Drawing for WHI INTERTEK

USPTO serial 77851622

WHI INTERTEK

Reviewed by CopyMark Law Group

Reg. 3978865Status 710
Filing date
Status date
Registration date
Jun 14, 2011
Examiner
BLOHM, LINDA
Law office
TMO LAW OFFICE 110

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with WHI INTERTEK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

B. Brett Heavner

B. BRETT HEAVNER FINNEGAN, HENDERSON, FARABOW, GARRETT & DUNNER, L.901 NEW YORK AVE NWWASHINGTON, DC 20001-4432UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
AFire resistant products and components, namely, access door/frame assemblies, dampers, doors, door frames, door and frame hardware, door light frames, elevator door/frame assemblies, expansion/seismic joints, fire retardants, fire retardant treated woods, fire window frames, garbage chutes, gasketing, seals, and thresholds, glazing/glass, linen chute door/frame assemblies, proscenium fire safety curtains, roof/ceiling and floor/ceiling assemblies, roof covering systems; specialty fire door and frame assemblies and components, namely, countertops for use with vertical rolling doors, security fire door and frame assemblies, through-penetration firestopping systems, wall assemblies, and wall exterior insulation and finish systems; building materials with surface burning characteristics, namely, insulations, sealants, laminates, fire retarded treated wood, fabrics, wall, floor and ceiling coverings, and curtains; solid fuel burning appliances and accessories, namely, ranges and stoves, space heaters, furnaces, fireplace inserts and factory built fireplaces, boilers, water heaters, venting pipe, chimneys and chimney lining systems, and heat shields; fire protection equipment, namely, fire extinguishers, and sprinklers; gas equipment, namely, natural, propane and butane fired appliances and accessories, namely, domestic and commercial heating, decorative, food processing, [ laundry, ] water heating and portable type camping equipment; pipe, hoses, couplings and manual valves; fenestration and security products, namely, residential, commercial and industrial windows and doors, and window and door hardware; plumbing products, namely, fittings and accessories, fixtures such as sinks, shower stalls, bathtubs, water closets, bidets, pipe and underground ducting, and couplings and cements; manufactured wood products, namely, building panels, finger joined, machine stress-rated lumber, laminated veneer lumber, preserved wood foundation materials, structural glued-laminated timber, wood I beams, columns and open web trusses, wood shakes and shingles, and preservative treated woodSECTION 8 - CANCELLEDSep 1, 2010

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 17, 2021CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Jun 14, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 5, 2017NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 5, 2017C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 21, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 1, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 27, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 9, 2017E815TEAS SECTION 8 & 15 RECEIVED—
Jun 14, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 13, 2011SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 12, 2011REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
May 9, 2011CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 7, 2011SUPCSTATEMENT OF USE PROCESSING COMPLETE—
May 5, 2011IUAFUSE AMENDMENT FILED—
May 5, 2011EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Apr 5, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 4, 2011EX1GSOU EXTENSION 1 GRANTED—
Apr 4, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 30, 2011EXT1SOU EXTENSION 1 FILED—
Mar 30, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 26, 2010NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 31, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 31, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 28, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 22, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 20, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 20, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2010ALIEASSIGNED TO LIE—
Jul 8, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 13, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 11, 2010DOCKASSIGNED TO EXAMINER—
Oct 23, 2009MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Oct 22, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 22, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance