USPTO serial 77795616
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Europa Link, Sheffield, GB
Europa Link, Sheffield, GB
Europa Link, Sheffield, GB
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jody H. Drake
JODY H. DRAKE SUGHRUE MION, PLLC2100 PENNSYLVANIA AVE NWWASHINGTON, DC 20037-3202UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Tanks, cylinders and receptacles of metal for use in the storage of gases, liquefied gases and compressed gases; structural parts and fittings for all the aforesaid goods | SECTION 8 - CANCELLED | — |
| 007 | Electric circulating pumps for central heating installations; electricity generators; generators utilizing hydrogen for the production of electricity; structural parts and fittings for all the aforesaid goods | SECTION 8 - CANCELLED | — |
| 009 | Scientific apparatus, namely, gas storage modules comprising of electronic power converters, power supply, electric switches, power line conditioners, step-up and step-down transformers, electric generators, voltage stabilizing power supply, power line conditioning modules, electric power distribution conversion modules, power supply modules, electric switch modules, step-up power boost electronic modules, step-down power boost electronic modules, switch mode power supply modules, power supply matching modules, and containers for gas and water and electric generators; apparatus for conducting, storing, switching, transforming, accumulating, regulating and/or controlling electricity, namely, DC/DC converters, AC/DC converters, AC/AC converters, DC/AC converters, electrodes, electrical connectors; electronic instruments which monitor and control the performance of DC/DC converters, AC/DC converters, AC/AC converters, DC/AC converters; fuel cells; electrolysers; photoelectrolysers; apparatus for the control and monitoring of fuel cells, electrolysers and photoelectrolysers, namely, electronic modules for detecting gas flow rate, electronic modules for detecting water flow rate, and electronic modules for detecting liquid flow rate; photovoltaic solar modules and panels for production of electricity, photovoltaic cells; solar panels and solar cells for the production of electricity; scientific testing apparatus and instruments for the purposes of measuring the amount of hydrogen and oxygen produced by the process of photoelectrolysis for use in connection with apparatus for photoelectrolysis; scientific testing apparatus and instruments for the purposes of measuring the amount of fuel produced for use in connection with apparatus for converting hydrogen into electricity; solar cells; thermostats, other than valves, for central heating installations; computer software for monitoring, regulating and controlling DC/DC converters, AC/DC converters, DC/AC converters, AC/AC converters, fuel cells, electrolysers, photoelectroalysers, central heating systems, hot water systems; thermostats; rheostats; instruments and apparatus for temperature control in central heating installations and hot water installations, namely, thermostats; structural parts and fittings for all the aforesaid goods | SECTION 8 - CANCELLED | — |
| 011 | Hydrogen generators; hydrogen burning generators; hydrogen and oxygen generators for the purposes of generating hydrogen and oxygen from water and/or renewable electricity; refrigerators; refrigerators powered by hydrogen; electrical boilers; heat exchangers; steam generators; boilers powered by hydrogen; steam generators powered by hydrogen; installations combining boilers and steam generators for heating; installations combining boilers and steam generators for producing hot water; heat exchangers; induction, convection, and gas burning ovens, and induction, convection, and gas burning ovens utilizing hydrogen; hydrogen hobs, namely, cooking ranges; solar panels for use in heat collection; thermostatic valves; thermostatic valves for controlling temperature in central heating radiators; expansion hot water tanks for central heating installations and hot water installations; structural parts and fittings for all the aforesaid goods | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 13, 2018 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Dec 6, 2016 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 6, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 20, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 20, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 18, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 17, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 17, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 17, 2011 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 17, 2011 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 17, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 11, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 11, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 11, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 24, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 24, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 20, 2011 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jan 20, 2011 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Jan 20, 2011 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Jan 20, 2011 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jan 13, 2011 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jan 11, 2011 | ALIE | ASSIGNED TO LIE | — |
| Jun 29, 2010 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jun 29, 2010 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jun 29, 2010 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jun 25, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 25, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 25, 2010 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| May 25, 2010 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| May 25, 2010 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| May 25, 2010 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 10, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| May 6, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 6, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 6, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 6, 2009 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 6, 2009 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 6, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 5, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 7, 2009 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Aug 6, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 6, 2009 | NWAP | NEW APPLICATION ENTERED | — |