USPTO serial 77795490
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Victoria Friedman
Victoria Friedman Dennemeyer & Associates, LLC2 North Riverside Plaza, Suite 1500Chicago, IL 60606UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, unit machines, and mechanically operated apparatus for use in the food and food processing industries and for the production of biscuits, cookies, crackers, dough, bread, buns, bakery products, pizza, confectionery, cereals and snack foods, namely, dough mixers, dough dividers, dough moulders, dough sheeters in the nature of rolling machines, dough laminators, dough cutting machines, wirecut machines, rotary moulders, machines for assembling sandwiched cookies, cracker and snack food products, cream feed machines, flaking rolls, twin-screw extruders, co-extrusion molding machines, pillow crimpers, syrup preparation machines for mixing, syrup preparation machines as production machinery, mixing machines, depositors for food ingredients, plant or automatic plant for use in the food, food processing and for the production of biscuits, cookies, crackers, dough, bread, buns, bakery products, pizza, confectionery, cereals and snack foods, namely, bread dough forming lines, biscuit production systems, cookie production systems, cracker production systems, breakfast cereal production systems, snack production systems, confectionery production systems all comprised of machines, unit machines, and machine apparatus for mixing, processing, and handling of food and food products, namely, dough mixers, dough dividers, dough moulders, dough sheeters, dough laminators, dough cutting machines, wirecut machines, rotary moulders, sandwiching machines for the assembly of sandwiches and sandwich cookies, cream feed systems comprised of machines to discharge cream, flaking rolls, twin-screw extruders, co-extrusion machines to mold food, pillow crimpers, syrup preparation systems comprised of machines to mix syrup, mixing systems comprised of mixing machines, depositors; machines for extruding pellets for the chemical and chemical processing industries; parts and fittings for the aforesaid goods | ACTIVE | — |
| 009 | Scientific, weighing, measuring, control, monitoring, metering apparatus and instruments, namely, ingredient weighing machines, monitoring and controlling apparatus for the aforesaid goods, namely, electrical control panels, programmable logic controllers and software for programmable logic controllers, graphical user interface software; weighing systems comprised of weighing machines and weighing scales for use with plant or automatic plant for use in the food, food processing and for the production of biscuits, cookies, crackers, dough, bread, buns, bakery products, pizza, confectionery, cereals and snack foods, namely, bread dough forming lines, biscuit production systems, cookie production systems, cracker production systems, breakfast cereal production systems, snack production systems, confectionery production systems all comprised of machines, unit machines, and machine apparatus for baking, cooking, mixing, processing, heating, refrigerating, cooling, chilling, drying and handling of food and food products, parts and fittings for the aforesaid goods | ACTIVE | — |
| 011 | Installations and apparatus, all for baking, cooking, heating, mixing, processing, drying, cooling, air conditioning, refrigerating, chilling, or evaporating, namely, tunnel ovens, rotary cookers, fluidised bed toasters, toaster ovens, cooling tunnels; installations and apparatus for use in the food and food processing industries, namely, ovens, toaster ovens, bread dough forming lines, biscuit production systems, cookie production systems, cracker production systems, breakfast cereal production systems, snack production systems, and confectionery production systems all comprised of ovens and electric cooling fans or food cooling receptacles or cooling units for industrial purposes; electric ovens and gas ovens; Machines, unit machines, and mechanically operated apparatus for use in the food and food processing industries and for the production of biscuits, cookies, crackers, dough, bread, buns, bakery products, pizza, confectionery, cereals and snack foods, namely, rotary cookers; plant or automatic plant for use in the food, food processing and for the production of biscuits, cookies, crackers, dough, bread, buns, bakery products, pizza, confectionery, cereals and snack foods, namely, biscuit production systems, cookie production systems, cracker production systems, breakfast cereal production systems, snack production systems, and confectionery production systems all comprised of machines, unit machines, and machine apparatus for baking, cooking, heating, refrigerating, cooling, chilling, and drying of food and food products, namely, tunnel ovens, rotary cookers, fluidised bed toasters, toaster ovens, cookers being electric cooktops, ovens, and microwave ovens, sandwiching machines being electric sandwich makers, and cooling tunnels; replacement and structural parts and fittings for the aforesaid goods | ACTIVE | — |
| 037 | [ Installation, repair, servicing, maintenance, refurbishment and restoration of machines, unit machines, apparatus, plant or automatic plant for use in the food, food processing and beverage industries and for the production of biscuits, cookies, crackers, dough, bread, buns, bakery products, pizza, confectionery, cereals and snack foods, namely, ovens, bread dough forming lines, biscuit production systems, cookie production systems, cracker production systems, breakfast cereal production systems, snack production systems, confectionery production systems and dough mixers, dough dividers, dough moulders, dough sheeters, dough laminators, dough cutting machines, wirecut machines, rotary moulders, tunnel ovens, sandwiching machines, cream feed systems, rotary cookers, flaking rolls, fluidised bed toasters, toaster ovens, twin-screw extruders, coextrusion systems, pillow crimpers, syrup preparation systems, weighing and mixing systems, cookers, depositors, cooling tunnels; and, installation, repair, servicing, maintenance, refurbishment and restoration of extruders ] | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 1, 2022 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Aug 1, 2022 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Aug 1, 2022 | 9G8P | REGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8 | — |
| Aug 1, 2022 | 8PRT | REGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED | — |
| Aug 1, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 15, 2022 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Feb 21, 2021 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jan 4, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 12, 2018 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Apr 12, 2018 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Apr 12, 2018 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Jun 14, 2017 | AMD7 | SEC 7 REQUEST FILED | — |
| Jun 14, 2017 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jun 14, 2017 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Jun 2, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 18, 2017 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Feb 21, 2017 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Feb 21, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 14, 2012 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 6, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 6, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 16, 2011 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 31, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 27, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 27, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 27, 2011 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 27, 2011 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 27, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 25, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 25, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 25, 2011 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 29, 2011 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 29, 2011 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 29, 2011 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 11, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 11, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2011 | ALIE | ASSIGNED TO LIE | — |
| Apr 8, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 17, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 17, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 17, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 3, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 3, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 3, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 7, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 7, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 7, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 6, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 6, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 6, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 29, 2010 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 29, 2010 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 6, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 6, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 6, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 5, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 7, 2009 | MDSM | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Aug 6, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 6, 2009 | NWAP | NEW APPLICATION ENTERED | — |