USPTO serial 77563489
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Yokohama-shi, Kanagawa, JP
Yokohama-shi, JP
Yokohama-shi, JP
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michelle E. Tochtrop
Michelle E. Tochtrop PEARNE & GORDON LLP1801 EAST 9TH STREET, SUITE 1200CLEVELAND, OH 44114-3108UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | [ Construction for earth work; ] Construction services; [ Plumbing services; Installation of power supply systems, safety instrumented systems and analyzer systems; Construction of tanks; Welding work; ] Construction consultancy; Construction of chemical plants; Construction of petrochemical plants; Construction of petroleum plants; Construction of gas plants; Construction of utility facilities plants; Construction of environmental protection facilities; Construction of storage and transportation facilities; Construction of electric power plants; Construction of telecommunication plants; Construction of iron and steel manufacturing plants; Construction of machinery manufacturing plants; Construction of processing and assembly plants; Construction of food plants; Construction of pharmaceutical manufacturing plants; Construction of automobile plants; Maintenance of energy facilities; Repair or maintenance of chemical plants; Maintenance of petrochemical plants; Maintenance of petroleum plants; Maintenance of gas plants; Maintenance of utility facilities plants; Maintenance of environmental protection facilities; Maintenance of storage and transportation facilities; Repair or maintenance of storage tanks; Maintenance of machinery manufacturing plants; Maintenance of processing and assembly plants; Maintenance of food plants; Maintenance of pharmaceutical manufacturing plants; Maintenance of automobile plants; Repair or maintenance of nuclear electric power plants; [ Repair or maintenance of machine elements; Repair or maintenance of air-conditioning apparatus; Repair or maintenance of burners; Repair or maintenance of boilers; Repair or maintenance of industrial furnaces; Repair or maintenance of pumps; Repair or maintenance of freezing machines and apparatus; Repair or maintenance of sewage treatment facilities; Repair or maintenance of water pollution control equipment; Repair or maintenance of water purifying; Repair or maintenance of gasoline station equipment; Repair or maintenance of construction machines and apparatus; Rental of construction machines and apparatus; Repair or maintenance of electronic machines and apparatus; Repair or maintenance of apparatus for collecting information; Repair or maintenance of electronic monitoring apparatus; Repair or maintenance of continuous measuring apparatus for environmental pollution gas; Repair or maintenance of laboratory apparatus and instruments; Repair or maintenance of waste compacting machines and apparatus; Repair or maintenance of waste crushing machines and apparatus; Repair or maintenance of telecommunication machines and apparatus; Repair or maintenance of electric power distribution or control machines and apparatus; Repair or maintenance of electric power generators; Repair or maintenance of electric motors; Repair or maintenance of measuring and testing machines and instruments; Repair or maintenance of medical machines and apparatus; Repair or maintenance of chemical processing machines and apparatus; Repair or maintenance of machines and apparatus for pulp-making, papermaking or paper-working; Repair or maintenance of plastic processing machines and apparatus; Repair or maintenance of packing or wrapping machines and apparatus; Repair or maintenance of rubber-goods manufacturing machines and apparatus; Repair or maintenance of machines and apparatus for processing foods or beverages; Repair or maintenance glassware manufacturing machines and apparatus; Repair or maintenance of metalworking machines and tools; Repair or maintenance of mining machines and apparatus; Repair or maintenance of textile machines and apparatus; Repair or maintenance of painting machines and apparatus; Shipbuilding; Repair or maintenance of vessels; Repair or maintenance of aircrafts; Providing information relating to general building construction works via computer networks; Providing information relating to electrical works via computer networks; Providing information relating to telecommunication wiring via computer networks; Providing information relating to repair or maintenance of electronic machines and apparatus via computer networks; Providing information relating to repair or maintenance of general civil engineering works via computer networks; Providing information relating to repair or maintenance of consumer electric appliances via computer networks; Providing technical information about civil engineering design and construction design ] | ACTIVE | — |
| 042 | Engineering service; Engineering on chemical plants; Engineering on petrochemical plants; Engineering on petroleum plants; Engineering on gas plants; Engineering on facilities and systems for environmental and sanitation; Engineering on facilities and systems for storage and transportation; Engineering on electric power plants; Engineering on telecommunication plants; Engineering on iron and steel manufacturing plants; Engineering on machinery manufacturing plants; Engineering on food plants; Planning, designing, engineering or consulting on pharmaceutical manufacturing plants; Designing of chemical plants; Designing of petrochemical plants; Designing of petroleum plants; Designing of gas plants; Designing of utility facilities plants; Designing of facilities and systems for environmental protection; Designing of facilities and systems for storage and transportation; Designing of electric power plants; Designing of telecommunication plants; Designing of iron and steel manufacturing plants; Designing of machinery manufacturing plants; Designing of processing and assembly plants; Designing of food plants; Designing of automobile plants; Designing of architectures; Providing information relating to designing of architectures; Research and development of chemical and fine chemical technology; Research and development of technology for energy facilities; Research and development of technology for coal, nuclear or alternative energy; Research and development of technology for utility facilities; Research and development of technology for environmental protection; Research and development of technology for prevention of pollution; Research and development of technology for storage and transportation facilities; Research and development of processing and assembly technology; Research and development of machinery manufacturing technology; Research and development of information processing technology; Research and development of technology for new materials and functional materials; Research and development of food technology; Research and development of pharmaceutical manufacturing technology; Research and development of biotechnology; Environmental assessment; [ Providing information relating to chemistry; Providing information relating to research of the prevention of pollution, disasters and accidents; Providing information relating to testing or research of prevention of