Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
POOLE, DORSET, GB
David Brown Engineering Limited
Huddersfield, GB
DAVID BROWN HYDRAULIC SYSTEMS LIMITED
WEST YORKSHIRE, GB
Other trademarks owned by DAVID BROWN HYDRAULIC SYSTEMS LIMITED
DAVID BROWN HYDRAULIC SYSTEMS LIMITED
WEST YORKSHIRE, GB
Other trademarks owned by DAVID BROWN HYDRAULIC SYSTEMS LIMITED
DAVID BROWN HYDRAULIC SYSTEMS LIMITED
WEST YORKSHIRE, GB
Other trademarks owned by DAVID BROWN HYDRAULIC SYSTEMS LIMITED
DAVID BROWN HYDRAULIC SYSTEMS LIMITED
WEST YORKSHIRE, GB
Other trademarks owned by DAVID BROWN HYDRAULIC SYSTEMS LIMITED
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Christopher J. Schulte
CHRISTOPHER J. SCHULTE MERCHANT & GOULD P.C.PO BOX 2910MINNEAPOLIS, MN 55402-0910UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Hydraulic pumps and valves therefor; hydraulic power-transmission gear for machines; hydraulic control valves as machine components; hydraulic control valve spools as machine components; lubrication and hydraulic pumps of aluminum; lubrication and hydraulic pumps of cast iron; hydraulic gear pumps; piston pumps; hydraulic control installations for controlling machines consisting primarily of hydraulic pumps, gears, pistons, vane pumps, accumulators, pilot valves, main control valves, supporting relief valves, over centre valves, filters, pipes and hoses; hydraulic control systems and apparatus for machines; hydraulic control systems and apparatus for engines; hydraulic engines and motors; hydraulic lifting apparatus; hydraulically operated control apparatus, namely, hydraulic remote control valves, being parts of machines, having analog and/or digital controls; hydraulically operated control apparatus, namely, hydraulic circuits for machines consisting of hydraulic pilot control valves; hydraulically driven winches for use on drilling rigs; cranes; loading cranes, moveable, portal, moving and overhead cranes; power take offs, namely, drive shafts used to power machines; compressed air pumps; Power operated tailboard lifts, namely, column lifts and cantilever lifts; Load carrying apparatus, namely, cranes and earth moving machines and power-operated scissor lifts composed primarily of a platform and jack; hydraulic clutch control units for machines; hydraulic couplings for machines; Camshafts for vehicle engines; rotary hydraulic motors for marine and aerospace vehicles; parts and fittings for all the aforesaid goods | SECTION 8 - CANCELLED | — |
| 012 | Hydraulic control systems and apparatus for land vehicles consisting primarily of hydraulic pumps, gears, pistons, vane pumps, accumulators, pilot valves, main control valves, supporting relief valves, over centre valves, filters, pipes and hoses; Concrete mixing trucks; Power take offs, namely, land vehicle drive shafts; Load carrying apparatus, namely, trucks for carrying containers, forklift trucks, rough-terrain forklift trucks, trucks for hauling materials; hydraulic connectors being parts of land vehicles; hydraulic couplings being parts of land vehicles, hydraulic brake pressure regulators being parts of brake systems for land vehicles, hydraulic power transmission units for land vehicles, hydraulic rotary dampers being parts of land vehicles, hydraulic rotary shock absorbers being parts of land vehicles, hydraulic servo valves being parts of vehicle braking systems and vehicle hydraulic systems; hydraulic transmissions for land vehicles; rotary hydraulic motors for land vehicles; brakes and brake systems for vehicles; clutches and clutch components, namely, air cylinders, engagement pinions and levers for land vehicles; crawler dump trucks; dump trucks; electric trucks; trucks; tractors; land vehicles incorporating lifting apparatus; road trailers; vehicle seats; motors and engines for land vehicles; drive shafts for land vehicles; drive units for land vehicles, namely, engines and gear transmissions for land vehicles; gears for vehicles; gear boxes for land vehicles; gear couplings for land vehicles; gear changing mechanisms, namely, gear shifts; gear motors for land vehicles; drive gear units for vehicles; directional signals for vehicles; warning signals for vehicles; shock absorbers for land vehicles; suspension apparatus for vehicles; hydraulic power transmission for land vehicles; hydraulic suspension control systems and apparatus being structural parts of land vehicles, consisting primarily of hydraulic pumps, gears, pistons, vane pumps, accumulators, pilot valves, main control valves, supporting relief valves, over centre valves, filters, pipes and hoses; parts and fittings for all the aforesaid goods | SECTION 8 - CANCELLED | — |
| 037 | Maintenance, installation, reconditioning and repair of machinery and parts of machinery, advisory services relating to excavating, mining, pipe laying, drilling, construction, building; vehicle maintenance, and vehicle repair; rental of cranes; rental of earthmoving machines; hydraulic construction services, construction and repair information services; installation of machines; installation of offshore apparatus; installation of pipelines; installation of power plants; maintenance and repair of construction machines, industrial apparatus, lifts, land vehicles and machine parts for industrial machines; servicing of commercial vehicles; servicing of cranes; servicing of machines, namely, municipal equipment in the nature of mowers, road sweepers, sewage trucks, refuge trucks, fire fighting trucks; servicing of machines, namely, mobile on and off road equipment and construction machines in the nature of pavers, compactors, cranes, crawler loaders and tractors, hydraulic excavators, tractor loader back hose, graders, haulers, rough-terrain fork lifts, scrapers, skid steer loaders, wheel loaders, screening machines and fork lifts; servicing of machines, namely, industrial equipment in the nature of platform scissors; servicing of machines, namely, transport vehicles in the nature of trucks, cement mixers, tipper truckers, refrigerator and freezer trucks; servicing of machines, namely, agricultural equipment in the nature of grass cutting equipment, farm equipment and forestry machines; servicing of machines, namely, marine cranes and material handling equipment in the nature of onshore cranes, offshore cranes, fishing net handling equipment, oil and gas processing and service vessels, container handling equipment | SECTION 8 - CANCELLED | — |
| 042 | Technical advisory services relating to hydraulic machines and apparatus; custom design of hydraulic machines and apparatus; advisory services relating to vehicle manufacture; construction engineering consultancy services; construction engineering; civil engineering | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 27, 2017 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Sep 10, 2014 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Mar 22, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 16, 2011 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Feb 9, 2011 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 8, 2011 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Feb 8, 2011 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Nov 23, 2010 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 28, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 8, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Aug 24, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 20, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 20, 2010 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Aug 20, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 20, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 30, 2010 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 29, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 16, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 9, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Mar 26, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 26, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 16, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 12, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 12, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 7, 2009 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 30, 2009 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Aug 14, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 13, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 12, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 31, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 22, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 22, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 1, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 30, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 30, 2009 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| May 29, 2009 | CNSL | LETTER OF SUSPENSION MAILED | — |
| May 28, 2009 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 7, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 7, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 7, 2009 | ALIE | ASSIGNED TO LIE | — |
| May 6, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 12, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 30, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 17, 2008 | TAEA | TEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED | — |
| Sep 17, 2008 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |