Drawing for ELBA

USPTO serial 77596813

ELBA

Reviewed by CopyMark Law Group

Reg. 3704460Status 710
Filing date
Status date
Registration date
Nov 3, 2009
Examiner
PINO, BRIAN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ELBA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jonathan Myers

JONATHAN MYERS K.F.ROSS P.C.5683 RIVERDALE AVE APT 203BRONX, NY 10471-2128UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006METAL CONCRETE DISTRIBUTION MASTSSECTION 8 - CANCELLED—
007MOBILE CONCRETE PREPARATION PLANTS FOR STATIONARY OPERATION, SUBSTANTIALLY CONSISTING OF MIXING MACHINES, MACHINES FOR SUPPLYING AND DISTRIBUTING AGGREGATES FROM STOCKYARDS, PILE STORAGES, BUNKERS AND PRIMARILY NON-METALLIC SILOS, MACHINES FOR STORING AND PROVIDING AGGREGATES, AND SCRAPERS, DOSING AND WEIGHING EQUIPMENT, NAMELY, DOSING FEEDERS, DOSING PUMPS, DISTRIBUTION PUMPS, DISTRIBUTION CHUTES AND BELTS, AND CONVEYORS AND CONVEYOR TROUGHS, CONCRETE BATCHERS, WEIGHING CONVEYOR BELTS CONSISTING OF A SCALE MOUNTED ON A CONVEYOR BELT; MIXING MACHINES FOR CONCRETE PREPARATION; DEVICE FOR SUPPLYING AND DISTRIBUTING AGGREGATES FROM STOCKYARDS, PILE STORAGES, BUNKERS AND SILOS, NAMELY, CONVEYOR BELTS, BAND ELEVATORS, SCREW CONVEYORS, SCRAPERS; POWER OPERATED SCRAPERS, NAMELY, HAND ACTUATED AND RADIAL SCRAPERS; STATIONARY SITE CONCRETE PUMPS; CRANES, IN PARTICULAR BUILDING CONSTRUCTION CRANES AND AUTOERECTING CRANES; BUILDING CONSTRUCTION CRANES HAVING CONCRETE DISTRIBUTION MASTS; MOBILE ELEVATORS, IN PARTICULAR BUILDING ELEVATORS; concrete processing equipment comprised of machines used for the processing of residual concrete substantially consisting of mechanical devices for filtering mixtures of solid/fluid matter, for grading solids contents, and a sludge collector machine, all sold together as a unit; TRUCK MOUNTED CONCRETE PUMPSSECTION 8 - CANCELLED—
009DOSING AND WEIGHING EQUIPMENT FOR THE PREPARATION OF CONCRETE, NAMELY, DOSIMETERS, MOISTURE METERS, INSTRUMENTS FOR PROPORTIONING AND WEIGHING CONCRETE AND CONCRETE ADMIXTURE INGREDIENTS, NAMELY, SCALES AND BALANCES; CONTROL DEVICES AND DATA PROCESSING DEVICES AS WELL AS SYSTEMS COMPOSED THEREOF FOR USE IN THE PREPARATION OF CONCRETE, IN PARTICULAR FOR CONTROLLING THE CONCRETE CONDITION, FOR ADDING THE MIXING WATER, FOR MONITORING THE AGGREGATE STORAGES, FOR DETERMINING AND RECORDING MANUFACTURING RECIPES, THE QUANTITY PRODUCED AND THE QUANTITY DELIVERED, NAMELY, ELECTRICAL CONTROLLERS, DATA PROCESSORS, LIQUID FLOW CONTROLS, LIQUID LEVEL CONTROLS, ELECTRONIC WATER FLOW CONTROLS, ELECTRONIC SENSORS, ELECTRONIC CONTROL PANELS, ELECTRONIC MOTOR CONTROLS, SAFETY VALVES FOR AUTOMATIC FLOW SHUT-OFF, AND SAFETY VALVES FOR AUTOMATIC SYSTEM SHUT-OFF; DATA INPUT AND OUTPUT DEVICES FOR USE IN THE PREPARATION OF CONCRETE INCLUDING MATERIAL PLANNING, NAMELY, DATA PROCESSORS, DATA PROCESSING DEVICES AND SYSTEMS COMPOSED THEREOF FOR USE IN THE CONSTRUCTION INDUSTRY, IN PARTICULAR FOR CUSTOMER ACCOUNTING, FOR INVOICING, FOR STATISTICS, FOR PLANNING THE EMPLOYMENT OF VEHICLES, FOR DRAWING UP DELIVERY NOTES, FOR CONTROLLING PRODUCTION, NAMELY, DATA PROCESSORSSECTION 8 - CANCELLED—
012TRANSPORT VEHICLES, IN PARTICULAR TRUCK MIXERSSECTION 8 - CANCELLED—
019DEVICES FOR STORING AND PROVIDING AGGREGATES IN CASE OF THE PREPARATION OF CONCRETE, NAMELY, PRIMARILY NON-METALLIC BOXES FOR STOCKYARDS, PRIMARILY NON-METALLIC SILOS WITH INTEGRAL SCREW CONVEYORSSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 10, 2016C8..CANCELLED SEC. 8 (6-YR)—
Nov 3, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 18, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 29, 2009NPUBNOTICE OF PUBLICATION—
Jul 13, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 12, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 8, 2009CNEAEXAMINERS AMENDMENT MAILED—
Jul 7, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Jul 7, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 1, 2009ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jun 19, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 10, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 10, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 1, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 1, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 28, 2009MAILPAPER RECEIVED—
Jan 31, 2009CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Jan 30, 2009ALIEASSIGNED TO LIE—
Jan 30, 2009CEAPEXAMINER'S AMENDMENT/PRIORITY ACTION MAILED—
Jan 30, 2009CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Jan 23, 2009DOCKASSIGNED TO EXAMINER—
Oct 24, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance