USPTO serial 77636249
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Engines using alternative fuels, namely, gas, coal, mine gas, biogas created during the fermentation of agricultural waste, sewage gas and industrial waste gas; apparatus, equipment and instruments for the generation of power, namely, electric generators and wind powered electricity generators; turbines; turbines for power generation; wind turbines for power generation; wind turbines in association with wind farms, turbine generating installations, namely, power generating installations; engines for the generation of electricity; and parts and fittings for all the aforesaid; solar-powered electricity generators; hydroelectric power generators; complete line of materials, appliances, machinery, components, parts, systems and plants for the generation, transformation, conversion, transmission, distribution, control and utilization of electricity; dynamo electric machines, induction devices, electric translating devices, electric regulating and controlling devices, electric lamps, electric measuring instruments, electric protective devices, switchboards, switchboard appliances, wiring devices, and supplies; electric motors of all kinds, steam and gas turbines and parts thereof, electric generators and their parts, aircraft engines, compressors; washing machines, laundry centers, namely, a clothes washer combined with a clothes dryer, dishwashers, garbage disposers and compactors; pumps, namely, centrifugal pumps, diaphragm pumps, bellows pumps and process and transfer pumps; fluid control devices, namely, valves, flow meters, pressure switches, sequence timers, regulators, levelers, ejectors, and electrical controls and switches; fluid separation cartridges and parts therefore, including semi-permeable membranes; filter cartridges for various industrial machines for filtration applications including the filtration of coating solutions for the manufacture of magnetic tape and the filtration of petrochemicals, portable water, beer in the brewing industry, and other specialty chemicals. machines for the feeding and application of chemicals for industrial use; axial and centrifugal compressors; reciprocating compressors; screw and vane compressors; rotary, vacuum, electric, submersible and centrifugal pumps; turbo expanders, namely, air and electric compressors; CNG refueling machines for land vehicles and industrial equipment and accessories and parts for all the foregoing, namely, pumps, valves, fuel filters, filter casings, distributor rotors, blades, bearings and mechanical seals; steam condensers; Boat engines; turbochargers for engines; fuel injectors; electric mixers; electric knives; electric can openers, vacuum cleaners | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 29, 2010 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 29, 2010 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Aug 25, 2009 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 2, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 13, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Apr 28, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 28, 2009 | ALIE | ASSIGNED TO LIE | — |
| Apr 28, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 28, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 28, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 28, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 28, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 13, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 23, 2008 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Dec 22, 2008 | NWAP | NEW APPLICATION ENTERED | — |