pollution; Providing technical information relating to sciences such as biology, physics, chemistry, and medical science; Providing technical information relating to engineering such as electrical engineering and electronic engineering; Providing information relating to research of building construction or city planning; Providing technical information relating to optical apparatus and instruments; Providing information relating to testing or research of prevention of pollution via internet; Providing information relating to testing, inspection or research of pharmaceuticals, cosmetics or foodstuff via internet; Providing information relating to testing, inspection or research of pharmaceuticals, cosmetics or foodstuff; Providing information relating to research of medical treatment and pharmaceuticals; Providing information relating to testing or research of machines, apparatus and instruments; Testing or research on chemistry; Testing or research on prevention of pollution; Testing or research on civil engineering; Research on building construction or city planning; Testing or research on machines, apparatus and instruments; Testing or research on electricity; Testing, inspection or research of pharmaceuticals, cosmetics or foodstuff; ] Computer software design, computer programming, and maintenance of computer software via communications networks; Design, programming, and maintenance of computer network systems; [ Providing temporary use of non-downloadable computer communication software for management of electronic payment systems, and information processing using such computer communication software; Maintenance of computer communication software for management of electronic payment systems; ] Other computer software design, computer programming, or maintenance of computer software; [ Providing information relating to computer programming or design of network system by using communications via computers; Providing information relating to computer software design, computer programming, or maintenance of computer software; ] Consultancy relating to design, programming, configuration, installation, functional enhancement, expansion, or maintenance of computer software; Consultancy relating to design, programming, configuration, operation, functional enhancement, expansion, or mainetnance of computer network systems; [ Analysis, testing, research, and report of water supply and sewage processing, and provision of information relating thereto; Providing information relating to architectural design for installation of gas equipment and appliances; Providing information relating to prospecting and analysis of oil and natural gas; Technological advice relating to performance, operation of machines including computers and automobiles that require high levels of personal knowledge, skill or experience of the operators to meet the required accuracy in operating them; Consultancy relating to usage and operation of electrical equipment based on investigation and analysis of electric power consumption data collected via the computer communications networks; Consultancy relating to usage and operation of electrical equipment based on investigation and analysis of electric power consumption data collected via the computer communications networks for calculating CO2 reduction and equivalent crude oil reduction; ] [ Providing non-downloadable computer software used for calculation, analysis, or display of electric power consumption, CO2 reduction, and equivalent crude oil reduction; ] [ Providing computer programs (non-downloadable) for use with process design in the field of oil, petrochemical, alternative energy, and renewable energy;] [ Surveying; Geological surveys or research; Providing information relating to geologic surveys or research; ] Testing quality of plants' performance, testing of plants' safety systems | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 15, 2021 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Nov 15, 2021 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Nov 15, 2021 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Nov 15, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 28, 2021 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jul 12, 2020 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Apr 16, 2020 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Apr 15, 2020 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Sep 26, 2019 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Sep 12, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 12, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 28, 2019 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Mar 21, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 14, 2019 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Sep 14, 2018 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Aug 20, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 17, 2018 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Feb 17, 2018 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Jan 17, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 9, 2018 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 12, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 26, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 26, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 23, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 22, 2011 | ALIE | ASSIGNED TO LIE | — |
| Mar 21, 2011 | ALIE | ASSIGNED TO LIE | — |
| Jan 27, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 27, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 26, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 26, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 29, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 29, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 29, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 19, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 2, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jun 18, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 18, 2010 | ALIE | ASSIGNED TO LIE | — |
| Jun 3, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 3, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 3, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 3, 2010 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Dec 18, 2009 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Dec 18, 2009 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Dec 18, 2009 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jun 18, 2009 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jun 18, 2009 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jun 18, 2009 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jun 18, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 18, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 18, 2009 | ALIE | ASSIGNED TO LIE | — |
| Jun 12, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 16, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 16, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 16, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 10, 2008 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Sep 9, 2008 | NWAP | NEW APPLICATION ENTERED | — |