Drawing for POWER ENGINEERS

USPTO serial 77787882

POWER ENGINEERS

Reviewed by CopyMark Law Group

Reg. 3986318Status 800Registered
Filing date
Status date
Registration date
Jun 28, 2011
Examiner
CLYBURN, CARLA DIONNE
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with POWER ENGINEERS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Bradlee R. Frazer

Bradlee R. Frazer Hawley Troxell Ennis & Hawley LLP877 W. Main StreetSuite 1000Boise, ID 83702

Goods and services

ClassDescriptionStatusFirst use
042Technical consultation services in energy-related fields and power plant engineering, namely, design and implementation of power delivery systems in the nature of overhead and underground transmission lines and substations, electrical system studies, testing and energization, geographic information systems and utility automation; Providing environmental friendly automation solutions, namely, site evaluations, control design analysis, and integrated services for monitoring and controlling multiple dissimilar pieces of equipment; Engineering services for building and property condition assessment, facility management, repair and restoration, building instrumentation and monitoring, feasibility analysis, project design, project management, and environmental consulting; Technical consultation services in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; Technical consultation services in the field of gas turbine and combustion engine plant design. Industrial and architectural design services, engineering services and engineering drawing services, construction, operation, repair and maintenance of energy plants and facilities, utility and generations asset management services; Design and development of visualization technologies for photo simulation, 3-D monitoring, animation and DVD development of images of proposed buildings, power and generation facilities or infrastructures; Development of computer programs recorded on data media designed for use in construction and automated manufacturing; Building and infrastructure design services, in the nature of process design, process controls, systems integration, packaging systems design, custom equipment design and fabrication, and material handling for food and beverage manufacturing plants; Building and infrastructure design services in the fields of health care and higher education. Technical engineering services, namely, building plan reviews and inspections for code compliance and quality control issues; Engineering services in the field of environmental compliance; environmental testing, inspection services, and energy efficiency audits; Engineering computer programming for others in the nature of management of vehicular traffic flow through advanced communications network infrastructure and technology, including geographic information systems; Custom design and engineering of telephony systems, cable television systems and fiber optics communications networks; Engineering services, namely, architectural design services, urban planning, transportation management services, namely, conducting traffic impact analyses, site locations, conducting environmental assessmentsACTIVEDec 24, 1996

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 1, 2021NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Nov 1, 2021RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Nov 1, 202189AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Nov 1, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 17, 2021E89RTEAS SECTION 8 & 9 RECEIVED—
Jun 28, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 25, 2016NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 25, 2016C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 25, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 19, 2016E815TEAS SECTION 8 & 15 RECEIVED—
Jun 28, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jun 28, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 24, 2011SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 23, 2011REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
May 23, 2011CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 4, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 3, 2011SUPCSTATEMENT OF USE PROCESSING COMPLETE—
May 3, 2011EX1GSOU EXTENSION 1 GRANTED—
May 3, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 1, 2011IUAFUSE AMENDMENT FILED—
May 1, 2011EXT1SOU EXTENSION 1 FILED—
May 1, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 1, 2011EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Nov 2, 2010NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 7, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 7, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 2, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 2, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 20, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 19, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 19, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 19, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 19, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 19, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 15, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Dec 28, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Dec 11, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 11, 2009ALIEASSIGNED TO LIE—
Nov 24, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 12, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 12, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 12, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 6, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 26, 2009DOCKASSIGNED TO EXAMINER—
Jul 28, 2009MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Jul 27, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 27, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance