Drawing for ALPIQ

USPTO serial 77637420

ALPIQ

Reviewed by CopyMark Law Group

Reg. 3805425Status 710
Filing date
Status date
Registration date
Jun 22, 2010
Examiner
ANKRAH, NAAKWAMA S
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ALPIQ?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Connie L. Ellerbach, Esq.

CONNIE L. ELLERBACH, ESQ. FENWICK & WEST LLP801 CALIFORNIA STREETSILICON VALLEY CENTERMOUNTAIN VIEW, CA 94041

Goods and services

ClassDescriptionStatusFirst use
004Electric energy; fuels, namely, motor spirit, gas oil, gasoline, all purpose lubricants and illuminants, namely, oilSECTION 8 - CANCELLED
007Apparatus and installations, namely, electricity generators, hydraulic turbines, hydraulic accumulators, handling machines for nuclear power production plants, motors and parts of motors except for land vehicle), and alternators and regulators being machine parts, all for the production of electric powerSECTION 8 - CANCELLED
009Apparatus, instruments and installations, namely, electric storage batteries, switch cabinets, electric distribution and junction boxes, electric cables, electrical conduits, circuit breakers, electrical control systems, electric apparatus for computation, meters/counters, electric conductors, circuit closers, connectors, current rectifiers, reducers, cut-outs, switches, electric relays, electrical control, connection or distribution panels, transformers; electronic control and monitoring equipment; connections for electric lines, contact lines; fittings for overhead electric lines; pantographs; electrical installation equipment, in the nature of installation switches, junction boxes, fuses, circuit breakers and accessories for wiring and installation of electrical equipment in homes, apartments, offices and industrial buildings; and equipment for electrical conduits and installations, namely, cables for heavy current, all for the production and the distribution of electric powerSECTION 8 - CANCELLED
011Apparatus, instruments and installations, namely, nuclear reactors, and nuclear power plants for producing nuclear power; installations for the treatment of nuclear fuels, cogeneration plants, steam accumulators, heat accumulators, gas generators; heating installations and their accessories, namely, air pre-heaters; heat recovery equipment for utilizing the waste heat of cooling operations and heat recovery systems, namely, pumps for eliminating flying cinders, water level regulators, heat accumulators, vapor condensers, cooling towers and graduation works for cooling returned water, heating installations, hot water preparation plants, pipes and tubes for heating installations and furnaces, all for the production of nuclear energySECTION 8 - CANCELLED
036Financial affairs, namely, equity capital investment, funds investment, security brokerage, stock exchange brokerage, stock exchange quotations, and bond, derivatives and shares brokerage services, and the issuance and trading of stocks, bonds, commodities, futures and options in field of energy; financial consultation in field of energySECTION 8 - CANCELLED
037Constructions, repair, installation and maintenance services of generators, accumulators, turbines, alternators and regulators, electric cables, electric lines, pipes, and power plants in the field of energy, water and technical installationsSECTION 8 - CANCELLED
039Transport, distribution and storage of energy, electricity and waterSECTION 8 - CANCELLED
040Production of energy; production of electricitySECTION 8 - CANCELLED
042Technical research and engineering in the field of energy, electricity and water qualitySECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 27, 2017C8..CANCELLED SEC. 8 (6-YR)
Jun 22, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 6, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Apr 6, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 1, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Feb 16, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Feb 16, 2010XAECEXAMINER'S AMENDMENT ENTERED
Feb 16, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Feb 16, 2010GNEAEXAMINERS AMENDMENT E-MAILED
Feb 16, 2010CNEAEXAMINERS AMENDMENT -WRITTEN
Oct 20, 2009CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED
Oct 19, 2009GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
Oct 19, 2009GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
Oct 19, 2009CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED
Sep 30, 2009ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Sep 19, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 19, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 18, 2009ALIEASSIGNED TO LIE
Sep 16, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 16, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 16, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 16, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 16, 2009DOCKASSIGNED TO EXAMINER
Dec 24, 2008NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance