Drawing for PLUG INTO THE SMART GRID

USPTO serial 77635931

PLUG INTO THE SMART GRID

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
GAST, PAUL
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with PLUG INTO THE SMART GRID?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Catherine Mennenga

CATHERINE MENNENGA GENERAL ELECTRIC COMPANY3135 EASTON TPKE.COPORATE TRADEMARK OPERATIONFAIRFIELD, CT 06828-0001

Goods and services

ClassDescriptionStatusFirst use
035Energy usage management; energy usage management information services; information services in the field of energy efficiency; utility bill management services, namely, tracking, reporting, analyzing and delivering energy information in the form of utility meter data rate schedules; demand-side management, namely, management of energy consumption by electrical appliances; smart building management; consultation services in all of the foregoingACTIVE—
037Installation, repair, and maintenance services of equipment and technology utilized in connecting to, monitoring, and delivery of smart grid energy resourcesACTIVE—
042Automatic meter reading, diagnostic services in the field of electrical, water and gas meters, namely, real-time fault detection and isolation, electricity and natural gas services, namely, power quality monitoring through meter data management and analysis; remote connect/disconnect of electric, water and gas meters in the field of energy electronic communications networks; computer services, namely, providing a web-based system and on-line control portal for smart grid connected control devices for customers to manage remotely, administer, modify and control their control devices; Engineering services in the field of energy and power, particularly as relating to the smart gridACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Jan 9, 2012MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jan 9, 2012ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
May 20, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 19, 2011EX4GSOU EXTENSION 4 GRANTED—
May 16, 2011EXT4SOU EXTENSION 4 FILED—
May 16, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 8, 2010EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 7, 2010EX3GSOU EXTENSION 3 GRANTED—
Nov 23, 2010EXT3SOU EXTENSION 3 FILED—
Nov 23, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 1, 2010EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 30, 2010EX2GSOU EXTENSION 2 GRANTED—
Jun 30, 2010AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jun 7, 2010EXT2SOU EXTENSION 2 FILED—
Jun 7, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 7, 2009EX1GSOU EXTENSION 1 GRANTED—
Dec 7, 2009EXT1SOU EXTENSION 1 FILED—
Dec 7, 2009EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 9, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 17, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 25, 2009NPUBNOTICE OF PUBLICATION—
Feb 12, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 12, 2009ALIEASSIGNED TO LIE—
Feb 3, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 3, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Feb 3, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 3, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 3, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 27, 2009DOCKASSIGNED TO EXAMINER—
Dec 22, 2008NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance