Drawing for RDMCQUEEN.COM

USPTO serial 77701726

RDMCQUEEN.COM

Reviewed by CopyMark Law Group

Reg. 4010785Status 800Registered
Filing date
Status date
Registration date
Aug 16, 2011
Examiner
OLANDRIA, WARREN
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with RDMCQUEEN.COM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kevin Oliveira

Kevin Oliveira ODIN FELDMAN PITTLEMAN PC1775 Wiehle Avenue, Suite 400Reston, VA 20190-5159UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; paving and surfacing of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; rebuilding of infrastructure and infrastructures in the form of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; construction services, namely, construction of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces and heavy general construction contracting; asphalt and concrete construction and paving services; construction and building project management, planning, consultation and supervision services; installation, repair, and maintenance of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; consultation services in the installation and maintenance of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; general construction contracting; on-site project management relating to construction, installations and refurbishment, namely, construction supervision; consulting in pavement maintenance programs for others; consulting services in the field of site and soil stabilization; servicing of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; installation, maintenance and repair of electrical and IT apparatus and equipment; project management for building, construction and civil engineering projects, namely, construction supervision; airport taxiway, apron, runway, road and parking lot construction; road, street and highway construction; parking lot construction; paved surface construction; soil stabilization; pond, lake and basin construction; structural excavation; asphalting; concreting; paving; airfield maintenance, namely, repair and maintenance of airfield infrastructure, runways, taxiways, aprons, road and parking lots; airfield construction services, namely, runway, taxiway, and apron paving, and taxiway, apron and runway improvements; pier maintenance; paving contractor services; paving of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; building construction and repair services, namely, partial and complete rehabilitation of paved surfaces, roads, streets and highways, airport runways, taxiways, aprons, roads and parking lots, and buildings; new construction of paved surfaces, roads, streets and highways, airport runways, taxiways, aprons, roads and parking lots, buildings and piers; development and construction services in the nature of site work, namely, excavating, grading, clearing, cutting and patching asphalt, concrete and laying pipeline, placement and compaction of rock, sand, dirt, asphalt and concrete; construction, repair, maintenance and renovation of pavement surfaces, road, street, highway, runway, taxiway and apron surfaces; excavation services; pipeline installation; earthworks construction; concrete construction; masonry; provision of information, advisory and consultancy services relating to all the aforesaid servicesACTIVEFeb 18, 1999

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 22, 2021NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Nov 22, 2021RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Nov 22, 202189AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Nov 22, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 1, 2021E89RTEAS SECTION 8 & 9 RECEIVED—
Aug 16, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 16, 2017NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 16, 2017C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 16, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 11, 2017E815TEAS SECTION 8 & 15 RECEIVED—
Oct 21, 2015ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Sep 28, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 16, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 31, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 11, 2011NPUBNOTICE OF PUBLICATION—
Apr 26, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 16, 2011EXPTEXPARTE APPEAL TERMINATED—
Apr 16, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 22, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 22, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 22, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 7, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 6, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 9, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 9, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 27, 2010ALIEASSIGNED TO LIE—
Jul 19, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 19, 2010EXPIEX PARTE APPEAL-INSTITUTED—
Jul 19, 2010JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jul 19, 2010EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Jan 19, 2010CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 18, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 21, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 20, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 20, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 25, 2009CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 24, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 17, 2009DOCKASSIGNED TO EXAMINER—
Apr 2, 2009MPMKNOTICE OF PSEUDO MARK MAILED—
Apr 1, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 1, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance