up of plans and engineering drawings; Engineering; Engineering and hydrological design of restoration of stream channels, marshes, estuaries, and wetlands; Engineering services for building and property condition assessment, facility management, repair and restoration, building instrumentation and monitoring, and environmental consulting; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Engineering services in the field of reduction of operating costs, waste handling; Engineering services, namely, engineering for the planning, design, management, approvals, construction support, operation support, repair design and planning and maintenance plans for roads, streets, highways, parking areas, pavement, snow and ice management, geothermal, traffic control, signage, striping, grading, drainage, storm detention, retention, infiltration, wetlands, environmental mitigation, landscaping, utilities, sanitary collection, distribution, sanitary treatment and disposal, water, wells, water treatment, water storage, water distribution, retaining walls, slope stabilization, ground cover, pedestrian walkways, lighting, buildings and site layout, sustainability, erosion control, water quality, dams, building and structure design; Environmental services, namely, technical consultation in the field of environmental science, engineering services, design for others in the field of environmental engineering, designing and testing of new environmentally friendly products for others; Hydraulic engineering and design; Hydrologic and engineering modeling and design of measures to protect areas likely to be inundated by storm-water and flood-waters; Technology consultation and research in the field of Building, traffic, geotechnical, environmental, site/development, highway, traffic, transportation, and survey; Technology consultation and research in the fields of Building engineering, highway engineering, traffic engineering, transportation engineering, geotechnical engineering, communications systems engineering, water treatment engineering, environmental engineering, civil engineering, and site/development, and surveying; Testing or research on civil engineering | ACTIVE | Mar 18, 2008 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by APD Engineering & Architecture, PLLC
- Other trademarks owned by APD Engineering & Architecture, PLLC
- Other trademarks owned by APD Engineering & Architecture, PLLC
- Other trademarks in Class 035
- Other trademarks in Class 042
- Similar marks named APD ENGINEERING AND ARCHITECTURE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 12, 2020 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Feb 12, 2020 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Feb 12, 2020 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Feb 12, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 2, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 2, 2020 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jul 27, 2019 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Oct 6, 2016 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Oct 6, 2016 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 6, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 3, 2016 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 27, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 23, 2010 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jun 22, 2010 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Jun 22, 2010 | ALIE | ASSIGNED TO LIE | — |
| Jun 8, 2010 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 4, 2010 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 3, 2010 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| May 17, 2010 | IUAF | USE AMENDMENT FILED | — |
| May 17, 2010 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Nov 17, 2009 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 25, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 5, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 21, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 15, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 14, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 14, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 14, 2009 | ALIE | ASSIGNED TO LIE | — |
| Jun 30, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 7, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 7, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 7, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 9, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 9, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 19, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 19, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 19, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 17, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 11, 2008 | NWAP | NEW APPLICATION ENTERED | — |