Drawing for BRADKEN

USPTO serial 77550779

BRADKEN

Reviewed by CopyMark Law Group

Reg. 3720755Status 710
Filing date
Status date
Registration date
Dec 8, 2009
Examiner
HERMAN, RUSS
Law office
TMEG LAW OFFICE 101

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with BRADKEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ronald E. Shapiro

Ronald E. Shapiro Shapiro and Silverstein PLLC1300 Pennsylvania Avenue NW Suite 700Washington, DC 20004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Castings and forgings made of ferrous based metal for use in the manufacture of mining, quarrying, excavation and agricultural machines, namely, excavator buckets, gearboxes, bearing housings, structural support frames and transmissions; castings and forgings made of ferrous based metals for use in the manufacture of mining, mineral processing, grinding, crushing, power generation, cement and quarrying machines, namely, grinding mills for grinding rock and stone, crushing machines for crushing rock and stone, machine pump fans, pump impellors, slurry bilge pumps, and component parts therefor; castings and forgings made of ferrous based metals for use in the manufacture of machine parts for nuclear power generation machines, namely, electric pumps, pump control valves, machine compressors and hydraulic turbines; castings and forgings made of ferrous based metals for use in the manufacture of shoveling, dragging, drilling and mining machines, namely, crawler tracks and crawler shoes, and replaceable parts therefor; casting and forgings made of ferrous based metals for use in the manufacture of railway car parts, namely, structural support frames and undercarriages, bogies, side frames, couplings, bearing housings and suspension systemsSECTION 8 - CANCELLED—
007Fabrications made of ferrous based metals for use in mining, quarrying, excavation and agricultural machines, namely, excavator buckets, gearboxes, bearing housings, structural support frames and transmissions; fabrications made of ferrous based metals for use in mining, mineral processing, grinding, crushing, power generation, cement and quarrying machines, namely, grinding mills for grinding rock and stone, crushing machines for use with rock and stone; machine pump fans, pump impellors, slurry bilge pumps, and component parts therefor; fabrications made of ferrous based metals for use in nuclear power generation machines, namely, electric pumps, pump control valves, machine compressors and hydraulic turbines; fabrications made of ferrous based metals for use in shovel, dragline, drilling and mining machines, namely, crawler tracks and crawler shoes and replaceable parts therefor; wear resistant machine components made of ferrous based metals for use in mining, quarrying, power generation, sugar processing, smelting, steel making, and cement manufacturing and processing machinery, namely, steel plates and steel blocksSECTION 8 - CANCELLED—
012Fabrications made of ferrous based metals for use in railway cars, namely, structural support frames and undercarriages, bogies, side frames, couplings, bearing housings and suspension systemsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 23, 2021NCS8NOTICE OF CANCELLATION SEC. 8 EMAILED—
Dec 22, 2021C8.TCANCELLED SEC. 8 (10-YR)—
Jun 9, 2021PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Jan 29, 2021EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jul 29, 2020PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Jul 21, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 8, 2020E89RTEAS SECTION 8 & 9 RECEIVED—
Dec 8, 2018REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Mar 17, 2015NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Mar 17, 2015C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Mar 17, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 2, 2015E815TEAS SECTION 8 & 15 RECEIVED—
Dec 8, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 30, 2009DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Oct 29, 2009AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Oct 6, 2009IUCNNOTICE OF ALLOWANCE CANCELLED—
Oct 6, 2009FAXXFAX RECEIVED—
Aug 11, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 19, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 29, 2009NPUBNOTICE OF PUBLICATION—
Apr 15, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 15, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 15, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 15, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 14, 2009ALIEASSIGNED TO LIE—
Apr 13, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 1, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 1, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 1, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 26, 2008DOCKASSIGNED TO EXAMINER—
Aug 22, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance