USPTO serial 77772266
MARS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 13, 2011
- Examiner
- MILTON, PRISCILLA
- Law office
- TMO LAW OFFICE 110
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with MARS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrea L. Arndt
Andrea L. Arndt Dickinson Wright PLLC1825 Eye St. NWSuite 900Washington, DC 20006Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemical preparations, namely, silicon carbide and silicon nitride composition, for use in igniting natural and propane gasses in industrial heating applications | ACTIVE | — |
| 006 | [ Metal fasteners, namely, sheet metal, concrete, masonry and drywall screws, metal anchors, washers of metal for providing spacing for screws and bolts, metal toggle bolts, metal clips, namely, pipe holders and hangers used to hang and install pipe; metal plugs; metal tubing; metal fittings, namely, metal hose fittings, metal joinery fittings, metal pipe fittings, metal ring shaped fittings; ] condenser mounting brackets, namely, metal brackets used to support air-conditioning condensing units upon installation | ACTIVE | Oct 9, 1992 |
| 007 | Motors, namely, heating, ventilation, air-conditioning, pump and commercial refrigeration motors; condenser mounting brackets specially adapted for air condensers, namely, metal brackets used to support air-conditioning condensing units upon installation; motors, namely, heating, ventilation, air-conditioning, pump and commercial refrigeration motors; pump-ups specially adapted for use with air condensers composed of plastic materials to support air-conditioning condensing units upon installation; air conditioning pads comprised of plastic, foam or other materials specially adapted for use with air condensers to support air-conditioning condensing units upon installation | ACTIVE | — |
| 009 | Electric relays, namely, switching relays; pressure switches for controlling, and switching refrigeration and air-conditioner systems; electrical wire connectors; electrical components in the nature of electric contactors; Electric relays and transformers for fan centers, electronic leak detectors for use in detecting refrigerant gasses, thermocouples, thermostats, fixed fan and limit electric switches, electric heat sequencers and laser levels used in heating, ventilation, air-conditioning and refrigeration applications; voltage sticks used to detect presence of voltage and current flow in cables, wall outlets, fuses, circuit breakers, junction boxes, power tools and appliances; batteries; transformers | ACTIVE | — |
| 017 | Insulating tapes for electrical insulation; insulation cork, foam vinyl-aluminum tapes for thermal insulation and condensation prevention used on pipes and fittings; pump-ups composed of plastic materials to support air-conditioning condensing units upon installation; flexible PVC pipe and fittings therefor; air conditioning pads comprised of plastic, foam or other materials to support air-conditioning condensing units upon installation | ACTIVE | Sep 6, 1994 |
| 020 | [ Non-metal fasteners, namely, plastic anchors for affixing/hanging pictures to drywall or sheetrock; plastic clips, namely, pipe holders and hangers used to hang and install pipe ] | SECTION 8 - CANCELLED | — |
| 024 | Towels | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Motors & Armatures, Inc.
- Other trademarks owned by Motors & Armatures, Inc.
- Other trademarks owned by Motors & Armatures, Inc.
- Other trademarks in Class 001
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 017
- Other trademarks in Class 020
- Other trademarks in Class 024
- Similar marks named MARS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 13, 2026 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| May 13, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 13, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 13, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 13, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 13, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 10, 2026 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Dec 28, 2022 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Dec 28, 2022 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Dec 28, 2022 | 9G8P | REGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8 | — |
| Dec 28, 2022 | 8PRT | REGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED | — |
| Dec 28, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 10, 2022 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Dec 13, 2020 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jan 7, 2018 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jan 7, 2018 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jan 7, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 12, 2017 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Dec 13, 2016 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jan 18, 2013 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 18, 2013 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 13, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 9, 2011 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Nov 8, 2011 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Nov 6, 2011 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Oct 26, 2011 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Oct 25, 2011 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 24, 2011 | IUAF | USE AMENDMENT FILED | — |
| Oct 24, 2011 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Apr 26, 2011 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 11, 2011 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Nov 17, 2010 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Oct 26, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 26, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 20, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 20, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 20, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 20, 2010 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 20, 2010 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 20, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 24, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 24, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 24, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 25, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 25, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 25, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 14, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 11, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jun 26, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 26, 2010 | ALIE | ASSIGNED TO LIE | — |
| Jun 13, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 11, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 11, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 11, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 6, 2010 | GAUN | NOTIFICATION OF NOTICE OF UNRESPONSIVE AMENDMENT - E-MAILED | — |
| Jun 6, 2010 | GAUD | NOTICE OF UNRESPONSIVE AMENDMENT - E-MAILED | — |
| Jun 6, 2010 | NAUD | REPORT UNRESPONSIVE AMENDMENT - COMPLETED | — |
| May 11, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 10, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 10, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 24, 2010 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 24, 2010 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 24, 2010 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 16, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 12, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 12, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 14, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 14, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 14, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 11, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 6, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 4, 2009 | NWAP | NEW APPLICATION ENTERED | — |