Drawing for BABCOCK WANSON

USPTO serial 77593874

BABCOCK WANSON

Reviewed by CopyMark Law Group

Reg. 4125772Status 800Registered
Filing date
Status date
Registration date
Apr 10, 2012
Examiner
CASE,LEIGH CAROLINE
Law office
TMEG LAW OFFICE 105

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with BABCOCK WANSON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven A. Abreu

Steven A. Abreu Abreu Karol LLC770 Legacy Place, 2nd FloorDedham, MA 02026United States

Goods and services

ClassDescriptionStatusFirst use
006(Based on 44(e)) [ Common metals and their alloys; metal building materials, namely, steel; transportable metal buildings; materials for railway tracks made of metal; non electric cables and wires of common metal; ] hardware made of metal, namely, boiler incinerator casings; metal tubes and pipes [ ; metal safes; steel in the form of coils ]ACTIVE—
007(Based on 44(e)) [ Motors and engines, except for land vehicles; ] non electric machine transmission couplings and transmission components, except for land vehicles; [ incubators for eggs; ] feeding apparatus for engine boilers, namely, pumps as part of a machine; anti-pollution devices for motors and engines; electric pumps for heating installations; hydraulic controls for machines, engines and motors; aerator machines, namely, de-aerators for feedwater; feedwater regulators being parts of machines; heat exchangers being parts of machines and component parts thereof; electric pumps; pumps for heating installations; steam enginesACTIVE—
011(Based on 44(e)) Apparatus for heating, steam generating, and drying purposes, namely, gaseous effluent incinerator burners; heating installations, namely, burners; heat accumulators; steam accumulators; water softening apparatus and installations; heating installations, namely, hot air apparatus, air reheaters, air driers, feeding apparatus for heating boilers, flues for heating boilers, chimney flues, heat regenerators and heating boilers; heating installations, namely, heating apparatus for solid, liquid and gaseous fuels; regulating and safety accessories for gas pipes, namely, metered valves; regulating and safety accessories for water apparatus, namely, metered valves; water filtering apparatus; water softening apparatus and installations; water purifying apparatus; water heaters; pressure water hot water tanks; heat exchangers, not being parts of machines; flue gas economizers and fuel economizers; gas burners; gas boilers; heating installations, namely, steam boilers, other than parts of a machine; incinerators; water heaters; regulating accessories for water or gas apparatus and pipes, namely, metered valves; steam generating heating installations; air cooling apparatus; evaporator; heat pump; heating system, namely, heating installations; heating installations, namely, a radiant tube; super steam heaters; pipes for heating boilers; expansion tanks, namely, hot water tanksACTIVE—
035[ (Based on 44(e)) business consultancy services ]SECTION 8 - CANCELLED—
037(Based on Use in Commerce) (Based on 44(e)) Installation, repair and maintenance of complete industrial boilers and burners, industrial heating apparatus, incinerators and component parts thereof; installation, repair and maintenance of a complete process heating system and component parts thereof; installation, repair, and maintenance of flue gas treatment devices; cleaning and repair of boilers, industrial heating apparatus, burners, and incinerators; installation, maintenance and repair of heating equipment; rebuilding of machinery that has been worn or partially destroyed; installation, repair and maintenance of component parts and devices for gas and water treatmentsACTIVEJan 1, 2012
040(Based on Use in Commerce) (Based on 44(e)) water treatment, namely, clarification, filtering, decarbonization, and demineralization by resins; waste treatment, namely, transformation, recycling and incineration of all waste and trash; air purification; air deodorizing; odor neutralization services; assembly and disassembly of industrial boilers; rental of industrial boilersACTIVEJan 1, 2012
041(Based on Use in Commerce) (Based on 44(e)) Providing training services for others in the fields of flue gas, industrial heating, industrial water, the treatment of odor, waste incineration and trash incineration, and in the field of waste transformation and trash transformationACTIVEJan 1, 2012
042[ (Based on 44(e)) Technical monitoring scientific research services for others in the fields of components and complete industrial boilers, off gas treatments, industrial water treatments, waste and trash incineration, burners, incinerators, components and complete process heating systems, flue gas treatment devices, odor treatment devices and in the field of rendering devices; providing technical scientific research advice in the nature of technical monitoring scientific research services and scientific research consulting; preparation of technical expert scientific research reports, conducting engineering surveys, preparing technical scientific research project studies, providing engineering services, scientific research services and technology scientific research services and scientific research analysis services all in the fields of flue gas, industrial heating, industrial water, the treatment of odor, waste incineration or trash incineration, in the field of waste transformation and trash transformation ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 19, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 19, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 19, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 17, 2023NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Apr 17, 2023RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Apr 17, 20239G8PREGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8—
Apr 17, 20238PRTREGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED—
Apr 17, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 4, 2022E89RTEAS SECTION 8 & 9 RECEIVED—
Aug 30, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 30, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 30, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 30, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 30, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 10, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Feb 10, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 23, 2018NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 23, 2018C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 17, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 4, 2018E815TEAS SECTION 8 & 15 RECEIVED—
Sep 27, 2017ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Apr 12, 2017ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Apr 10, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 5, 2017ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jul 8, 2016CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jul 8, 2016COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 6, 2016ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
May 24, 2016CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
May 24, 2016COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 10, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 9, 2012SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Mar 8, 2012REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Feb 29, 2012ALIEASSIGNED TO LIE—
Feb 28, 2012CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Feb 11, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 10, 2012SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Feb 10, 2012EX3GSOU EXTENSION 3 GRANTED—
Feb 8, 2012IUAFUSE AMENDMENT FILED—
Feb 8, 2012EXT3SOU EXTENSION 3 FILED—
Feb 8, 2012EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 8, 2012EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Feb 6, 2012CORVREVIEW OF CORRESPONDENCE COMPLETE—
Jan 27, 2012D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Dec 8, 2011DOCKASSIGNED TO EXAMINER—
Aug 17, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 16, 2011EX2GSOU EXTENSION 2 GRANTED—
Aug 16, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Aug 3, 2011EXT2SOU EXTENSION 2 FILED—
Aug 3, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 10, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 8, 2011EX1GSOU EXTENSION 1 GRANTED—
Feb 8, 2011EXT1SOU EXTENSION 1 FILED—
Feb 8, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 12, 2010DOCKASSIGNED TO EXAMINER—
Aug 10, 2010NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 15, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 15, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 8, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 7, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 7, 2010XAECEXAMINER'S AMENDMENT ENTERED—
May 7, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 7, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
May 7, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
May 7, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 9, 2010PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Mar 29, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 29, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 29, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Mar 29, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 29, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 29, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 29, 2010ZZAXPREVIOUS ALLOWANCE WITHDRAWN-TIMELY AAU—
Mar 5, 2010PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 23, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 23, 2010ALIEASSIGNED TO LIE—
Jan 27, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 26, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 25, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 25, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 24, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 26, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 21, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 21, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 29, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 29, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 21, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 21, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 21, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 16, 2009DOCKASSIGNED TO EXAMINER—
Oct 20, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance