Drawing for ROTORK

USPTO serial 77776428

ROTORK

Reviewed by CopyMark Law Group

Reg. 3878551Status 800Registered
Filing date
Status date
Registration date
Nov 23, 2010
Examiner
LATTUCA, FRANK J
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with ROTORK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

B. Anna McCoy

B. Anna McCoy McCoy Russell LLP1410 NW Johnson StreetSUITE 201Portland, OR 97209

Goods and services

ClassDescriptionStatusFirst use
007(Based on 44(e) pursuant to European Community Foreign Registration Number 007524391) control and fail safe apparatus and installations for controlling the operation of movable equipment and mechanisms, namely, hydraulic valves, motorized valves, hydraulic valve actuators, and pneumatic valve actuators, all for use in pipelines and channels, particularly in the chemical, petro-chemical, water and waste and power generating industries, parts and fittings for the aforesaid goods; (Based on Use in Commerce) hydraulic valve actuators, pneumatic valve actuators, gear boxes other than for land vehicles, valve gear boxes other than for land vehicles, parts and fitting for the aforesaid goodsACTIVEMay 5, 1961
009(Based on 44(e) pursuant to European Community Foreign Registration Number 007524391) control and fail safe apparatus and installations for industrial processes, namely, electrical valve actuators; electronic assemblies, namely, computer hardware and computer software for monitoring and controlling industrial processes; control apparatus and installations, namely, electrical and electronic controls that operate movable equipment and mechanisms, namely, hydraulic valves, motorized valves, hydraulic valve actuators, and pneumatic valve actuators, for use in pipelines and channels; analysis apparatus and installations, namely, pressure and position sensors for the measurement of the physical properties and chemical constituents of liquids and gases used in industrial processes, particularly in the petro-chemical and chemical process industries and in emission monitoring and control applications; analysis apparatus and installations, namely, pressure and position sensors for the measurement of concentrations and chemical constituents of pollutant substances in ambient air; parts and fittings for all the aforesaid goods; (Based on Use in Commerce) electrical valve actuators; electronic assemblies, namely, computer hardware and computer software for monitoring and controlling valve actuators, industrial processes, analysis apparatus and installations, namely, pressure and position sensors for the measurement of the physical properties and chemical constituents of liquids and gases used in industrial processes, particularly in the petro-chemical and chemical process industries and in emission monitoring and control applications; analysis apparatus and installations, namely, pressure and position sensors for the measurement of concentrations and chemical constituents of pollutant substances in ambient air; parts and fittings for all the aforesaid goodsACTIVEMay 5, 1961
037(Based on 44(e) pursuant to European Community Foreign Registration Number 007524391) maintenance and repair of control and fail safe apparatus and installations, namely, hydraulic valves, motorized valves, hydraulic valve actuators, pneumatic valve actuators, electrical valve actuators, all for use in pipelines and channels, particularly in the chemical, petrochemical, water and waste and power generating industries; maintenance and repair of control and fail safe apparatus and installations for industrial processes, namely, electronic assemblies, namely, computer hardware for monitoring and controlling industrial processes, electrical and electronic controls that operate movable equipment and mechanisms, namely, hydraulic valves, motorized valves, hydraulic valve actuators, pneumatic valve actuators, electrical valve actuators, all for use pipelines and channels, and parts and fittings for all the aforesaid goods; (Based on Use in Commerce) maintenance and repair of hydraulic, pneumatic, electrical valve actuators and electronic assemblies, namely, computer hardware for monitoring and controlling industrial processes, actuators, movable equipment and mechanisms, namely, hydraulic valves, motorized valves, hydraulic valve actuators, pneumatic valve actuators, electrical valve actuatorsACTIVEMay 5, 1961

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 7, 2021NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jul 7, 2021RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jul 7, 202189AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jul 7, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 31, 2021E89RTEAS SECTION 8 & 9 RECEIVED—
Nov 23, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Apr 18, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 19, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 19, 2016C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 19, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 12, 2016E815TEAS SECTION 8 & 15 RECEIVED—
Nov 23, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 7, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 7, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 30, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 30, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 30, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jul 30, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 30, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 30, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 3, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 3, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 3, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 21, 2010PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
May 7, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 6, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 5, 2010DMCCDATA MODIFICATION COMPLETED—
May 1, 2010ACECAMENDMENT FROM APPLICANT ENTERED—
May 1, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 21, 2010ALIEASSIGNED TO LIE—
Apr 9, 2010MAILPAPER RECEIVED—
Oct 13, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 13, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 13, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 6, 2009DOCKASSIGNED TO EXAMINER—
Jul 13, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 11, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance