USPTO serial 77593874
BABCOCK WANSON
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Apr 10, 2012
- Examiner
- CASE,LEIGH CAROLINE
- Law office
- TMEG LAW OFFICE 105
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with BABCOCK WANSON?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
CHEVILLY-LARUE, FR
NERAC, FR
NERAC, FR
NERAC, FR
La Courneuve, FR
Paris, FR
La Courneuve, FR
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Steven A. Abreu
Steven A. Abreu Abreu Karol LLC770 Legacy Place, 2nd FloorDedham, MA 02026United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | (Based on 44(e)) [ Common metals and their alloys; metal building materials, namely, steel; transportable metal buildings; materials for railway tracks made of metal; non electric cables and wires of common metal; ] hardware made of metal, namely, boiler incinerator casings; metal tubes and pipes [ ; metal safes; steel in the form of coils ] | ACTIVE | — |
| 007 | (Based on 44(e)) [ Motors and engines, except for land vehicles; ] non electric machine transmission couplings and transmission components, except for land vehicles; [ incubators for eggs; ] feeding apparatus for engine boilers, namely, pumps as part of a machine; anti-pollution devices for motors and engines; electric pumps for heating installations; hydraulic controls for machines, engines and motors; aerator machines, namely, de-aerators for feedwater; feedwater regulators being parts of machines; heat exchangers being parts of machines and component parts thereof; electric pumps; pumps for heating installations; steam engines | ACTIVE | — |
| 011 | (Based on 44(e)) Apparatus for heating, steam generating, and drying purposes, namely, gaseous effluent incinerator burners; heating installations, namely, burners; heat accumulators; steam accumulators; water softening apparatus and installations; heating installations, namely, hot air apparatus, air reheaters, air driers, feeding apparatus for heating boilers, flues for heating boilers, chimney flues, heat regenerators and heating boilers; heating installations, namely, heating apparatus for solid, liquid and gaseous fuels; regulating and safety accessories for gas pipes, namely, metered valves; regulating and safety accessories for water apparatus, namely, metered valves; water filtering apparatus; water softening apparatus and installations; water purifying apparatus; water heaters; pressure water hot water tanks; heat exchangers, not being parts of machines; flue gas economizers and fuel economizers; gas burners; gas boilers; heating installations, namely, steam boilers, other than parts of a machine; incinerators; water heaters; regulating accessories for water or gas apparatus and pipes, namely, metered valves; steam generating heating installations; air cooling apparatus; evaporator; heat pump; heating system, namely, heating installations; heating installations, namely, a radiant tube; super steam heaters; pipes for heating boilers; expansion tanks, namely, hot water tanks | ACTIVE | — |
| 035 | [ (Based on 44(e)) business consultancy services ] | SECTION 8 - CANCELLED | — |
| 037 | (Based on Use in Commerce) (Based on 44(e)) Installation, repair and maintenance of complete industrial boilers and burners, industrial heating apparatus, incinerators and component parts thereof; installation, repair and maintenance of a complete process heating system and component parts thereof; installation, repair, and maintenance of flue gas treatment devices; cleaning and repair of boilers, industrial heating apparatus, burners, and incinerators; installation, maintenance and repair of heating equipment; rebuilding of machinery that has been worn or partially destroyed; installation, repair and maintenance of component parts and devices for gas and water treatments | ACTIVE | Jan 1, 2012 |
| 040 | (Based on Use in Commerce) (Based on 44(e)) water treatment, namely, clarification, filtering, decarbonization, and demineralization by resins; waste treatment, namely, transformation, recycling and incineration of all waste and trash; air purification; air deodorizing; odor neutralization services; assembly and disassembly of industrial boilers; rental of industrial boilers | ACTIVE | Jan 1, 2012 |
| 041 | (Based on Use in Commerce) (Based on 44(e)) Providing training services for others in the fields of flue gas, industrial heating, industrial water, the treatment of odor, waste incineration and trash incineration, and in the field of waste transformation and trash transformation | ACTIVE | Jan 1, 2012 |
| 042 | [ (Based on 44(e)) Technical monitoring scientific research services for others in the fields of components and complete industrial boilers, off gas treatments, industrial water treatments, waste and trash incineration, burners, incinerators, components and complete process heating systems, flue gas treatment devices, odor treatment devices and in the field of rendering devices; providing technical scientific research advice in the nature of technical monitoring scientific research services and scientific research consulting; preparation of technical expert scientific research reports, conducting engineering surveys, preparing technical scientific research project studies, providing engineering services, scientific research services and technology scientific research services and scientific research analysis services all in the fields of flue gas, industrial heating, industrial water, the treatment of odor, waste incineration or trash incineration, in the field of waste transformation and trash transformation ] | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ALDEBARAN BW
- Other trademarks owned by BABCOCK WANSON
- Other trademarks owned by CNIM 5
- Other trademarks owned by ALDEBARAN BW C5
- Other trademarks owned by Babcock Wanson Holding
- Other trademarks owned by Babcock Wanson Holding
- Other trademarks owned by Babcock Wanson Holding
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named BABCOCK WANSON
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 19, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 19, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 19, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 17, 2023 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Apr 17, 2023 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Apr 17, 2023 | 9G8P | REGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8 | — |
| Apr 17, 2023 | 8PRT | REGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED | — |
| Apr 17, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 4, 2022 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Aug 30, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 30, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 30, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 30, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 30, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Apr 10, 2021 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Feb 10, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 23, 2018 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Oct 23, 2018 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 17, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 4, 2018 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Sep 27, 2017 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Apr 12, 2017 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Apr 10, 2017 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Apr 5, 2017 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jul 8, 2016 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 8, 2016 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jul 6, 2016 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| May 24, 2016 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 24, 2016 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Apr 10, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 9, 2012 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Mar 8, 2012 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Feb 29, 2012 | ALIE | ASSIGNED TO LIE | — |
| Feb 28, 2012 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Feb 11, 2012 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 10, 2012 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Feb 10, 2012 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 8, 2012 | IUAF | USE AMENDMENT FILED | — |
| Feb 8, 2012 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 8, 2012 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 8, 2012 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Feb 6, 2012 | CORV | REVIEW OF CORRESPONDENCE COMPLETE | — |
| Jan 27, 2012 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Dec 8, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 17, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 16, 2011 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 16, 2011 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 3, 2011 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 3, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 10, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 8, 2011 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 8, 2011 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 8, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 12, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 10, 2010 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 15, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 15, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 8, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 7, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 7, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 7, 2010 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 7, 2010 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 7, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 7, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 9, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Mar 29, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 29, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 29, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 29, 2010 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 29, 2010 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 29, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 29, 2010 | ZZAX | PREVIOUS ALLOWANCE WITHDRAWN-TIMELY AAU | — |
| Mar 5, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Feb 23, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 23, 2010 | ALIE | ASSIGNED TO LIE | — |
| Jan 27, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 26, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 25, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 25, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 24, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 26, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 26, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 26, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 26, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 21, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 21, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 29, 2009 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 29, 2009 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 21, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 21, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 21, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 16, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 20, 2008 | NWAP | NEW APPLICATION ENTERED | — |