USPTO serial 77625371
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Kabushiki Kaisha Kobe Seiko Sho
Kobe-shi, Hyogo, JP
Kabushiki Kaisha Kobe Seiko Sho
Kobe-shi, Hyogo, JP
Kabushiki Kaisha Kobe Seiko Sho
Hyogo, JP
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey H. Kaufman
JEFFREY H. KAUFMAN Oblon, McClelland, Maier & Neustadt, L.L.P.1940 Duke StreetAlexandria, VA 22314-3454UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Metal cutting machines; metal strip rolling machines; dirt reduction machines, namely, water cleaning systems for removing dirt and salt of sea water from water separators, and vacuum cleaning systems for removing dirt and dust from waste disposal machines, comprised of filters; continuous metal casting machines; rolling mills and rollers for rolling mills; metal extruding machines; press machines, namely, industrial machine presses; extrusion press machines; forging presses; upsetter, namely, an industrial machine forging unit with mechanical presses; hot and cold isostatic press machines; wire drawing machines; mineral processing machines, namely, crushing machines, grinding mill machines, vibrating screen separators, feeding machines, pressure container vessels, heat exchangers, vaporizing machines, gas separation machines, reformer tubes, replacement valves, compressors and gas expanders; pumps, namely, centrifugal pumps, reciprocating pumps, rotary pumps, axial flow pumps, and mixed flow pumps; gas turbine generators, rotor shafts and turbine blades; rubber processing equipment, namely, tire curing machines, tire uniformity machines, tire testing machines, and tire shaping machines; plastic processing equipment, namely, palletizing machines and bead winding machines; foundry machines, namely, die casting machines; mixing machines for synthesizing rubber and plastic for tires; extruding machines for rubber for tires and plastic, namely, injection molding machines; plasma etching machines; hydraulic excavators; electric mining shovels and parts thereof, namely, drag lines; floating crane machines; pile drivers; bucket wheel excavators; cranes; wheel loaders; continuous unload conveyors; pressure crystallization machines for nuclear waste storage; municipal refuse shredding equipment, namely, paper and wood shredding machines; rough terrain cranes | SECTION 8 - CANCELLED | — |
| 009 | Welding electrodes; electrode wire for welding; electrical transformers for use with electric welding machines; computer systems comprised of computers, integrated circuits and electric circuit boards, for use with welding machines, machine tools, rubber processing equipment, waste and sewage treatment equipment, mineral processing equipment, and plastic processing equipment; real-time computer operating systems for use with welding machines, machine tools, rubber processing equipment, waste and sewage treatment, mineral processing equipment, and plastic processing equipment; monitoring system, namely, computer software and related computer components for monitoring welding machines, machine tools, rubber processing equipment, waste and sewage treatment equipment, mineral processing equipment, and plastic processing equipment; telemeters; electronic surface inspection machines; electronic control equipment, namely, computers for controlling waste and sewage treatment equipment and air-gas production equipment; electronic scientific measuring and checking equipment, namely, altimeters, oscilloscopes, voltmeters, hygrostats, thermostats, glass instruments for experimental use, namely, spectrographs and microscopes, and porcelain instruments for experimental use, namely, stills for laboratory experiments and electrostatic coating machines; noise level measuring and analytical units, for reducing noise from industrial machines, road work construction machines and tunnel work construction machines, comprised of acoustical metal and plaster, and replacement parts therefor | SECTION 8 - CANCELLED | — |
| 011 | Sodium oxide and nitrogen oxide removal machines, namely, desalination machines, disinfectant apparatus, and distillation apparatus; incinerators; industrial furnaces; furnace boilers; water and air pollution control equipment, namely, reverse osmosis equipment, cavitators, air washers, heating apparatus, suspension preheaters, cooling apparatus, drying apparatus, and liquefiers; cryogenic equipment sold as a unit, namely, cryogenic refrigerators, storage tanks, pumps, temperature measuring units, evaporators, condensers, heat exchangers, and pump chillers, for industrial use; filters for water and air cleaning machinery; rotary kilns; desalination units; apparatus for use in fermentation installations; induction units, namely, heaters; evaporators and evaporative cooling towers for use with furnaces, liquids and water; waste and sewage treatment equipment, namely, filters, agitators, dryers, absorbers, absorption collectors and dissolvers; and solid waste treatment equipment, namely, liquefiers | SECTION 8 - CANCELLED | — |
| 037 | Maintenance and repair of apparatus and instruments for scientific measuring and checking, namely, altimeters, oscilloscopes, voltmeters, hygrostats, thermostats, glass instruments for experimental use, namely, spectrographs and microscopes, and porcelain instruments for experimental use, namely, stills for laboratory experiments; installation, maintenance and repair of equipment for use with waste and sewage treatment, steam and electric heating, steam generation, refrigeration, drying, ventilating, water supply and sanitary waste processing; maintenance and repair of computer hardware; maintenance and repair of metal working machines and of the controls, motors and compressors for said equipment; installation, maintenance and repair of construction equipment, namely, excavators and compressors; building construction services; and rental of construction equipment | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 27, 2021 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Jan 20, 2020 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| May 1, 2015 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 1, 2015 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 25, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 20, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 4, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 4, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 15, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 29, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 25, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 25, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 24, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 24, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 9, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2014 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 25, 2014 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Mar 11, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 11, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 19, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 6, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 4, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 15, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 14, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 14, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 15, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 15, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 15, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 10, 2013 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 3, 2013 | 44EG | 44(e) PETITION - GRANTED | — |
| Jul 1, 2013 | APET | ASSIGNED TO PETITION STAFF | — |
| Jun 27, 2013 | TPAD | TEAS PETITION TO AMEND BASIS RECEIVED | — |
| Jun 10, 2013 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Dec 28, 2012 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 26, 2012 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Dec 26, 2012 | EXT5 | SOU EXTENSION 5 FILED | — |
| Dec 26, 2012 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 21, 2012 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 19, 2012 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jun 19, 2012 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jun 19, 2012 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 30, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 28, 2011 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Dec 28, 2011 | EXT3 | SOU EXTENSION 3 FILED | — |
| Dec 28, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 2, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 1, 2011 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jun 29, 2011 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jun 29, 2011 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 19, 2011 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 18, 2011 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jan 18, 2011 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Dec 17, 2010 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 17, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 29, 2010 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 14, 2010 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Jan 27, 2010 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Dec 29, 2009 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 29, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 20, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 20, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 20, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 20, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 19, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 26, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 26, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 26, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 24, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Apr 15, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 14, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 10, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 10, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 9, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 9, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 9, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 9, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 3, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 23, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Dec 23, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 23, 2008 | ALIE | ASSIGNED TO LIE | — |
| Dec 9, 2008 | PAPER RECEIVED | — | |
| Dec 8, 2008 | NWAP | NEW APPLICATION ENTERED | — |