Drawing for INTECSEA

USPTO serial 77716450

INTECSEA

Reviewed by CopyMark Law Group

Reg. 3736266Status 800Registered
Filing date
Status date
Registration date
Jan 12, 2010
Examiner
WOOD, CAROLINE
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with INTECSEA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Construction and construction management of offshore platforms and facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, platforms for research and production of oil and gas, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; repair and maintenance services, namely, maintenance and repair of apparatus and installations at offshore locations on and under water for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of ships; maintenance and repair of floating offshore equipment for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of pipelines; maintenance and repair of steel constructions and civil engineering constructions, namely, offshore platforms and facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers bridges, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; maintenance and repair of industrial installations, namely, industrial installations for oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of exploration, drilling, pumping, transporting, and refining machines for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of machines for use in vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; building and constructing pipelines, drainage systems, oil and gas production facilities, light-installations, roads, wells and shafts; repair of vessels, the dragging of rivers and other waterways; installation of drilling and production platforms; laying, repairing, maintaining and burying pipelines; construction of drilling pilings on land and sea; mining extraction; extraction of oil, gas and other energy-products by drilling and pumping; rental of apparatus for drilling and pumping of oil, gas and other energy-products; construction planning and construction consultation services for construction of offshore facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy-products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factoriesACTIVEAug 8, 2008

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 20, 2020NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Feb 20, 2020RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 20, 202089AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 20, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 7, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jan 7, 2020E89RTEAS SECTION 8 & 9 RECEIVED
Oct 23, 2019CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Oct 23, 2019COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Jun 24, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 24, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jun 19, 2019ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Jan 12, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Mar 15, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Mar 15, 2016C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Mar 15, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 12, 2016E815TEAS SECTION 8 & 15 RECEIVED
Jan 12, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jan 30, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 30, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jan 12, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 27, 2009NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 27, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 18, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Sep 17, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Sep 8, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 8, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 8, 2009ALIEASSIGNED TO LIE
Sep 3, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 14, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 14, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 14, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2009DOCKASSIGNED TO EXAMINER
Apr 21, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 21, 2009NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance