USPTO serial 77788052
HARSCO
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 4, 2011
- Examiner
- BLANDU, FLORENTINA
- Law office
- TMO LAW OFFICE 117
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with HARSCO?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Timothy M. Kenny
Timothy M. Kenny Norton Rose Fulbright US LLP98 San Jacinto Boulevard, Suite 1100Austin, TX 78701UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 003 | Mineral and slag products, namely, abrasives in the form of blast grit and friction granules for use in finishing, cleaning and abrading surfaces of all kinds | ACTIVE | Jul 31, 2008 |
| 006 | [ Railroad safety grating made of metal; metal grating used for walkways, platforms, floors, stairs, catwalks and other sundry applications; steel and aluminum bar grating and stair treads having a slip resistant surface bonded thereto, sold as a unit ] [; wall forms and frame shoring and forming made of steel and aluminum for the pouring and support of concrete structures; sectional tubular steel and aluminum scaffolding and shoring and forming, being prefabricated sectional units and their component parts, namely, couplers for joining scaffolding elements, metal brackets and guard rails; metal scaffolding planks; pre-engineered steel and aluminum forms for concrete form systems consisting of joists, trusses, frames and posts ] | SECTION 8 - CANCELLED | May 31, 1968 |
| 007 | [Solids blenders, mixing, and drying machines for commercial and industrial use;] railroad track construction and maintenance machines; power actuated tools, namely, lifting platforms, decks, chairs, boom and scissor lifts, and electric, battery, diesel or bi-fueled power units for operating the aforesaid power actuated tools; [powered access equipment, namely, motorized swinging scaffolds;] tie inserter/remover machines; tie crane; tie distribution/loading machine; tie bed scarifier machines; spike driver machines, spike puller machines and spike/anchor reclaimer machines; railroad track maintenance machines, namely, anchor applicator/adjuster, anchor spreader, anchor remover; clip applicator and clip remover machines; machines, namely, ballast regular, ballast broom, ballast undercutter, ballast cleaner, production rail grinder, switch and crossing grinder, rail milling machine; production tamping machine; switch tamping machine; drone tamper machine; stone blower; switch stone blower; gantry crane; tie plate broom machines for cleaning track; rail straightening machines; track stabilizer machines for applying controlled vibrational forces into the track structure to increase and improve the vertical and horizontal stability of the track | ACTIVE | Jan 31, 1970 |
| 009 | [Computer software for managing scaffold inventory and utilization] | SECTION 8 - CANCELLED | Mar 19, 1979 |
| 011 | [ Air-cooled heat exchangers for the oil and gas industry; commercial and industrial boilers; water heaters for industrial use ] | SECTION 8 - CANCELLED | Mar 31, 1979 |
| 012 | Tie cart; bulk spike cart; hy-rail vehicle; land vehicles, namely, rail corrugation measurement car and rail train, track geometry measurement vehicle, wayside measurement vehicle, catenary measurement and repair vehicle, multi-purpose track repair vehicle; track renewal train, new track construction train, and automated switch inspection vehicle; adjustable wheeled assemblies for adapting motorized highway vehicles for use on a railway track | ACTIVE | May 31, 2000 |
| 019 | Mineral based products, namely, non-metal roofing granules comprised primarily of coal slag for the manufacture of shingles, sheeting and other roofing surfaces, abrasives and metal slag-based materials; non-metal roofing granules comprised primarily of coal slag for the manufacture of shingles, sheeting and other roofing surfaces | ACTIVE | Jul 31, 2008 |
| 035 | Business management services in the nature of on-site management of railway track repair, maintenance and construction; [business management services in the nature of on-site management of scaffolding and shoring and forming operations;] business management services in the nature of on-site management of raw materials and by-products from the iron and steel making process; inventory control of raw materials and finished metal products; operating facilities for handling, processing and preparation of metal containing by-products | ACTIVE | Dec 31, 1974 |
| 037 | Railway track construction, maintenance and repair services; leasing of railway construction and maintenance machines; [ maintenance and repair of air-cooled heat exchangers; ] [ construction services, namely, erecting and dismantling access platforms and scaffolding, fencing, barriers and concrete forming and shoring; rental of scaffolding, fencing, barriers and concrete forming and shoring; maintenance and repair of scaffolding and forming and shoring;] reconditioning and servicing of steel making and processing equipment, namely, installation, cleaning, repair and maintenance services; cleaning and maintenance of steel making and processing facilities; extraction of dust and fumes that are generated during the scrap cutting or metal pouring operation; building facilities for handling, processing and preparation of metal containing by-products; erection and dismantling of temporary structures, fencing, barriers and temporary flooring[; rental of temporary scaffolding, power-operated platforms, forming walls and floors to retain wet concrete during its drying process, and stages, grandstands, turnstiles, fencing and temporary roadways for outdoor leisure and sporting events] | ACTIVE | Dec 31, 1974 |
| 039 | Warehousing services, namely, storage, packing and transporting of raw materials and finished metal products; packaging, transporting and delivery of raw materials, finished metal products and by-products by road, rail or barge | ACTIVE | Dec 31, 1977 |
