Drawing for BREEAM

USPTO serial 77617522

BREEAM

Reviewed by CopyMark Law Group

Reg. 3748317Status 710
Filing date
Status date
Registration date
Feb 16, 2010
Examiner
BEN, LINDSEY HEATHER
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with BREEAM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

D. Bruce Prout

D. BRUCE PROUT CHRISTIE, PARKER & HALE, LLPPO BOX 7068PASADENA, CA 91109-7068UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Scientific, surveying, measuring and testing apparatus and instruments, namely, distance measuring apparatus, electronic sensors for measuring solar radiation, gas sensors for measuring gas concentration, electric, electronic, or electrochemical oxygen monitors and sensors for environmental use, electronic based instruments for measuring environmental parameters including humidity, mould, bacteria, air quality and water; computer software for use in calculating, assessing and storing data all relating to a building's environmental impact; computer software for remote monitoring of environmental conditions; computer software for online access to information and online discussion on environmental factors of buildings; computer programs for use in calculating, assessing and storing data all related to a building's environmental impactSECTION 8 - CANCELLED—
016Printed information reports, printed reports, manuals for reference purposes, reference material in the nature of books, factsheets, digests, technical reference guides, handbooks, printed pamphlets and brochures, paper teaching materials, printed digests, printed guides all in the field of the design, construction, restoration, maintenance, repair, alteration, modification and improvement of buildings for enhanced environmental performance; printed certificates confirming that a building's environmental performance has been assessedSECTION 8 - CANCELLED—
037Providing building construction information; building construction supervision; consultancy, advisory information services in the field of building construction, installation of building insulation; consultancy, advisory and information services in respect of the restoration of buildings; advisory, information and consultancy services relating to the building construction industry; inspection of buildings during the course of building construction for environmental assessment purposes; information, advice and consultancy relating to waste disposal for othersSECTION 8 - CANCELLED—
040Information, advice and consultancy relating to the treatment, transformation, recycling, and destruction of waste and trash; Information, advice, and consultancy relating to industrial toxic waste disposal; information, advice and consultancy given to enable a contractor to assess which building site waste is suitable for treatment, transformation and recyclingSECTION 8 - CANCELLED—
042Research and development for others on design, construction, repair, restoration, alteration and improvement of buildings for better environmental performance; professional consultancy on building design, engineering consultancy services for building condition assessment, repair and restoration, alteration and improvement of buildings for better environmental performance; technical analysis of environmental factors in buildings; advisory, information and consultancy services relating to civil engineering work relating to building construction; inspection of existing buildings for environmental assessment purposesSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 23, 2016C8..CANCELLED SEC. 8 (6-YR)—
Feb 16, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 1, 2009NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 1, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 28, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 28, 2009ALIEASSIGNED TO LIE—
Oct 5, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 15, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Sep 15, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 15, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 15, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 14, 2009ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 12, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Aug 28, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 25, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 25, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Aug 25, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 25, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 25, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 19, 2009DOCKASSIGNED TO EXAMINER—
Aug 18, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 18, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 18, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2009DOCKASSIGNED TO EXAMINER—
Feb 10, 2009AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Feb 10, 2009ALIEASSIGNED TO LIE—
Feb 6, 2009MAILPAPER RECEIVED—
Nov 25, 2008MPMKNOTICE OF PSEUDO MARK MAILED—
Nov 24, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance