Drawing for RDM

USPTO serial 77701705

RDM

Reviewed by CopyMark Law Group

Reg. 3858848Status 800Registered
Filing date
Status date
Registration date
Oct 12, 2010
Examiner
COLEMAN, CIMMERIAN
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with RDM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kevin Oliveira

Kevin Oliveira Odin, Feldman & Pittleman PC1775 Wiehle Avenue, Suite 400Reston, VA 20190-5159UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042Engineering services, namely, geotechnical engineering, civil engineering, structural engineering, mechanical engineering, electrical engineering; environmental engineering and surveying; construction quality control, namely, inspection and materials testing of concrete, masonry, soils, asphalt paving, metals, pavement, and coatings; structural, mechanical, electrical, and building inspections and plan reviews; consulting services in the design and development of preventive maintenance programs for municipal infrastructure facilities; engineering consulting, namely, analyzing failure modes and effects and providing finite element modeling for municipal infrastructure facilities; custom design and development of mechanical integrity programs for municipal infrastructure facilities; non-destructive testing and evaluation of industrial safety processes in municipal infrastructure facilities; roadway and traffic engineering and design engineering services; providing testing services and inspection services in the field of roadway and traffic engineering and consulting services in connection therewith; Conducting engineering and technical surveys; Surveying and engineering; Conducting of feasibility studies; Conducting engineering studies; Conducting engineering project studies; design engineering for airfields, and consulting services in connection therewith; design engineering services in the field of transportation systems and consulting services in connection therewith; structural engineering services; testing, inspection and consulting services in the field of structural engineering; engineering services in connection with the design of municipal infrastructure facilities and consulting services in connection therewith; construction engineering and design services for others and providing consulting services in connection therewith; geotechnical engineering services; geotechnical testing services and consulting services in connection therewith; facilities design engineering services and consulting services in connection therewith; foundation engineering, foundation testing and design services for others, and consulting services in connection therewith; materials engineering; materials testing, materials inspection, and consulting services in connection therewith; environmental engineering services; research in the field of construction of road, street and highway and runway and taxiway networks; research in the field of transportation and traffic on road, street and highway and runway and taxiway networks; scientific research; industrial research in the field of transportation and traffic on road, street and highway and runway and taxiway networks; technical project study, namely, conducting technical studies in the field of transportation and traffic on road, street and highway and runway and taxiway networks; technical research in the field of transportation and traffic on road, street and highway and runway and taxiway networks; industrial research and development of products for others in the fields of transportation and traffic on road, street and highway and runway and taxiway networks, management of geographic location determination systems and information in connection with traffic conditions on road, street and highway and runway and taxiway networks; quality control for others; computer programming; development and design of computer software; consultation services in the field of environmental assessment and planning; urban planning; scientific and technological services and research and design relating thereto, namely, scientific research in connection with road, street and highway traffic and runway and taxiway use; industrial analysis and research services, namely, industrial design and research in the fields of engineering, construction, and architecture; architectural and engineering project management services, namely, consulting in the fields of engineering and architecture; facilities management, namely, engineering services for monitoring of paved surfaces, road, street and highway, runway, taxiway and apron facilities, environmental consulting; off-site building project management, namely, computer project management services; project design management, namely, design for others in the fields of engineering and architecture; land surveying; construction drafting; technical drawing and testing services, namely, technical surveying; quality testing and design services, namely, material testing; quality control services for others; architectural design; architectural and interior design services; technological consultation in the technology field of computer hardware systems; professional services relating to research, design and development, namely, research on building construction, architecture, and engineering and city planning; collection of geographic information for processing into databases for use in computerized land information systems; mapping services; field survey and utility survey services; custom design of geographic information systems (GIS); computer image processing and data conversion of computer program data or information; providing mapping and design of industrial automation systems to assist in the maintaining, operation, and management of infrastructure; computer consultation; computer software design and programming for others, namely, development and application of computerized data analysis software and computer systems; computer modeling services for interpreting, assessing and simulating environmental conditions; computer consultation services, namely, assessment of data quality needs in the fields of database systems development and management, electronic data collection and transfer, data validation, computerized data applications, data presentation and interpretation, and computer system integrations; computer services, namely, providing databases for creating modeling, simulation, trending, and statistical analysis for utilizing, designing and implementing data information networks; providing engineering-based assessments of physical facilities and operating subsystems for use by others to determine condition and remaining useful life; industrial facility asset management, namely, providing engineering-based physical field assessments and oversight of facilities and major operating components for others, and recommending design solutions for facility deficiencies; provision of information, advisory and consultancy services relating to all the aforesaid servicesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 5, 2021NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Jan 5, 2021RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jan 5, 202189AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jan 5, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Oct 12, 2020E89RTEAS SECTION 8 & 9 RECEIVED
Oct 12, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Jul 11, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Jul 11, 2016C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Jul 11, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 3, 2016E815TEAS SECTION 8 & 15 RECEIVED
Oct 21, 2015ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Sep 28, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Oct 12, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 27, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 7, 2010NPUBNOTICE OF PUBLICATION
Jun 21, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 21, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jun 17, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 17, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 17, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 25, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 24, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 14, 2010DOCKASSIGNED TO EXAMINER
Jan 14, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Dec 28, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Dec 14, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Dec 13, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 11, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 11, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 11, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 28, 2009CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 27, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 20, 2009DOCKASSIGNED TO EXAMINER
Jul 20, 2009ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Jul 4, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Jun 25, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 25, 2009ALIEASSIGNED TO LIE
Jun 20, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jun 17, 2009DOCKASSIGNED TO EXAMINER
Apr 2, 2009MPMKNOTICE OF PSEUDO MARK MAILED
Apr 1, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 1, 2009NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance