Drawing for ZERO HARM

USPTO serial 77726075

ZERO HARM

Reviewed by CopyMark Law Group

Reg. 3733720Status 710
Filing date
Status date
Registration date
Jan 5, 2010
Examiner
MCCRAY, RENEE
Law office
—

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ZERO HARM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jonathan M. Gelchinsky

Jonathan M. Gelchinsky Pierce Atwood LLP254 Commercial StreetPortland, ME 04101UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Provision of business management services; business project management; business supervision and management of subcontractors [ ; business information services relating to construction, engineering and railways; contract analysis, namely, estimating contract work ]SECTION 8 - CANCELLED—
037Construction and building of highways, bridges, tunnels, railways, sewers and airports; engineering and rail contracting services; repair and maintenance of buildings, civil engineering structures, roads, highways and railways; installation, repair and maintenance of electrical bus bars, overhead and third rail electrification apparatus, rail signaling and switching apparatus, power distribution systems, substations and trackwork; construction, repair, and maintenance of steel structures and space frame structures; construction supervision, namely, supervision and management of subcontractor; information, consultancy and advisory services relating to the aforesaid servicesSECTION 8 - CANCELLED—
042[ Design services relating to the construction, engineering and railway industries; preparation of technical reports relating to construction, engineering and railways; civil engineering; mechanical engineering; electrical engineering; rail engineering; process engineering; geotechnical engineering ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 30, 2020CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Oct 30, 2020CORVREVIEW OF CORRESPONDENCE COMPLETE - POWER OF ATTORNEY ENTERED—
Oct 30, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 6, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jul 6, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 6, 2020ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jul 6, 2020EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Jul 6, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 6, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 6, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jan 5, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Apr 5, 2017CORVREVIEW OF CORRESPONDENCE COMPLETE - ADDRESS UPDATED—
Jan 31, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 7, 2016NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Feb 7, 20168.PRREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED—
Jan 18, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 4, 2016ES8RTEAS SECTION 8 RECEIVED—
Jan 5, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 20, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 30, 2009NPUBNOTICE OF PUBLICATION—
Sep 16, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 14, 2009ALIEASSIGNED TO LIE—
Sep 6, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 21, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 21, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 21, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 8, 2009CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 7, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 7, 2009DOCKASSIGNED TO EXAMINER—
May 5, 2009MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
May 4, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 4, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance