USPTO serial 77716458
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Houston, TX
Houston, TX
Houston, TX
HOUSTON, TX
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Engineering and design of offshore facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy-products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; design of apparatus and installations for offshore locations on and under water for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; design of apparatus and installations for ships and floating offshore equipment for use in use in offshore oil and gas exploration, drilling, pumping, transporting and refining; design of apparatus and installations for pipelines, steel constructions, namely, offshore facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; design of apparatus and installations for industrial installations, namely, industrial installations for oil and gas exploration, drilling, pumping, transporting and refining; design of offshore oil and gas exploration, drilling, pumping, transporting and refining apparatus and machines for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; scientific and industrial research and technical studies; technical design of offshore facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; quality control services in the fields of construction, repair and maintenance of equipment in use for oil and gas exploration, drilling, pumping, transporting and refining; quality control services in the fields of transportation, storage, research and extraction of oil, gas and other energy products | ACTIVE | Aug 8, 2008 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 20, 2020 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Feb 20, 2020 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Feb 20, 2020 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Feb 20, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 7, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 7, 2020 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Oct 23, 2019 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 23, 2019 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jun 24, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 24, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 19, 2019 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jan 19, 2019 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Mar 16, 2016 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Mar 16, 2016 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Mar 16, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 13, 2016 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jan 13, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 30, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 30, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 19, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 3, 2009 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 3, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 30, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 30, 2009 | ALIE | ASSIGNED TO LIE | — |
| Sep 18, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 18, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 18, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 18, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 18, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 4, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 3, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 3, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 14, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 14, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 14, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 7, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 21, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 21, 2009 | NWAP | NEW APPLICATION ENTERED | — |