| 040 | Purification and extraction of metals by chemical and magnetic methods; material treatment, namely, handling, preparation and processing of raw materials and by-products; slab slitting, cutting and surface conditioning; metal reclamation services; recovery of by-products in steel and metals production; services in injecting chemical products for use in the casting of molten metal or cement and for the treatment of waste materials and metal containing scrap; recycling services for metal industry by-products | ACTIVE | Dec 31, 1977 |
| 042 | Engineering and railway track maintenance consulting services to assist railroads with the technical analysis of the current condition of the components of their infrastructure, modes of component degradation/failure, the rate of deterioration and interactions of these components, forecasting of life of these components in service, and assistance with scheduling repair and replacement programs; engineering services in the metallurgical and infrastructure industries;[ consultation in the field of designing access solutions, namely, platforms, decks, lifts and chairs, and special formwork structures for construction projects in the infrastructure industry;] analysis and testing of materials related to metal reclamation and recovery; [research and development services of technology], in the fields of logistics, environment, industrial services, and maintenance that reduce the customer's overall cost of ownership, all relating to the metallurgical industry; research and development services of technology, [in the field of construction engineering of temporary structures; ]research and development services of technology, in the fields of new inspection technology for the track or vehicles, understanding fundamentals of track behavior or degradation, vehicle-track dynamic interaction, and new switch or turnout designs, all relating to the railway industry; research and development services of technology, in the fields of stainless steel slag mineral co-product usage, roofing, abrasive blasting and filtration, all relating to the minerals industry; design of facilities for handling, processing and preparation of metal containing by-products | ACTIVE | Dec 31, 1977 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Harsco Technologies LLC
- Other trademarks owned by Harsco Technologies LLC
- Other trademarks owned by Harsco Technologies LLC
- Other trademarks in Class 003
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 012
- Other trademarks in Class 019
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named HARSCO
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 1, 2021 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Apr 16, 2021 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Apr 16, 2021 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Apr 16, 2021 | 9G8P | REGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8 | — |
| Apr 16, 2021 | 8PRT | REGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED | — |
| Apr 16, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 4, 2021 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jul 14, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 14, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 14, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 14, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 14, 2020 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jan 4, 2020 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Aug 29, 2016 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Aug 29, 2016 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Aug 7, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 26, 2016 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Apr 6, 2016 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Apr 6, 2016 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Dec 9, 2015 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jan 10, 2013 | NOSU | NOTICE OF SUIT | — |
| May 5, 2011 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jan 4, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 19, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 19, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 13, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 11, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 10, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 9, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 9, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 11, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 11, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 11, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 3, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 31, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 22, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 22, 2010 | ALIE | ASSIGNED TO LIE | — |
| Jul 6, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 1, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 1, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 1, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 13, 2010 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 13, 2010 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 13, 2010 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 3, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 3, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 3, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 4, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 4, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 4, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 2, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 28, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 27, 2009 | NWAP | NEW APPLICATION ENTERED | — |