USPTO serial 77671218
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Robert W. Sacoff
Robert W. Sacoff Pattishall, McAuliffe, Newbury, Hilliard & Geralds200 S. WACKER DRIVE, SUITE 2900CHICAGO, IL 60606-6631UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal risers and riser systems, namely, production risers, drilling risers, service/workover risers and riser connectors for use in the oil and gas drilling industry; metal subsea risers and umbilicals in the nature of metal cable wire for use with subsea risers | SECTION 8 - CANCELLED | — |
| 007 | Oil and gas production machinery and apparatus, namely, drilling and workover systems comprising a drilling derrick, workover risers in the nature of elevating platforms and substructures in the nature of elevating platforms and structural parts for the foregoing; drilling rigs, liquid and gas producing installations, namely, subsea and downhole drilling machines, swivels for use in connection with drilling machines; pneumatic tube transporters for use in communication in oil and gas well drilling operations | SECTION 8 - CANCELLED | — |
| 009 | Wireline in the nature of wires, cables, and fiber optic cables for the transmission of electricity and data communications | SECTION 8 - CANCELLED | — |
| 011 | [ Water treatment equipment, namely, chemical sterilization units, reverse osmosis filtration units, cartridge filtration units; water treatment machines in the nature of thickening and dewatering machines for use in treatment of liquids including water, industrial effluent and sewage; Machines for purifying, blending and processing oil and natural gas and structural parts and components for the aforesaid goods, sold as a unit ] | SECTION 8 - CANCELLED | — |
| 012 | [ Ships; boats; tankers; sea-going vessels; and structural parts for all of the foregoing; lift caissons in the nature of a vehicle for use in connection with oil and gas well drilling; drilling ships, namely, ocean going vessels equipped with well drilling machines and oil well pumping machines, tethers and mooring buoys for drilling ships or oil tankers, oil and gas drilling rigs and structural parts and fittings therefor; tractor and logging products, namely, wireline tractors for use with scale removal, milling/side-tracking, sand-bailing, perforating and plug-setting for use down hole in the extraction, processing and exporting of oil and natural gas ] | SECTION 8 - CANCELLED | — |
| 019 | [ Lift caissons for underwater construction work; water treatment equipment, namely, baffle panels in the nature of submergible fiberglass walls used to direct water flow at waste water treatment facilities ] | SECTION 8 - CANCELLED | — |
| 020 | [ Furniture, mirrors, picture frames; shelves and brackets sold as a unit ] | SECTION 8 - CANCELLED | — |
| 029 | [ Meat, fish, poultry and game; meat extracts; preserved, dried and cooked fruits and vegetables; jellies, jams, compotes; eggs, milk and milk products, excluding ice cream, ice milk and frozen yogurt; edible oils and fats ] | SECTION 8 - CANCELLED | — |
| 035 | [ Advertising and ] business management consultancy; business management; business management and consultation; business administration and management; business administration and office work; business operation, business administration and office functions; compiling information for use in databases relating to business management | SECTION 8 - CANCELLED | — |
| 037 | Building, modification, repair and installation services for others in the field of drilling processing installations, namely, oil and natural gas plants; repair and installation of oil and natural gas rigs and machinery and equipment namely, oil and gas production machinery and apparatus, namely, drilling and workover systems comprising a drilling derrick, workover risers in the nature of elevating platforms and substructures in the nature of elevating platforms, and parts for the foregoing; repair and installation of drilling rigs; repair and installation of liquid and gas producing installations, namely, subsea and downhole drilling machines, swivels for use in connection with drilling machines and machines for purifying, blending and processing oil and natural gas and structural parts and components for the aforesaid goods | SECTION 8 - CANCELLED | — |
| 040 | Treatment of metal; [ Custom manufacture of boats to the order and specification of others; ] custom construction or modification for others of mechanical and automated oil and gas drilling and well intervention equipment, units and rigs; custom construction for others of risers, drilling platforms, oil and gas production platforms and equipment for use in the oil and gas industry | SECTION 8 - CANCELLED | — |
| 042 | Scientific research; industrial research in the field of the oil and gas industry, energy resources, energy technologies, maritime technologies, seafood, biotechnology and pulp and paper making industry | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 12, 2021 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| May 3, 2020 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Nov 30, 2017 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Nov 30, 2017 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Nov 30, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 3, 2017 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| May 3, 2016 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jul 12, 2013 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 3, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 29, 2011 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Mar 29, 2011 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 28, 2011 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Mar 28, 2011 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Oct 8, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 6, 2010 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 6, 2010 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 6, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 6, 2010 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 12, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 12, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 11, 2010 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 11, 2010 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 7, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 4, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 1, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 1, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 1, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 1, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 18, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 18, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 18, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 18, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 18, 2009 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Nov 16, 2009 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Nov 2, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 30, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 23, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 23, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 23, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 23, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 18, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 18, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 15, 2009 | ALIE | ASSIGNED TO LIE | — |
| Oct 8, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 9, 2009 | CEPE | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED | — |
| Apr 9, 2009 | GEAN | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Apr 9, 2009 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Apr 9, 2009 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Apr 6, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 3, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 31, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 31, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 30, 2009 | ALIE | ASSIGNED TO LIE | — |
| Mar 30, 2009 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Mar 27, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 19, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 19, 2009 | NWAP | NEW APPLICATION ENTERED | — |