Drawing for ETAP THINKING POWER

USPTO serial 77782671

ETAP THINKING POWER

Reviewed by CopyMark Law Group

Reg. 3780455Status 710
Filing date
Status date
Registration date
Apr 27, 2010
Examiner
SUAREZ, MARIA VICTORIA
Law office
TMEG LAW OFFICE 102

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ETAP THINKING POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey DiTolla

Jeffrey DiTolla Operation Technology, Inc.17 GoodyearIrvine, CA 92618UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Computer software for real time analysis of electrical power systems, consisting of monitoring, simulating and control of electrical power systems for use by operators and engineers of industrial plants and power utility companiesSECTION 8 - CANCELLEDJun 29, 2005
042Conducting engineering surveys; Engineering; Engineering services, namely, engineering for the electrical power networks related to system design, analysis, operation, maintenance, and planning; Environmental services, namely, technical consultation in the field of environmental science, engineering services, design for others in the field of energy engineering, designing and testing of energy products for others; Technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; Technology consultation in the field of engineeringSECTION 8 - CANCELLEDJun 29, 2005

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 4, 2020CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Jan 17, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 17, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 27, 2019REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 6, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jul 6, 2016C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jul 6, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 27, 2016E815TEAS SECTION 8 & 15 RECEIVED—
Apr 27, 2015REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 27, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 9, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 9, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 4, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 24, 2009ALIEASSIGNED TO LIE—
Dec 7, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 3, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 2, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 2, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 29, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 29, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 29, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 29, 2009DOCKASSIGNED TO EXAMINER—
Jul 21, 2009MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Jul 20, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 20, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance