USPTO serial 77618665
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
David J. Davis
David J. Davis BAKER & MCKENZIE LLP300 E RANDOLPH ST STE 5000CHICAGO, IL 60601-6342UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, power amplifiers, analog to digital converter, and digital to analog converter; Manually or automatically operated acoustic and electric apparatus for conducting nondestructive testing, condition assessment and characterization, namely, storage tank scanners, pipeline gas rig scanners, drilling riser scanners, external pipeline scanners, fixed sensors for monitoring hydrates, ice, corrosion coating and monoethylene glycol (meg) content, fluid, scaling, and wax deposit content in piping and pipelines containing hydrocarbons or chemicals related to oil and gas production; manually or automatically operated acoustic and electric apparatus for conducting non-destructive testing, condition assessment and characterization, namely, a remotely operated vehicle (rov) which serves as a hull scanner; manually or automatically operated acoustic and electric apparatus for conducting non-destructive testing, condition assessment and characterization, namely, electronic hand held units for detection of water ingress in thermal piping insulation; Computer software for testing, certification, qualification, inspection, operation, safety management of equipment, design, construction, strength assessment, qualitative and quantitative risk assessment and information management and analysis, database functions, application service provider functions, and for providing technical and business support, namely, developing, analyzing, and maintaining applications and software of others all in process industry, chemical industry, petrochemical industry, offshore industry, maritime industry, aerospace, automotive, finance, food and beverage, healthcare, IT and Telecom, oil, gas and energy, biorisk, climate change, corporate responsibility, hospital accreditation, IT software and systems, operational excellence, quality management, risk management, railroads | SECTION 8 - CANCELLED | — |
| 016 | Brochures, books, printed instructional and teaching materials, reference manuals, all used in the field of the process industry, chemical industry, petrochemical industry, offshore industry, maritime industry, aerospace, automotive, finance, food and beverage, healthcare, IT and Telecom, oil, gas and energy, biorisk, climate change, hospital accreditation, IT software and systems, railroads and all in the subject matter of inspection, consulting, analysis, certification, classification, guidelines, rules and standards, corporate responsibility, operational excellence, quality management, and risk management; printed certificates; manuals for computer software | SECTION 8 - CANCELLED | — |
| 035 | Business management; business administration; business auditing; management of business risks; business consultancy; business management and organization consultancy; business risk management consulting; business management consultation in the field of certification, classification, quality control and quality assurance; business risk management consultation; business consulting in the field of benchmarking, measuring production, certification, and quality control; collection, supply and compilation of data in databases; business consultancy relating to knowledge and information management and to databases; occupational health and safety management | SECTION 8 - CANCELLED | — |
| 041 | Education services, namely, arranging, conducting and providing courses, training, seminars and workshops in the field of the process industry, chemical industry, petrochemical industry, offshore industry, maritime industry, aerospace, automotive, finance, food and beverage, healthcare, IT and Telecom, oil, gas and energy, biorisk, climate change, hospital accreditation, IT software and systems, and railroads and all in the subject matter of inspection, consulting, analysis, certification,classification, guidelines, rules and standards, corporate responsibility, operational excellence, quality management, and risk management; publication of books, journals, brochures; publication of texts, other than publicity texts; publication of rules, regulations, standards and protocols | SECTION 8 - CANCELLED | — |
| 042 | Scientific and technological services and research and design relating thereto, namely, research and design in the field of aerospace, automotive, food and beverage, IT and telecom, maritime, oil, gas and energy, petrochemical, biorisk, climate change, IT software and systems, railroads; Industrial analysis, namely, product research in the field of aerospace, automotive, food and beverage, healthcare, IT and Telecom, maritime, oil, gas and energy, petrochemical, biorisk, IT software and systems, rail roads, process industry, chemical industry, offshore industry; Technical consultancy services in the field of environmental science; technical consultancy in relation to technical research in the field of foods and beverages; Design and development of computer hardware and software; maintenance and implementation of software; software improvement and development services; IT service management, namely, remote and on-site management of the information technology (IT) systems of others; consulting in the field of computer risk management services; Safety management services, namely, product safety testing and food safety testing in the field of aerospace, automotive, food and beverage, healthcare, maritime, oil, gas and energy, petrochemical, rail roads, biorisk, hospital accreditation, process industry, chemical industry, offshore industry; Testing, and classifying the goods and services of others for the purpose of certification, verification and classification; Verification of the quality and quantity of raw materials, commodities, manufactured, semi-manufactured and transformed goods or goods or services of any other nature and their conformity with national and international norms, laws, rules, practice and standards and with clients' contractual requirements in the field of aerospace, automotive, finance, food and beverage, healthcare, IT and Telecom, maritime, oil, gas and energy, petrochemical, rail roads, biorisk, climate change, corporate responsibility, hospital accreditation, IT software and systems, process industry, chemical industry, offshore industry; Information technology consultation; computer software consultation; computer systems design and analysis consultation in the field of aerospace, automotive, finance, food and beverage, healthcare, IT and Telecom, maritime, oil, gas and energy, petrochemical, rail roads, biorisk, climate change, corporate responsibility, hospital accreditation, process industry, chemical industry, offshore industry; Product traceability services, namely, design and implementation of software for the purpose of product authentication and tracking, and brand monitoring and protection, to protect against counterfeiting, tampering, and diversion, and to ensure the integrity of genuine products; Assessment services, namely, testing, analysis and evaluation of the goods and services of others for the purpose of certification, verification and classification | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 31, 2020 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Jun 25, 2018 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Feb 25, 2015 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jun 25, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 20, 2013 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| May 10, 2013 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 30, 2013 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Apr 30, 2013 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Oct 30, 2012 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 4, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 4, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 15, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 31, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 31, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 12, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 12, 2012 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 12, 2012 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 12, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 29, 2012 | GEA1 | NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED | — |
| Jun 29, 2012 | GECD | ACTION DENYING REQ FOR RECON E-MAILED | — |
| Jun 29, 2012 | CNCF | ACTION CONTINUING FINAL - COMPLETED | — |
| May 21, 2012 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 17, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 17, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 23, 2012 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 23, 2012 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Apr 23, 2012 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Apr 23, 2012 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Nov 18, 2011 | GNS1 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED | — |
| Nov 18, 2011 | GNSF | SUBSEQUENT FINAL EMAILED | — |
| Nov 18, 2011 | CFRC | SUBSEQUENT FINAL REFUSAL WRITTEN | — |
| Oct 27, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 27, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 27, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 21, 2011 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 27, 2011 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 22, 2011 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Mar 22, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 1, 2011 | PAPER RECEIVED | — | |
| Aug 26, 2010 | CNCF | CONTINUATION OF FINAL REFUSAL MAILED | — |
| Aug 26, 2010 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| Aug 4, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 3, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 3, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Feb 12, 2010 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 6, 2010 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 27, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 27, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 27, 2010 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Sep 8, 2009 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Sep 5, 2009 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Aug 21, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 21, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 21, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 26, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 25, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 19, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 4, 2009 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Jan 4, 2009 | ALIE | ASSIGNED TO LIE | — |
| Dec 16, 2008 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Nov 25, 2008 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Nov 24, 2008 | NWAP | NEW APPLICATION ENTERED | — |